Work Logs Found: 24
Category Work Time: 47 Hours
 Date
Hours
Work Log Summary

Details

 09-27-2012
0.50
Riveted bottom flange of F-1211 to tailcone skins

 07-04-2011
1.00
Hung completed tailcone to garage ceiling
Details
       

 07-02-2011
2.50
Clecoed and riveted topskin to tailcone
Details
       

 07-01-2011
1.50
Match drilled and prepared top tailcone skin
Details
       

 06-24-2011
3.25
Riveted F1280 and F1279 L/R skins to frame
Details
       

 06-24-2011
1.00
Completed static system - attached tubes
Details
       

 06-19-2011
0.50
Primed inner surface of F-1279 L/R skins
       

 06-18-2011
1.00
Riveted nutplates to F12106 Fwd Skin Rib
Details
       

 06-18-2011
2.00
Began preping the 1279 L/R skins for tailcone
Details
       

 06-17-2011
3.00
Trim wire and static system install
Details
       

 06-17-2011
1.00
Clecoed F-1280 R/L to tailcone
Details
       

 06-17-2011
1.00
Began prep of snap bushing bracket and F-12106
Details

 06-16-2011
2.50
Prepared 1280 L R Side Skins
Details
       

 06-12-2011
1.50
Measured and glued washers for F-1211 assembly to
Details
       

 06-12-2011
0.50
Clecoed F-1211 assemble to the tailcone
Details
       

 06-08-2011
3.00
Riveted bottom and side skins on tailcone
Details
       

 06-07-2011
1.25
Primed 1281 L/R tail skins
Details
       

 06-06-2011
3.50
Clecoed bottom skins and began working on 1281 L/R
Details
       

 06-05-2011
1.75
Began working on bottom tail skins
Details
       

 06-05-2011
5.00
Assembled and riveted bulkhead
Details
       

 06-04-2011
2.00
Prepared bulkhead and other parts.
Details
       

 06-03-2011
1.50
Prepared bulkhead doubler - primed and painted par
Details
       

 06-02-2011
2.50
Riveted fuselage and fabricated skid bracket
Details
       

 05-30-2011
4.00
Began working on tailcone
Details
       