KitLog pro

Powered By Kitlog Pro v2.0

Mike & Aneta's RV Projects
Work Logs Found: 30
Category Work Time: 197 Hours
 Date
Hours
Work Log Summary

Details

 04-04-2017
3.00
Build Temporary Landing Gear-Continued
Details
     

 04-03-2017
2.00
Build Temporary Landing Gear
Details
     

 03-26-2015
4.00
Clean, Reorganize Shop
Details

 07-05-2013
1.00
Hanging up maps for motivation
Details
     

 11-18-2012
6.00
Building the Rolling Wing Stand/Clean up
Details
       

 06-09-2012
5.00
Disassembling the Tail & Cleaning the Shop
Details
     

 04-22-2012
5.00
Shop Cleanup
Details

 01-20-2012
1.00
Stocking the Fridge
Details
       

 06-25-2011
4.00
Dimpler Table Part 2
Details
       

 06-21-2011
3.00
Dimpler Table Part 1
Details
       

 06-13-2011
2.00
Decorated the Shop
Details
       

 06-11-2011
4.00
Hanging Shelves
Details

 06-10-2011
2.00
Assembling Drill Press and other tools
Details
     

 06-08-2011
2.00
Assembling Futon
Details
     

 06-05-2011
6.00
Air Line Regulators
Details
       

 06-01-2011
4.00
Compressor Setup
Details
       

 05-28-2011
2.00
Coating Tables with Polyurethane
Details
     

 05-24-2011
4.00
Assembling Shelves
Details
       

 05-22-2011
8.00
Finishing the Retractable Wheels
Details
       

 05-21-2011
6.00
Building EAA Tables
Details
       

 05-14-2011
16.00
Building the EAA Work Tables
Details
       

 05-08-2011
8.00
Epoxy-coating Cured
Details
       

 05-07-2011
8.00
Epoxy-coating the Floors
Details
       

 04-23-2011
16.00
Grinding the Floors
Details
       

 04-16-2011
16.00
Painting
Details
       

 04-02-2011
16.00
More Grinding and Sanding
Details
       

 03-26-2011
16.00
Shop Construction
Details
       

 03-19-2011
16.00
Shop Construction
Details
       

 03-12-2011
10.00
Shop Construction
       

 12-25-2010
1.00
Before Pictures of the Shop
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.