Powered By Kitlog Pro v2.0
Barrys RV-9A Project
RV-9A
Engine
Work Logs Found:
21
Category Work Time:
63 Hours
Date
Hours
Work Log Summary
Details
05-11-2013
6.00
Calibrated fuel tanks on EFIS. First engine start.
04-12-2013
2.00
Finished installing plenum and baffling.
04-11-2013
1.50
Finished installing baffles around plenum.
03-28-2013
2.00
Reinstalled airbox after cleaning. Final hookup of
07-23-2012
1.00
Finished mounting the exhaust supports.
07-19-2012
2.25
Installed exhaust and exhaust mounting supports.
04-07-2012
1.00
Doug Drees repaired the holes in the exhaust where
01-10-2012
2.75
Installed diodes on solenoids, finished air box an
10-29-2011
4.75
Finished spinner, worked on cowling
Details
10-28-2011
1.75
Spinner assembly
10-27-2011
2.25
Primed spinner backplate, fitting backplate
10-25-2011
3.00
Spinner installation, back cover plate fabrication
10-22-2011
5.75
Installing and fitting spinner.
Details
10-21-2011
1.50
Machined and primed spinner backplates
10-17-2011
2.25
Finished and installed the airbox
Details
10-15-2011
8.00
Finished the air box
Details
10-13-2011
2.00
Work on airbox
07-12-2011
8.00
Installed engine
Details
05-02-2011
1.25
Fiberglass and engine mount
Details
04-28-2011
2.25
Drilled holes in firewall for engine controls
04-26-2011
2.00
Installed engine mount
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
680
1647
Avionics
25
50
Canopy
69
150
Cowling
81
184
Empennage
81
178
Engine
21
63
Forward Firewall
29
80
Fuselage
95
214
Landing Gear
45
91
Miscellaneous
42
124
Paint
69
199
Wings
74
158
Wiring
49
156
Copyright © 2001-2024 Matronics. All Rights Reserved.