Powered By Kitlog Pro v2.0
RV-10
RV10
Empennage
Work Logs Found:
95
Category Work Time:
425 Hours
Date
Hours
Work Log Summary
Details
05-09-2015
8.00
Empanage Attach
Details
11-17-2014
5.00
Build up VS Fairing
Details
11-15-2014
5.00
Trim and Attach elevator Fairings
Details
11-14-2014
1.00
Final Torque Evelator Counter Weights
Details
08-02-2011
5.00
Prime HS and VS Stilisers
04-10-2011
8.00
Trail fit Trim System
Details
03-23-2011
6.00
Trial Fit Empennage
Details
03-22-2011
4.00
Align and fit HS VS
Details
03-19-2011
3.00
Match Drill Top Deck
Details
03-07-2011
6.00
Assemble Hardware to Aft Deck
Details
12-11-2010
5.00
Mount Elevator Trim Tabs
Details
12-09-2010
8.00
Fold Trim Tabs
Details
12-05-2010
3.50
Trim and attach Counter Weights
Details
12-04-2010
8.00
Rivet Togther RH Elevator Steps 1-12
Details
12-03-2010
3.00
Rivet LH Front Spar to skins
Details
12-02-2010
2.50
Rivet Togther Counter Balance Skins
Details
11-21-2010
6.00
Rivet Spar components
Details
11-14-2010
12.00
Dimple RH Skins and Rivet
Details
11-13-2010
4.00
Flush Rivet
Details
11-07-2010
1.50
Machine Counter Sink
Details
11-07-2010
5.00
Flush Rivett Skins
Details
11-07-2010
3.00
Dimple Skins
Details
10-24-2010
4.50
Details
10-23-2010
4.00
Details
10-17-2010
6.32
Match Drill Trim Brackets
Details
10-17-2010
2.75
Dissassemble (Mark)
Details
10-17-2010
2.75
Cut out ribs (john)
Details
10-16-2010
7.00
Match drill right elevator (Mark and John)
Details
10-16-2010
3.00
Final Drill left Elevator (Mark)
Details
10-16-2010
1.00
Continue to assemble Right Elevator (john)
Details
10-16-2010
3.00
Cleco together Right Elevator (John)
Details
10-06-2010
4.50
Cleco together Left Elevator and Btm Skin
Details
10-06-2010
1.75
Cleco in Left Trim plate and Match Drill
Details
10-03-2010
4.50
Tip Counter Balances
Details
10-03-2010
2.00
Cleco and Final Drill Hinge Re-inforcements
Details
06-30-2010
5.00
Separate Ribs and Shear Clips
Details
06-20-2010
3.50
Separate Elevator ribs
Details
06-20-2010
4.50
Finish Riveting Skins to Rear Spar
Details
06-19-2010
3.50
Rivet Right Skin Top
Details
06-19-2010
4.00
Rivet Rear Spar to Skins and Ribs
Details
06-18-2010
3.00
Rivet Left Skin Top
Details
06-17-2010
2.50
Rivet R Skin Bottom
Details
06-16-2010
2.50
Rivet R Bottom Skin to Stringers
Details
06-15-2010
2.83
Rivet Left Skin Bottom
Details
06-14-2010
3.00
Rivet Left Bottom Skin
Details
06-13-2010
8.00
Rivet Skins to Spar
Details
06-13-2010
8.66
Rivet Nose Ribs to Skins
Details
06-12-2010
10.00
Rivet Inspar Ribs to Front Spar
Details
06-12-2010
3.50
Rivet Inspar Ribs to Flanges Of Stringer Web
Details
06-12-2010
2.00
Prime Inspar Ribs
Details
06-12-2010
5.50
Machine Countersink rear spar
Details
06-11-2010
2.00
Prime Skins and Nose Ribs
Details
06-11-2010
3.50
Machine Counter Sink Stringers
Details
06-09-2010
6.00
Finish Dimple skins and Inspar Ribs
Details
06-01-2010
8.50
Continue De-burring and Dimple
Details
05-31-2010
12.25
Match Drill #40 Holes in Skin and Ribs.
Details
05-30-2010
2.00
Match #40 Holes in rear Spar and Skin
05-26-2010
1.50
Cleco Ribs and Rear Spar
Details
05-25-2010
3.16
De-bur Skins and Remove Vinyl
Details
05-25-2010
3.50
Continue Prep of Parts
Details
05-25-2010
3.75
Cleco Ribs to Spar
Details
05-24-2010
7.00
De-Burr and Flute
Details
05-23-2010
16.00
Rivet Front Spar
Details
05-23-2010
3.00
Drill Out
Details
05-22-2010
9.00
De-Burr
Details
05-22-2010
6.00
De Burr Parts and Trim
Details
05-22-2010
1.00
Details
05-21-2010
5.50
Spar Bracket and Spar Doubler
Details
05-19-2010
2.00
Left Spar Bracket
Details
05-16-2010
4.00
Match Drill Spar Caps
Details
05-12-2010
2.32
Trim Spar Caps
Details
05-11-2010
0.32
Details
04-30-2010
1.83
Rivet Rear Spar Doubler and Hinges
Details
04-30-2010
0.50
Assemble Inboard Hinge bracket
Details
04-27-2010
5.00
Assemble Rear Spar
Details
04-26-2010
6.00
Final Assembly of rudder
Details
04-25-2010
8.00
Partial Assbly of Rudder
Details
04-21-2010
2.00
Pro Seal Trailing Edge
Details
04-16-2010
3.00
Partial Assemble of Rudder
Details
04-16-2010
3.00
Cleco Rear Spar and Doubler of HS
Details
04-15-2010
3.00
Rivet Top and Bottom Ribs
04-13-2010
2.50
Machine Countersink the Trailing Edge
Details
04-12-2010
1.50
Prepare and etch prime
Details
04-10-2010
6.00
Complete De-bur and Dimple
Details
04-09-2010
2.50
Disasemble Stiffners and Rudder Parts
Details
04-05-2010
8.00
Cleco Rudder Skin to Skelton and Match Drill
04-04-2010
9.00
Re-assmeble and Rivett Ribs and Skin
04-02-2010
6.00
Assemble and Rivett Rear Spar
Details
04-01-2010
1.50
Test Assemble Rudder Skeleton
Details
03-29-2010
2.00
Paint Parts VS
Details
03-29-2010
3.00
Cut Out Stiffners for Rudder
Details
03-26-2010
4.00
Dimpling VS Skin
Details
03-19-2010
1.50
Test Dimpling
Details
03-18-2010
4.80
Machine Countersink rear
Details
03-16-2010
6.25
Commence Construction of the Vertical Stabiliser
Details
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
351
1473
Avionics
24
90
Control System
18
42
Electrical System
26
94
Empennage
95
425
Engine
1
5
Engine Controls
1
4
Fuselage
143
572
Miscellaneous
3
10
Painting
3
100
Panel
17
54
Shop Supplies
1
2
Undercarriage
3
15
Weight and Balance
1
6
Wings
15
54
Copyright © 2001-2024 Matronics. All Rights Reserved.