Powered By Kitlog Pro v2.0
Anthonys Web Site
RV8A
baffeling
Work Logs Found:
40
Category Work Time:
104 Hours
Date
Hours
Work Log Summary
Details
10-05-2010
4.00
fabricated and installed rods to attach tabs of l
Details
10-04-2010
1.50
refit rubber seals around front
Details
09-30-2010
4.00
riveted on rubber seal, fit seal to intake, trim c
Details
09-29-2010
1.00
Riveting on rubber seal
Details
09-28-2010
1.00
front seals
Details
09-27-2010
3.00
Drilled and clecoed baffle seals
Details
09-26-2010
6.00
move scat tube mount, begin seal installation
Details
09-25-2010
2.50
Riveted on corner support piece
Details
05-10-2010
0.50
oil cooler support bracket
Details
05-02-2010
1.00
trim to fit, open wire holes
Details
04-30-2010
2.00
final fitting of baffles
Details
04-28-2010
2.00
hole for fuel hose and scat tub for mech fuel pump
Details
04-27-2010
2.00
pass thru for wires and scat hoses
Details
04-20-2010
2.00
cabin heat opening
Details
04-19-2010
0.50
cleaned up baffles
Details
04-18-2010
2.50
doublers, retention clips
Details
04-16-2010
1.00
retention clip and doubler fabrication
Details
04-12-2010
2.00
Almost finished with the riveting
Details
04-10-2010
4.00
baffle - oil cooler mounting area
Details
04-09-2010
1.50
oil cooler section of baffle
Details
04-08-2010
2.50
Oil Cooler area
Details
04-07-2010
2.00
Final trimming
Details
04-06-2010
3.00
Trim top baffle to cowl gap
Details
04-05-2010
5.00
finished trimming the top
Details
04-02-2010
2.50
trimming the top
Details
04-01-2010
3.00
trimmed the top
Details
03-31-2010
3.50
fitting- finger spacer-replace angle on corner
Details
03-30-2010
3.00
complete riveting
Details
03-29-2010
1.50
front bulhead attachment to inlet ramps
Details
03-29-2010
0.50
EAA Tech Inspection
Details
03-28-2010
1.50
front bulkheads
Details
03-21-2010
6.00
inlets and front front bulkheads
Details
03-18-2010
4.50
inlet floors
Details
03-16-2010
0.50
making braces
Details
03-15-2010
8.00
inlet ramps
Details
03-14-2010
6.00
Fabricated and clecoed pieces on front
Details
03-13-2010
4.50
initial fitting of baffles
Details
03-03-2010
1.00
Baffeling
Details
02-15-2010
0.50
riveted on small part - training
Details
02-12-2010
0.50
drilled small piece
Details
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
559
1548
Avionics
101
342
baffeling
40
104
canopy
89
236
canopy
45
112
cowl
50
137
electrical
10
24
Electrical
58
180
Empennage
12
35
Engine
5
7
Firewall Forward
89
236
Fuselage
31
64
General
3
4
Instruments
2
4
Miscellaneous
2
6
panel
13
44
Shop Supplies
1
1
Systems
8
12
Copyright © 2001-2024 Matronics. All Rights Reserved.