KitLog pro

Powered By Kitlog Pro v2.0

Sonnys CH650
Work Logs Found: 120
Category Work Time: 267 Hours
 Date
Hours
Work Log Summary

Details

 01-28-2012
2.50
Horizontal Tail Complete
Details
       

 01-26-2012
1.60
Finished Elevator
Details
       

 01-20-2012
0.40
Stainless Hinge Pins
Details
       

 01-19-2012
2.90
Rivet Elevator Skin and Horns
Details
       

 01-17-2012
0.40
Belton Cable Grommet
Details
       

 01-15-2012
5.60
Finalized Trim Tab and Servo Setup
Details
       

 01-14-2012
2.50
Servo Set Up
Details
       

 01-13-2012
2.20
Primed Elevator Components
Details
     

 01-08-2012
7.40
Servo and Access
Details
       

 01-07-2012
0.50
Fit Horn to Clevis
Details
       

 01-04-2012
0.90
Access Cover, Horn Support, Rib Plot
Details
       

 12-26-2011
0.60
Match Drilled Horn to Tab
Details
       

 12-23-2011
0.80
Servo Rod Cutout
Details
       

 12-21-2011
0.60
Servo Layout
Details
     

 12-19-2011
3.70
Fit Trim Tab to Elevator
Details
       

 12-18-2011
7.90
Trim Tab Hinge and Elevator Cut-out
Details
       

 12-17-2011
1.70
Drilled Trim Tab Hinge Line
Details
       

 12-12-2011
1.90
Trim Tab Horn and Materials
Details
       

 12-11-2011
2.60
Bent Strip and Trim Tab
Details
       

 12-04-2011
3.40
Formed Trim Tab
Details
       

 12-03-2011
1.30
Stablizider Center Section and Trim Tab
Details
       

 11-28-2011
1.30
Rudder Clearance Cutout
Details
       

 11-25-2011
6.70
Attached Elevator Horns
Details
       

 11-22-2011
0.70
Final Drill FTT
Details
     

 11-20-2011
3.10
Fit FTT's to Stab/Elevator
Details
       

 11-19-2011
2.30
End Ribs and FTT Prep
Details
       

 11-13-2011
2.40
Top Elevator Horn
Details
       

 11-12-2011
2.50
Ribs
Details
       

 11-11-2011
0.50
Cut Out Doubler 6T3-6
Details
     

 11-09-2011
2.20
Made Elevator Horns
Details
     

 11-07-2011
1.00
Lay Out Elevator Horns
Details
     

 11-06-2011
0.00
Smiley and Rivet Spacing
Details
       

 11-06-2011
7.30
Drilled Elevator Top Skin
Details
       

 11-05-2011
3.60
Trailing Edge and Rear/Bottom Holes
Details
       

 11-01-2011
1.00
Primed Rib Lines
Details
     

 10-31-2011
1.50
Bent Elevator Web
Details
       

 10-30-2011
2.00
Located and Drilled Skin Rivet Holes
Details
       

 10-29-2011
1.50
Center Channel to Ribs
Details
       

 10-27-2011
1.00
Elevator Developed Length
Details
     

 10-23-2011
3.00
Elevator Blank, Brake, Part Stowage
Details
       

 10-22-2011
1.00
Formed Elevator Ribs
Details
       

 10-20-2011
2.00
Elevator Rib Forms and Blanks
Details
       

 10-19-2011
1.50
Riveted Top Skin
Details
       

 10-18-2011
1.00
Completed Priming
Details
       

 10-16-2011
4.00
Drill Hinge to Rear Flange
Details
       

 10-15-2011
4.00
Drill End Ribs
Details
       

 10-13-2011
1.00
Trim Trailing Edge
Details
     

 10-10-2011
2.00
Drilled Top Skin
Details
       

 10-09-2011
2.00
Stabilizer Fixture
Details
       

 09-26-2011
1.00
Riveted Lower Skin
Details
       

 09-25-2011
1.00
Primed Frame Rivets
Details
     

 09-24-2011
1.50
Primed Skin
Details
       

 09-22-2011
0.50
Pilot Drilled Top of Skin
Details
     

 09-20-2011
1.00
Layout Top Skin
Details
       

 09-18-2011
3.00
Match Drilled Bottom of Frame
Details
       

 09-17-2011
3.50
Layout and Pilot Drill Lower Stab Skin
Details
       

 09-10-2011
3.50
Bent Stabilizer Skin
Details
       

 09-08-2011
0.50
Front Attachment Slots in Skin
Details
       

 08-29-2011
1.50
Cut Out Stabilizer Skin
Details
       

 08-20-2011
1.50
