Powered By Kitlog Pro v2.0
Bill & Brendas RV-8 QB
RV-8
Wings
Work Logs Found:
43
Category Work Time:
123 Hours
Date
Hours
Work Log Summary
Details
09-06-2014
1.00
Rubber gap seal installed left wing root
Details
08-09-2013
0.25
changed pitot aluminum to plastic transition in wi
Details
04-12-2012
0.75
Wing T405 bracket cuts
Details
03-12-2012
1.50
Final nutplate instalation and nylon pitot line
Details
03-07-2012
3.25
Rt wing inbd edge platenut install-2
Details
03-04-2012
6.50
Finish plate nuts on left wing and start right win
Details
03-03-2012
5.00
left wing inbd rib nutplate install-1
Details
12-02-2011
6.00
Right wing bottom obd wing panel
Details
11-27-2011
5.00
Final rivitting of the left bottom wing panel
Details
11-26-2011
3.00
Left wing bottom obd skin rivitting-1
Details
11-16-2011
4.00
NACA vent install and Tank attach bracket
Details
11-04-2011
1.00
Aileron control stop modification
Details
08-14-2011
0.50
L and R fuel tank leak test
Details
08-13-2011
0.25
Fuel tank left side leak test try #2
Details
08-08-2011
0.50
Fuel tank leak test-1 Left tank
Details
07-23-2011
2.00
Fuel tanks closed up
Details
07-17-2011
1.00
Wire run for wing lights and stall warning
Details
07-09-2011
0.75
Retorque
Details
07-02-2011
3.50
Stall warner final assembly/instal (minus power su
Details
06-30-2011
6.00
Stall warner assembly
Details
06-29-2011
3.50
Scarfing corners, access panel plate nuts, primer
Details
06-29-2011
3.00
left side flap install
Details
06-27-2011
0.75
bottom wing skin
Details
06-26-2011
3.75
Left wing bottom obd skin
Details
06-25-2011
4.00
Rt wing flap install
Details
06-25-2011
3.00
Left wing bell crank and aileron assembly
Details
06-20-2011
5.00
Aileron pushrods and aileron install rt wing
Details
06-18-2011
1.50
Wing skin, ribs, bushings
Details
06-15-2011
5.25
Pitot flaring, Bottom skin work
Details
06-13-2011
1.00
bottom obd wing skin
Details
06-12-2011
5.25
Floats, Pitot, Tie downs, spacers, head scratching
Details
06-12-2011
0.00
6/12/11 part two pics only
Details
06-11-2011
4.50
Finish fabricating the large aileron pushrods
Details
06-11-2011
3.25
Aileron inbd and obd hinge install
Details
06-06-2011
2.50
Fuel float bend and cut. Aileron control stop tabs
Details
06-06-2011
3.50
Aileron push rods
Details
06-05-2011
1.50
push rods
Details
06-05-2011
4.00
Aileron gap fairing
Details
05-30-2011
2.75
Flap braces
Details
05-30-2011
3.25
5-30-11 part 2. Flap braces
Details
05-29-2011
2.75
Attaching the aileron brackets to wing spars
Details
05-29-2011
4.25
Aileron brackets
Details
05-28-2011
3.00
Quickbuild wings plans
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1040
2332
baffles
37
97
brake system
16
23
Canopy
64
162
Canopy skirt
47
75
Canopy/windscreen
64
162
cowling
58
130
electical-FWF
4
3
Electrical-cockpit
12
16
Elevators
20
63
Empennage
11
28
Engine
20
41
Exterior lights and
6
8
FAB
16
36
Fiberglass fairings
9
8
Fiberglass tips
46
68
Firewall Forward
46
90
Fuselage
136
329
Horizontal Stabilize
15
68
interior cushions an
3
8
Inventory
8
19
jigs, cradles, stand
6
15
Kit arrival
7
6
labels and plackards
2
3
Landing gear
17
40
Lights
12
28
Miscellaneous
56
96
None
1
1
Panel
40
78
paperwork
2
4
phase one tests
4
Practice kit
6
23
practice kit or tria
1
2
Prop
12
29
Propeller/Spinner
12
29
Rudder
16
43
Seats and floors
7
31
Tools
1
1
Vertical Stabilizer
8
18
weight and balance
3
8
Wing Fit/install
27
76
Wing Fitting
27
76
wing tip lights and
5
16
Wing Tips
7
20
Wings
43
123
Wire work
22
27
Wiring behind panel
34
63
wiring-cabin
24
42
Copyright © 2001-2025 Matronics. All Rights Reserved.