KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 4
Category Work Time: 31 Hours
 Date
Hours
Work Log Summary

Details

 09-09-2012
15.00
Hang the IO-540 A1D5 Engine to the X-10
Details
       

 04-14-2012
4.00
Niagara Thermal 20006A Oil Cooler
Details
       

 09-25-2011
8.00
Oil Cooler bracket, a set fuel and oil hoses insta
Details

 04-04-2011
4.00
Installed the IE SPDT Oil Pressure 15 switch (to a
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.