Powered By Kitlog Pro v2.0
Mikes Helicycle
Helicycle
Fuel system
Work Logs Found:
23
Category Work Time:
59 Hours
Date
Hours
Work Log Summary
Details
05-23-2012
1.00
Drained fuel
Details
05-20-2012
3.50
Sight tube labels, clutch bearing shims, labels
Details
05-19-2012
5.00
Empty weight, fuel sight tube markings
Details
02-19-2012
1.00
Cabin to painter, replace fuel line
Details
01-04-2012
3.00
Fuel system flush, fuel flow meter test
Details
01-03-2012
2.00
Fuel flow transducer
Details
10-31-2011
2.00
Fuel sight gauge
Details
10-30-2011
1.50
Labels, fuel sight gauge
Details
10-18-2011
2.00
Filter mount brace
Details
10-17-2011
3.00
Fuel filter mount & plumbing
Details
10-11-2011
0.50
Fuel fittings
Details
03-11-2011
2.00
Drained fuel
Details
03-08-2011
2.00
Fuel system leak test
Details
03-07-2011
3.00
Fuel vent lines
Details
03-05-2011
2.50
Lower fuel tanks
Details
02-18-2011
3.50
Leak test, Trans oil
Details
02-16-2011
2.00
Tank sumps
Details
02-12-2011
3.00
Upper tank
Details
01-31-2011
5.00
Lower tanks
Details
01-26-2011
3.00
Fuel tank prep
Details
01-20-2011
1.50
Hole sanding tool
Details
11-27-2010
5.00
Windshield
Details
11-01-2010
2.00
Fuel tank bolts
Details
SITE NAVIGATION
Contact Builder
Helicycle Home
Category
# Logs
# Hours
All
493
1363
Avionics
44
124
Cabin
72
220
Controls
30
93
Drivetrain
42
114
Electrical
44
124
Engine
48
116
Frame
11
31
Fuel system
23
59
Instrumentation
26
76
Main Rotor
26
73
Main Rotor
42
114
Miscellaneous
28
73
Paperwork
7
14
Shop Supplies
2
2
Tail
23
64
Tail Rotor
23
64
Tools
2
2
Copyright © 2001-2024 Matronics. All Rights Reserved.