KitLog pro

Powered By Kitlog Pro v2.0

Anthonys Web Site
Work Logs Found: 89
Category Work Time: 236 Hours
 Date
Hours
Work Log Summary

Details

 05-24-2011
0.50
FAB
Details

 05-24-2011
2.00
EIS wiring
Details

 05-20-2011
1.00
wiring
Details

 05-19-2011
1.00
wiring
Details

 05-18-2011
2.00
EIS wiring
Details

 05-12-2011
3.00
Wiring..alt..e/p mags
Details

 05-11-2011
2.50
EIS wiring
Details
       

 05-10-2011
4.00
EIS wiring
Details
     

 05-07-2011
2.00
E/Pmag wiring
Details

 05-06-2011
5.00
Emag and Pmag wiring
Details

 05-05-2011
2.00
EIS wiring
Details

 05-04-2011
3.50
EIS wiring
Details

 05-02-2011
2.50
EIS wiring
Details

 04-28-2011
4.00
EIS wiring
Details

 04-27-2011
5.00
EIS wiring
Details
     

 04-26-2011
1.00
EIS wiring
Details

 04-20-2011
2.00
EIS wiring spark plug wiring
Details

 04-19-2011
3.00
spark plug wires
Details
       

 04-18-2011
2.00
FAB and wiring
Details

 04-14-2011
4.00
fabricating FAB mount plate.
Details

 04-07-2011
3.50
FAB alignment, firewall passthrough for electrical
Details

 03-24-2011
4.00
made fuel line and installed breather tube
Details
     

 03-23-2011
2.50
fuel hose and ground cable
Details

 03-22-2011
3.00
hose fittings, breather tube, alt cable
Details
     

 03-16-2011
0.50
Starter cable
Details

 03-14-2011
5.00
hose connections, EIS connections
Details
       

 03-09-2011
4.00
manifold spacer - oil and fuel sensors
Details
     

 03-08-2011
6.00
engine sensors and hoses
Details

 03-07-2011
2.00
FAB alignment shop organization
Details

 03-04-2011
6.00
Built FAB and fiberglass work on cowl
Details

 03-01-2011
2.00
fuel and oil system diagrams
Details

 05-04-2010
2.00
installed oil tube, hose fitting issue
Details

 04-30-2010
1.50
determine fittings needed
Details

 04-27-2010
1.00
fuel hose from servo to divider
Details

 04-26-2010
1.00
determining fittings and hose runs
Details

 04-20-2010
2.00
determining hoses, fittings and other needs
Details

 04-19-2010
0.50
determining fittings and hose routes
Details

 10-20-2008
4.50
spacer for FAB
Details

 10-13-2008
3.00
remake of spacer for fuel servo
Details

 10-08-2008
3.00
FAB
Details

 10-06-2008
4.00
mixture and throttle rigging
Details

 10-05-2008
8.00
mixture and throttle rigging
Details

 10-03-2008
4.50
FAB and engine cable controls
Details

 09-08-2008
2.50
throttle to FAB spacer
Details

 08-25-2008
2.50
spacer for FAB to fuel injection unit
Details

 08-09-2008
2.00
exhaust, cowl
Details
       

 08-08-2008
1.00
exhaust hangers
Details
     

 08-07-2008
2.50
exhaust
Details

 08-06-2008
2.50
cooling ramp, exhaust
Details

 08-05-2008
3.00
cooling ramp, cowling
Details

 07-14-2008
1.00
baffles
Details

 07-13-2008
1.00
oil temp sender and dipstick tube
Details

 07-12-2008
3.00
EIS probes and Spinner plate
Details

 04-05-2008
2.00
skybolt mounting strip
Details

 03-23-2008
1.50
cowl mounting strip
Details
       

 03-23-2008
2.50
Cowl fastener mounting strip, drying plugs
Details

 03-20-2008
1.00
cowl
Details

 03-18-2008
1.50
cowling
Details

 03-04-2008
4.00
cowl mounting strips
Details

 03-03-2008
4.00
exhaust, cowling mounting strips
Details

 03-02-2008
0.50
Installed the lst AN3 bolt on the throttle quadran

 02-24-2008
2.50
throttle and mixture cables; quadrant
Details

 02-23-2008
2.00
Throttle and mix cables, throttle body, FAB
Details

 02-18-2008
1.00
throttle cable bracket
Details

 02-04-2008
0.75
throttle and mixture cables attach to quadrant
Details
       

 02-03-2008
0.50
inventory and store engine parts
Details

 02-02-2008
6.00
Mounted engine
Details
       

 01-29-2008
1.00
Engine mount, nosegear leg
Details

 01-27-2008
3.00
engine mount
Details
     

 01-26-2008
2.00
firewall penetration for fuel, prepare for engine
Details

 01-14-2008
1.00
quadrant cable path
Details

 01-04-2008
1.00
main gear brake flange attachment
Details

 08-12-2007
4.00
cabin heat box and nosegear mod to engine mount
Details

 08-04-2007
3.50
cabin heat box, firewall penetrations
Details
       

 07-30-2007
0.50
Marked firewall locations for drilling
Details

 07-28-2007
6.00
firewall preparation, cutting, drilling
Details

 07-27-2007
0.50
drilling holes for engine mount
Details

 07-23-2007
2.50
fitting engine mount
Details

 05-09-2007
2.50
trimming and fitting
Details

 04-19-2007
2.00
canopy side rails
Details

 04-15-2007
8.00
frame and rails
Details

 04-15-2007
8.00
canopy frame
Details

 04-14-2007
2.00
slider rail
Details

 04-13-2007
3.00
slider rail
Details

 04-12-2007
2.50
slider rail
Details

 04-11-2007
1.50
slider rail
Details

 04-10-2007
2.00
slide rail
Details

 04-08-2007
2.00
inventory of canopy parts slider rail spacer
Details

 04-07-2007
1.00
roller system and inventory of canopy parts
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.