KitLog pro

Powered By Kitlog Pro v2.0

Anthonys Web Site
Work Logs Found: 40
Category Work Time: 104 Hours
 Date
Hours
Work Log Summary

Details

 10-05-2010
4.00
fabricated and installed rods to attach tabs of l
Details

 10-04-2010
1.50
refit rubber seals around front
Details

 09-30-2010
4.00
riveted on rubber seal, fit seal to intake, trim c
Details

 09-29-2010
1.00
Riveting on rubber seal
Details

 09-28-2010
1.00
front seals
Details

 09-27-2010
3.00
Drilled and clecoed baffle seals
Details

 09-26-2010
6.00
move scat tube mount, begin seal installation
Details

 09-25-2010
2.50
Riveted on corner support piece
Details

 05-10-2010
0.50
oil cooler support bracket
Details

 05-02-2010
1.00
trim to fit, open wire holes
Details

 04-30-2010
2.00
final fitting of baffles
Details

 04-28-2010
2.00
hole for fuel hose and scat tub for mech fuel pump
Details

 04-27-2010
2.00
pass thru for wires and scat hoses
Details

 04-20-2010
2.00
cabin heat opening
Details

 04-19-2010
0.50
cleaned up baffles
Details

 04-18-2010
2.50
doublers, retention clips
Details

 04-16-2010
1.00
retention clip and doubler fabrication
Details

 04-12-2010
2.00
Almost finished with the riveting
Details

 04-10-2010
4.00
baffle - oil cooler mounting area
Details

 04-09-2010
1.50
oil cooler section of baffle
Details

 04-08-2010
2.50
Oil Cooler area
Details

 04-07-2010
2.00
Final trimming
Details

 04-06-2010
3.00
Trim top baffle to cowl gap
Details

 04-05-2010
5.00
finished trimming the top
Details

 04-02-2010
2.50
trimming the top
Details

 04-01-2010
3.00
trimmed the top
Details

 03-31-2010
3.50
fitting- finger spacer-replace angle on corner
Details

 03-30-2010
3.00
complete riveting
Details

 03-29-2010
1.50
front bulhead attachment to inlet ramps
Details

 03-29-2010
0.50
EAA Tech Inspection
Details

 03-28-2010
1.50
front bulkheads
Details

 03-21-2010
6.00
inlets and front front bulkheads
Details
       

 03-18-2010
4.50
inlet floors
Details
       

 03-16-2010
0.50
making braces
Details

 03-15-2010
8.00
inlet ramps
Details
       

 03-14-2010
6.00
Fabricated and clecoed pieces on front
Details
     

 03-13-2010
4.50
initial fitting of baffles
Details
     

 03-03-2010
1.00
Baffeling
Details

 02-15-2010
0.50
riveted on small part - training
Details

 02-12-2010
0.50
drilled small piece
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.