KitLog pro

Powered By Kitlog Pro v2.0

RV-10
Work Logs Found: 95
Category Work Time: 425 Hours
 Date
Hours
Work Log Summary

Details

 05-09-2015
8.00
Empanage Attach
Details
     

 11-17-2014
5.00
Build up VS Fairing
Details
       

 11-15-2014
5.00
Trim and Attach elevator Fairings
Details
       

 11-14-2014
1.00
Final Torque Evelator Counter Weights
Details
       

 08-02-2011
5.00
Prime HS and VS Stilisers
       

 04-10-2011
8.00
Trail fit Trim System
Details
       

 03-23-2011
6.00
Trial Fit Empennage
Details
     

 03-22-2011
4.00
Align and fit HS VS
Details
     

 03-19-2011
3.00
Match Drill Top Deck
Details
       

 03-07-2011
6.00
Assemble Hardware to Aft Deck
Details

 12-11-2010
5.00
Mount Elevator Trim Tabs
Details
     

 12-09-2010
8.00
Fold Trim Tabs
Details
     

 12-05-2010
3.50
Trim and attach Counter Weights
Details

 12-04-2010
8.00
Rivet Togther RH Elevator Steps 1-12
Details

 12-03-2010
3.00
Rivet LH Front Spar to skins
Details
     

 12-02-2010
2.50
Rivet Togther Counter Balance Skins
Details

 11-21-2010
6.00
Rivet Spar components
Details

 11-14-2010
12.00
Dimple RH Skins and Rivet
Details
     

 11-13-2010
4.00
Flush Rivet
Details
       

 11-07-2010
1.50
Machine Counter Sink
Details
       

 11-07-2010
5.00
Flush Rivett Skins
Details

 11-07-2010
3.00
Dimple Skins
Details
     

 10-24-2010
4.50

Details

 10-23-2010
4.00

Details

 10-17-2010
6.32
Match Drill Trim Brackets
Details

 10-17-2010
2.75
Dissassemble (Mark)
Details
       

 10-17-2010
2.75
Cut out ribs (john)
Details

 10-16-2010
7.00
Match drill right elevator (Mark and John)
Details
       

 10-16-2010
3.00
Final Drill left Elevator (Mark)
Details
     

 10-16-2010
1.00
Continue to assemble Right Elevator (john)
Details

 10-16-2010
3.00
Cleco together Right Elevator (John)
Details

 10-06-2010
4.50
Cleco together Left Elevator and Btm Skin
Details

 10-06-2010
1.75
Cleco in Left Trim plate and Match Drill
Details

 10-03-2010
4.50
Tip Counter Balances
Details

 10-03-2010
2.00
Cleco and Final Drill Hinge Re-inforcements
Details

 06-30-2010
5.00
Separate Ribs and Shear Clips
Details

 06-20-2010
3.50
Separate Elevator ribs
Details

 06-20-2010
4.50
Finish Riveting Skins to Rear Spar
Details
     

 06-19-2010
3.50
Rivet Right Skin Top
Details
     

 06-19-2010
4.00
Rivet Rear Spar to Skins and Ribs
Details

 06-18-2010
3.00
Rivet Left Skin Top
Details

 06-17-2010
2.50
Rivet R Skin Bottom
Details

 06-16-2010
2.50
Rivet R Bottom Skin to Stringers
Details

 06-15-2010
2.83
Rivet Left Skin Bottom
Details

 06-14-2010
3.00
Rivet Left Bottom Skin
Details

 06-13-2010
8.00
Rivet Skins to Spar
Details
     

 06-13-2010
8.66
Rivet Nose Ribs to Skins
Details
     

 06-12-2010
10.00
Rivet Inspar Ribs to Front Spar
Details

 06-12-2010
3.50
Rivet Inspar Ribs to Flanges Of Stringer Web
Details

 06-12-2010
2.00
Prime Inspar Ribs
Details
     

 06-12-2010
5.50
Machine Countersink rear spar
Details

 06-11-2010
2.00
Prime Skins and Nose Ribs
Details

 06-11-2010
3.50
Machine Counter Sink Stringers
Details

 06-09-2010
6.00
Finish Dimple skins and Inspar Ribs
Details

 06-01-2010
8.50
Continue De-burring and Dimple
Details

 05-31-2010
12.25
Match Drill #40 Holes in Skin and Ribs.
Details

 05-30-2010
2.00
Match #40 Holes in rear Spar and Skin

 05-26-2010
1.50
Cleco Ribs and Rear Spar
Details

 05-25-2010
3.16
De-bur Skins and Remove Vinyl
Details

 05-25-2010
3.50
Continue Prep of Parts
Details

 05-25-2010
3.75
Cleco Ribs to Spar
Details

 05-24-2010
7.00
De-Burr and Flute
Details

 05-23-2010
16.00
Rivet Front Spar
Details
       

 05-23-2010
3.00
Drill Out
Details

 05-22-2010
9.00
De-Burr
Details

 05-22-2010
6.00
De Burr Parts and Trim
Details

 05-22-2010
1.00

Details

 05-21-2010
5.50
Spar Bracket and Spar Doubler
Details

 05-19-2010
2.00
Left Spar Bracket
Details

 05-16-2010
4.00
Match Drill Spar Caps
Details
     

 05-12-2010
2.32
Trim Spar Caps
Details

 05-11-2010
0.32

Details

 04-30-2010
1.83
Rivet Rear Spar Doubler and Hinges
Details

 04-30-2010
0.50
Assemble Inboard Hinge bracket
Details

 04-27-2010
5.00
Assemble Rear Spar
Details

 04-26-2010
6.00
Final Assembly of rudder
Details
       

 04-25-2010
8.00
Partial Assbly of Rudder
Details
     

 04-21-2010
2.00
Pro Seal Trailing Edge
Details

 04-16-2010
3.00
Partial Assemble of Rudder
Details
     

 04-16-2010
3.00
Cleco Rear Spar and Doubler of HS
Details
     

 04-15-2010
3.00
Rivet Top and Bottom Ribs

 04-13-2010
2.50
Machine Countersink the Trailing Edge
Details

 04-12-2010
1.50
Prepare and etch prime
Details

 04-10-2010
6.00
Complete De-bur and Dimple
Details
       

 04-09-2010
2.50
Disasemble Stiffners and Rudder Parts
Details

 04-05-2010
8.00
Cleco Rudder Skin to Skelton and Match Drill
       

 04-04-2010
9.00
Re-assmeble and Rivett Ribs and Skin
       

 04-02-2010
6.00
Assemble and Rivett Rear Spar
Details
       

 04-01-2010
1.50
Test Assemble Rudder Skeleton
Details
     

 03-29-2010
2.00
Paint Parts VS
Details
     

 03-29-2010
3.00
Cut Out Stiffners for Rudder
Details
     

 03-26-2010
4.00
Dimpling VS Skin
Details
       

 03-19-2010
1.50
Test Dimpling
Details

 03-18-2010
4.80
Machine Countersink rear
Details
       

 03-16-2010
6.25
Commence Construction of the Vertical Stabiliser
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.