KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
Work Logs Found: 15
Category Work Time: 47 Hours
 Date
Hours
Work Log Summary

Details

 06-04-2012
3.00
Trim Bellcrank and Disassembling the Tail
Details

 05-30-2012
3.00
RV-1 Visit & Assembling the Trim Bellcrank
Details
       

 05-29-2012
2.00
Fabricating Elevator Trim Brackets
Details
     

 05-28-2012
3.00
Attaching the Rudder
Details
     

 05-27-2012
2.00
Attaching the Elevator Pushrod
Details
       

 05-26-2012
4.00
Fabricating the Pushrod
Details
     

 05-25-2012
3.00
Attaching the Vertical Stabilizer
Details
     

 05-24-2012
3.00
Attaching the Horizontal Stabilizer
Details

 05-22-2012
1.00
Fabricating Shims for Horizontal Stabilizer
Details

 05-20-2012
4.00
Building a Tailcone Dolly
Details

 05-19-2012
8.00
Fitting the Elevators to the Horizontal Stabilizer
Details
       

 05-28-2011
5.00
Inventorying the Empennage Kit
Details
       

 05-25-2011
4.00
Inventorying the Emp Kit
Details
       

 03-09-2011
1.00
Emp Kit Arrives!
Details
       

 02-22-2011
1.00
Got new doors and ordered the Emp.
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.