KitLog pro

Powered By Kitlog Pro v2.0

Barrys RV-9A Project
Work Logs Found: 21
Category Work Time: 63 Hours
 Date
Hours
Work Log Summary

Details

 05-11-2013
6.00
Calibrated fuel tanks on EFIS. First engine start.

 04-12-2013
2.00
Finished installing plenum and baffling.

 04-11-2013
1.50
Finished installing baffles around plenum.

 03-28-2013
2.00
Reinstalled airbox after cleaning. Final hookup of

 07-23-2012
1.00
Finished mounting the exhaust supports.

 07-19-2012
2.25
Installed exhaust and exhaust mounting supports.

 04-07-2012
1.00
Doug Drees repaired the holes in the exhaust where

 01-10-2012
2.75
Installed diodes on solenoids, finished air box an

 10-29-2011
4.75
Finished spinner, worked on cowling
Details
       

 10-28-2011
1.75
Spinner assembly

 10-27-2011
2.25
Primed spinner backplate, fitting backplate

 10-25-2011
3.00
Spinner installation, back cover plate fabrication
       

 10-22-2011
5.75
Installing and fitting spinner.
Details
       

 10-21-2011
1.50
Machined and primed spinner backplates

 10-17-2011
2.25
Finished and installed the airbox
Details
       

 10-15-2011
8.00
Finished the air box
Details
       

 10-13-2011
2.00
Work on airbox

 07-12-2011
8.00
Installed engine
Details
     

 05-02-2011
1.25
Fiberglass and engine mount
Details
     

 04-28-2011
2.25
Drilled holes in firewall for engine controls
     

 04-26-2011
2.00
Installed engine mount










Copyright © 2001-2024 Matronics. All Rights Reserved.