Stabilizer Skelton Complete
Details
       

 08-13-2011
2.00
Riveted Spar Doublers
Details
       

 08-08-2011
1.75
Initial Prime of Stab Components
Details
     

 07-17-2011
2.00
End Rib Angle Brackets
Details
       

 07-16-2011
4.00
Drilled Stabilizer Frame
Details
       

 07-12-2011
2.00
Spar Attachment Mated to Spar
Details
     

 07-10-2011
4.00
Rear Spar Prep
Details
       

 07-09-2011
1.50
Front Spar Attachments
Details
       

 07-06-2011
1.50
Front Spar Joggle
Details
       

 07-05-2011
1.50
Doubler Block and Hole Locations
Details
       

 07-04-2011
1.50
Stabilizer Parts
Details
       

 07-02-2011
2.50
Completed Spar Attachments
Details
       

 07-01-2011
2.00
Rear Spar Attach - Start
Details
       

 06-26-2011
7.00
Center Ribs . . . Again
Details
       

 06-23-2011
2.00
Formed Center Ribs
Details
       

 06-22-2011
2.50
Cut Center Rib Blanks
Details
       

 06-20-2011
1.00
Center Rib Form
Details
     

 06-19-2011
3.50
Fabricate Stab Rear Spar
Details
       

 06-18-2011
8.00
Front Spar and Doublers
Details
       

 06-16-2011
2.00
Stabilizer Doublers
Details
       

 06-15-2011
1.00
Formed 6T1-1 End Ribs
Details
       

 06-14-2011
1.75
Cut End Rib Blanks
Details
     

 06-13-2011
1.00
End Rib Form Block
Details
     

 06-12-2011
5.00
First Stabilizer Parts
Details
       

 06-04-2011
6.00
Completed Rudder
Details
       

 06-01-2011
1.00
Visit From EAA Tech Counselor
Details
       

 05-30-2011
1.00
Fit Skins to Riveted Frame
Details
       

 05-29-2011
4.50
Primer and First Rivets
Details
       

 05-28-2011
5.00
Complete Nose Skin & Prep Rudder Parts
Details
       

 05-27-2011
2.00
Finished Nose Skin Rivet Noles
Details
       

 05-25-2011
1.50
Drilled Nose Skin to Spar
Details
       

 05-24-2011
1.50
Final Fitting of Nose Skin
Details
       

 05-22-2011
5.50
Tip Rib and Nose Skin Prep
Details
       

 05-20-2011
0.50
Cut Out Tip Rib
Details
       

 05-19-2011
1.50
Match Drilled Ribs 2, 3 & 4
Details
       

 05-18-2011
1.00
Drilled Rear Rudder Skin
Details
       

 05-15-2011
1.00
Layout Rivet Locations in Trailing Skin
Details
       

 05-09-2011
0.20
Ordered Rudder Tip Rib
Details

 05-08-2011
0.50
Bent Trailing Edge Skin
Details
       

 05-07-2011
3.00
Blanked Rudder Skins
Details
       

 05-01-2011
2.00
Finished Rudder Horn
Details
       

 04-29-2011
1.50
Roughed out Rudder Horn
Details
       

 04-24-2011
1.50
Trial-Fit Rudder Skeleton
Details
       

 04-23-2011
1.50
Upper Rudder Bearing
Details
     

 04-22-2011
1.00
Layed Out Tail Horn
Details
     

 04-11-2011
1.00
Drilled Rudder Rib 1
Details
       

 04-10-2011
1.50
Drilled Doublers to Spar
Details
     

 04-09-2011
4.00
Formed 3 Rudder Ribs
Details
       

 04-06-2011
2.00
Rudder Rear Rib #2
Details
     

 04-02-2011
2.50
New Nose Rib Block, Doublers, Strap
Details
       

 03-31-2011
1.00
Finished Doublers
Details

 03-30-2011
1.50
Bent Doublers
Details
       

 03-25-2011
2.00
Rudder Nose Rib - 2nd Try
Details
       

 03-22-2011
1.00
Rudder Nose Rib
Details
       

 03-21-2011
1.00
Finished Nose Rib Form Block
Details
       

 03-20-2011
0.50
Cut Rudder Rib Form Block
Details
     

 03-17-2011
1.00
Nose Rib Drawing Coordinate Revision
Details
       

 03-05-2011
4.00
Rear Rib #1 and Aileron Gussets
Details
       

 03-01-2011
2.00
Made Vertical Tail Spar
Details
     

 02-28-2011
2.00
Bend and Formed 4 Parts
Details
       

 02-27-2011
4.00
Calibrating Bends, Making Parts
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.