Powered By Kitlog Pro v2.0
Mike & Aneta's RV Projects
RV-10
Empennage
Work Logs Found:
15
Category Work Time:
47 Hours
Date
Hours
Work Log Summary
Details
06-04-2012
3.00
Trim Bellcrank and Disassembling the Tail
Details
05-30-2012
3.00
RV-1 Visit & Assembling the Trim Bellcrank
Details
05-29-2012
2.00
Fabricating Elevator Trim Brackets
Details
05-28-2012
3.00
Attaching the Rudder
Details
05-27-2012
2.00
Attaching the Elevator Pushrod
Details
05-26-2012
4.00
Fabricating the Pushrod
Details
05-25-2012
3.00
Attaching the Vertical Stabilizer
Details
05-24-2012
3.00
Attaching the Horizontal Stabilizer
Details
05-22-2012
1.00
Fabricating Shims for Horizontal Stabilizer
Details
05-20-2012
4.00
Building a Tailcone Dolly
Details
05-19-2012
8.00
Fitting the Elevators to the Horizontal Stabilizer
Details
05-28-2011
5.00
Inventorying the Empennage Kit
Details
05-25-2011
4.00
Inventorying the Emp Kit
Details
03-09-2011
1.00
Emp Kit Arrives!
Details
02-22-2011
1.00
Got new doors and ordered the Emp.
Details
SITE NAVIGATION
Contact Builder
F-14 Top Cat Home
RV-3B Home
RV-10 Home
Category
# Logs
# Hours
All
662
2548
"The Back Story"
18
3
Elevators
22
107
Empennage
15
53
Fuel Tanks
84
332
Fuselage
222
724
Horizontal Stabilzer
16
63
Options
41
136
Primer & Paint
4
37
Rudder
15
50
Shop
30
223
Tailcone
27
108
Tools
3
5
Training
23
132
Upholstery
4
18
Vertical Stabilizer
20
81
Wings
118
476
Copyright © 2001-2024 Matronics. All Rights Reserved.