KitLog pro

Powered By Kitlog Pro v2.0

Sonex N367SX
Work Logs Found: 110
Category Work Time: 243 Hours
 Date
Hours
Work Log Summary

Details

 05-11-2013
5.00
Working on final punch list for airworthiness insp
Details
       

 01-02-2013
2.00
Installed fuel cutoff lever
Details
     

 12-12-2012
2.00
Throttle and mixture cable relocation
Details
       

 12-11-2012
2.00
Canopy installation
Details
       

 11-15-2012
1.00
Seat cushion installation
       

 11-09-2012
2.50
Made seat templates and ordered seat cushions
     

 08-12-2012
2.00
Fuel fill tray install
Details
     

 07-16-2012
2.00
Engine Build - spark plug install
Details
       

 04-29-2012
4.00
Glare shield installation
Details
       

 04-26-2012
1.00
Fuel tank installation - Things to not to do!
Details
 

 04-24-2012
1.00
Fuel tank installation
Details
       

 04-23-2012
1.00
Fuel tank pressure test
Details
       

 04-22-2012
3.50
Fuel tank installation
Details
       

 04-21-2012
4.00
Fuel tank installation
Details
       

 04-19-2012
2.00
Installed Throttle Quadrant
Details
       

 04-16-2012
2.00
Fuel tank prep
Details
       

 04-15-2012
3.00
Glare shield fuel tank prep
Details
       

 04-14-2012
2.00
Instrument panel electrical installation
Details
       

 04-12-2012
1.50
Stick grips installation
Details
       

 04-10-2012
1.00
Stick grips
Details
     

 04-09-2012
1.75
Fuel tank strap install
Details
       

 04-07-2012
3.50
Gascolator install
Details
       

 04-03-2012
1.50
Gascolator mounting tray fabrication
Details

 04-02-2012
2.00
Instrument panel electrical installation
Details
       

 04-01-2012
2.00
Instrument panel electrical installation
Details
       

 03-31-2012
7.00
Instrument panel electrical installation
Details
       

 03-27-2012
1.00
Installed control bungee cord
Details
       

 03-18-2012
3.00
Installed ELT
Details
       

 03-17-2012
4.00
Installed COM and ELT antennas
Details
       

 03-15-2012
2.00
Fuel tank strap fabrication
Details
     

 03-11-2012
4.50
Fuel supply line plumbing
Details

 02-25-2012
1.00
Firewall electrical installation
Details

 02-21-2012
1.00
Firewall electrical installation
Details
     

 02-20-2012
2.00
Firewall electrical installation
Details
       

 01-22-2012
6.00
Control stick assembly
Details
       

 01-17-2012
1.00
Control stick assembly
Details
       

 01-16-2012
1.50
Control stick assembly
Details
       

 01-15-2012
2.50
Control stick assembly
Details
       

 01-11-2012
1.50
Preparing for instrument panel install
Details
       

 01-10-2012
1.00
Preparing for instrument panel install
Details
     

 01-08-2012
0.75
Water Bottle Holders
Details
       

 01-08-2012
2.50
Battery Box Fabrication
Details
       

 01-02-2012
4.50
Van's naca vent install
Details
       

 01-02-2012
0.10
Van's naca vent install
Details
       

 01-01-2012
2.00
Install rear spar carry through
Details
       

 12-31-2011
2.00
Install rear spar carry through
Details

 12-28-2011
2.50
Install rear spar carry through
Details
       

 12-27-2011
2.00
Spar tunnel re-assembly
Details
       

 12-19-2011
2.00
Spar tunnel re-assembly.
Details
     

 12-18-2011
2.50
Spar tunnel re-assembly
Details
       

 12-12-2011
2.00
Clean up day
Details

 12-05-2011
1.50
Fresh air intake vents
Details

 11-27-2011
2.00
Prep for wing rigging
Details
       

 11-26-2011
3.00
Rear spar carry through
Details
       

 11-02-2011
1.00
Installed rudder cable fairing
Details

 11-01-2011
0.75
Installed rudder cable fairing
Details
       

 10-19-2011
1.25
Installed tail fairing panels
Details
       

 10-18-2011
2.00
Finished brake install
Details
       

 10-17-2011
2.00
Brake lever install
Details
     

 10-15-2011
4.00
Flap and brake lever install
Details
       

 10-14-2011
2.00
Trim cable installation
Details
       

 10-11-2011
1.50
Trim cable installation
Details

 10-09-2011
2.00
Rudder cable installation
Details
       

 10-04-2011
1.50
Rudder cable installation
Details
       

 10-03-2011
1.00
Drilled and installed the tail wheel push rod
Details
     

 09-20-2011
2.00
Tail wheel installation
Details
       

 09-19-2011
3.00
Tail surface installation
Details
       

 09-18-2011
4.00
Tail surface installation
Details
       

 09-15-2011
1.50
Reviewed plans for final tail assembly
Details

 09-12-2011
1.50
Reviewed plans for final tail assembly
Details

 09-11-2011
2.00
Polishing fuselage
Details
       

 09-10-2011
3.50
Polishing fuselage
Details
     

 09-06-2011
2.50
Polishing fuselage
     

 09-05-2011
2.00
Polishing fuselage
     

 09-04-2011
5.00
Polishing tail section
       

 08-26-2011
1.00
Engine research
Details

 08-23-2011
1.50
Polishing tail section
Details
     

 08-16-2011
1.50
Removed protective skin from elevator
Details

 08-15-2011
1.50
Polishing tail section
Details

 08-13-2011
3.00
Polishing tail section
Details
       

 08-09-2011
2.00
Tail surface installation
Details

 08-08-2011
2.00
Tail surface installation
Details

 08-01-2011
1.50
Misc fuselage part fabrication
Details
     

 07-31-2011
2.00
Order parts for tail completion
Details

 07-30-2011
8.00
Tail surface installation
Details
       

 07-28-2011
2.50
Tail surface installation
Details
       

 07-23-2011
3.00
Tail surface installation
Details
       

 07-19-2011
1.50
Tail surface installation
Details

 07-17-2011
3.00
Tail surface installation
Details
       

 07-13-2011
1.50
Wheel drum brake assembly
Details
       

 07-11-2011
1.50
Wheel drum brake assembly
Details
       

 07-06-2011
1.00
Wheel drum brake assembly
Details

 07-05-2011
2.50
Wheel drum brake assembly
Details
       

 07-04-2011
3.00
Mounting motor mount and landing gear legs
Details
       

 06-29-2011
1.50
Mounting motor mount
Details
       

 06-27-2011
1.00
Painted motor mount
Details
     

 06-26-2011
5.00
Welding the motor mount
Details
       

 06-21-2011
1.00
Prepped motor mount for welding
Details
     

 06-08-2011
1.50
Motor mount and landing gear
Details
       

 06-07-2011
1.00
Shop cleaning
Details

 06-06-2011
1.50
Motor mount and landing gear
Details
       

 06-05-2011
2.00
Motor mount and landing gear
Details
       

 06-04-2011
2.50
Motor mount and landing gear
Details
       

 05-31-2011
1.50
Motor mount and landing gear
Details
       

 05-30-2011
1.50
Motor mount and landing gear
Details

 05-29-2011
3.00
Motor mount and landing gear
Details
       

 05-26-2011
1.50
Motor mount and landing gear
Details
       

 05-24-2011
2.00
Motor mount and landing gear
Details
       

 05-23-2011
2.00
Motor mount and landing gear
Details
     

 05-16-2011
1.50
Motor mount installation
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.