KitLog pro

Powered By Kitlog Pro v2.0

LLOYD'S WEB SITE
Work Logs Found: 37
Category Work Time: 116 Hours
 Date
Hours
Work Log Summary

Details

 11-03-2011
3.50
Fitted tail cone to fuselage
Details
       

 10-31-2011
2.50
Fitting and attaching tail cone
Details
       

 10-29-2011
3.50
Removed stabilator, Started fitting til cone
Details
       

 12-31-2010
1.50
Installed Vstab and Rudder top fairings
Details
       

 12-29-2010
2.00
Fabricated anti servo Linkage
Details
       

 12-27-2010
5.00
Installed anti Servo Tabs, started trim system
Details
       

 12-24-2010
2.00
Installed stabilator
Details
       

 12-24-2010
2.00
Installed the stabilator
Details
       

 12-24-2010
2.00
Install Stabilator
Details
       

 12-22-2010
3.00
Installed vertical stab and rudder
Details
       

 12-22-2010
3.00
Installed Vertical Stab and rudder
Details
       

 12-18-2010
1.50
Finished riveting top skin
Details
       

 12-17-2010
4.00
Assembled and clecoed top skin
       

 12-15-2010
4.00
Asm. Side Skins
Details
       

 12-14-2010
2.00
Installed Static ports/Clecoed Upper L.H. Skin
Details
       

 12-11-2010
1.50
Assembling Empennage
Details
       

 12-10-2010
5.50
Rear Empennage Assembly
Details
       

 12-10-2010
4.00
Assemble Rear empennage
Details
       

 12-08-2010
3.00
Complete Aft Bulkhead
Details
     

 12-07-2010
2.50
Fabricate the Aft Bulkhead
Details
       

 12-06-2010
3.50
Fabricating frames
Details
       

 12-05-2010
2.00
Completed riveting on Hstab
Details
       

 12-04-2010
4.00
Riveting hstab skins
Details
       

 12-03-2010
2.00
Prep hstab for riveting
Details
       

 12-02-2010
2.00
Assemble hstab ribs
Details
     

 11-28-2010
3.00
Assemble hstab ribs
Details
       

 11-27-2010
5.00
Assemble hstab spar box
Details
     

 11-26-2010
3.50
Start Hstab spar box
Details
       

 11-25-2010
7.00
Fabricate anti-servo tabs
Details

 11-22-2010
4.00
Final asm. rudder
Details
     

 11-20-2010
3.50
Prep, assemble rudder
Details
       

 11-19-2010
3.50
final asm. vstab
Details
       

 11-19-2010
6.50
final asm vstab
Details
     

 11-17-2010
2.00
Fab vertical stab - csking, lable making, inventor
Details
       

 11-14-2010
1.00
fab V-stab main spar - deburring
       

 11-13-2010
4.00
Fab v-stab spar
Details
       

 11-10-2010
2.00
Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.