KitLog pro

Powered By Kitlog Pro v2.0

Bills Safari Adventure
Work Logs Found: 23
Category Work Time: 81 Hours
 Date
Hours
Work Log Summary

Details

 03-11-2012
2.00
Oil Tank Breather
Details
       

 01-23-2012
8.00
Cabin Heat
Details
       

 01-16-2012
1.00
Timed Engine
Details

 01-08-2012
4.00
Heater Valve
Details
       

 10-22-2011
8.00
Lots of small stuff that you cannot see
Details
       

 09-03-2011
8.00
Install Oil Cooler and Lines
Details
       

 08-30-2011
2.00
Install Plugs on Fuel Indicator and Oil Line Fitti
Details
       

 07-23-2011
5.00
Install Cooling Fan/Clutch Drum
Details
       

 06-28-2011
7.00
Rewiring
Details
       

 06-23-2011
1.00
Engine Lift
Details
       

 06-20-2011
3.00
Engine Lift Fixture
Details
       

 06-18-2011
4.00
Sheet Metal and Engine Lift Fixture
Details
       

 06-13-2011
2.00
Install Sheet Metal
Details
       

 06-09-2011
5.00
Assemble Engine
Details
       

 06-04-2011
5.00
Engine Dry Sump Conversion
Details

 05-30-2011
1.50
Rod Ends
Details

 05-29-2011
1.50
Assemble Fuel Selector Valve
Details
       

 05-28-2011
1.50
Finish Intake Manifold and Valve Covers
Details
     

 05-25-2011
1.00
Make Nipples for Valve Cover Drains
Details
     

 05-21-2011
3.00
Adjust Intake and Add Oil Drains to Valve Covers
Details
       

 05-18-2011
3.00
Intake Manifold
Details
       

 05-16-2011
1.50
Sump Block off Plate
Details
       

 05-15-2011
3.00
Dry Sump Conversion
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.