KitLog pro

Powered By Kitlog Pro v2.0

Steves Web Site
Work Logs Found: 69
Category Work Time: 268 Hours
 Date
Hours
Work Log Summary

Details

 09-05-2015
8.00
baffles
       

 02-13-2015
8.00
comlete VS repair, lengthen stick
Details
       

 02-12-2015
9.00
emp fairing cont., redo VS attach
Details
       

 02-11-2015
5.50
emp. fairing cont.
Details
       

 02-10-2015
8.00
emp fairing
Details
       

 09-08-2014
5.50
fab doubler for VS attach
     

 09-04-2014
7.00
complete service bulletin, mount and check stab
     

 09-03-2014
4.50
service bulleitn cont.
     

 08-30-2014
5.50
HS service bulletin cont.
     

 07-12-2014
3.50
service bulletin 14-01-31 cont.
Details
     

 07-07-2014
2.00
service bulletin 14-01-31 cont.
Details
     

 07-02-2014
3.00
service bulletin 14-01-13
Details
     

 02-12-2014
7.00
fab and glue in foam tip inserts on elevators, hor
Details
       

 02-10-2014
8.00
fiberglass tips + misc.
Details
       

 05-21-2013
3.00
install HS caps
     

 03-27-2013
3.00
install rudder, rig cables
       

 03-25-2013
2.00
remount vert stab for rudder installation

 03-24-2013
3.00
finish elevator control rigging
       

 03-23-2013
6.50
rivet elevator fairings, fit sticks to control tub
       

 03-22-2013
3.50
fit right elevator & HS fairing

 03-20-2013
4.00
L elevator / stab tips
       

 03-10-2013
3.00
elevator control alignment
     

 03-09-2013
6.00
fit elevators to Horiz stab, connect push rod, tes
       

 03-08-2013
5.00
finish mounting vert stab, test fit L elevator
       

 03-07-2013
4.00
vert. stab cont.
       

 03-06-2013
4.00
vertical stab mount cont.
       

 03-04-2013
5.00
begin mounting vertical stab
       

 02-22-2013
7.00
mount horizontal stab
       

 03-04-2012
4.00
complete L elevator
     

 02-20-2012
3.00
complete elevator trim tab
       

 01-15-2012
3.50
elevator trim tab prep
       

 01-05-2012
3.00
rivet L elevator
       

 01-04-2012
2.00
bend tabs in L elevator skin
     

 01-01-2012
8.00
prep L elevator
       

 12-28-2011
3.00
rivet R elevator
     

 12-28-2011
3.00
leading edge R elevator
     

 12-26-2011
3.00
debur all elevator parts

 12-25-2011
2.00
rivet R elevator skeleton
     

 12-24-2011
4.00
R elevator prep
     

 12-17-2011
3.00
prep elevators and throttle bracket
       

 12-04-2011
3.00
rivet elevator stiffeners
     

 12-03-2011
4.00
prep elevator
     

 11-28-2011
2.00
prep elevator stiffeners
       

 11-20-2011
3.50
disassemble vertical stab, debur, dimple, prime
     

 11-06-2011
2.50
prep veritcal stab
Details
       

 11-04-2011
3.00
complete horizontal stab
       

 11-03-2011
3.00
rivet R. horizontal stab skin
     

 06-12-2011
6.50
prep and rivet HS skelton
Details
       

 06-11-2011
2.25
prep emp for riveting
Details
     

 05-22-2011
3.00
continue R HS
     

 05-20-2011
1.50
begin R horizontal stab

 04-30-2011
1.25
drill L HS skins

 04-17-2011
4.50
HS skeleton and skin
Details
       

 04-15-2011
1.00
prep HS ribs
Details
     

 04-13-2011
1.75
prep HS front spar
Details
     

 04-10-2011
4.00
rudder leading edge and top cap
Details
       

 03-25-2011
2.50
rivet rudder skin to skeleton
     

 03-20-2011
3.50
rudder work cont.
Details
     

 03-16-2011
1.75
continue rudder work
Details
     

 03-15-2011
3.25
finish rudder riveting, bend, assemble
Details
     

 03-14-2011
3.00
debur and rivet new rudder skin
Details
       

 03-13-2011
3.50
dimpled new rudder skin and stiffeners.
Details
       

 03-12-2011
4.50
shape HS parts. prep rudder.
Details
     

 03-06-2011
3.25
rear spar horizontal stab
Details
       

 02-28-2011
3.00
rudder work
Details
       

 02-26-2011
2.00
back rivet stiffeners to rudder skins
     

 02-25-2011
4.00
prep rudder for riveting
Details
       

 02-20-2011
1.00
cut, trim and debur 6 rudder stiffeners
     

 02-08-2011
1.50
inventory emp kit
       










Copyright © 2001-2024 Matronics. All Rights Reserved.