Powered By Kitlog Pro v2.0
Ralph Finch RV-9A Build
RV-9A
Fluid Plumbing
Work Logs Found:
44
Category Work Time:
138 Hours
Date
Hours
Work Log Summary
Details
12-07-2014
1.00
Left brake line
Details
11-28-2014
2.00
Crankcase breather and fuel pump overflow lines
Details
11-27-2014
1.00
Switched ends of oil cooler line
Details
10-01-2014
1.00
Tightened and marked AN fittings for brakes lines
Details
01-27-2013
2.00
Re-attached brakes lines to forward fuse.
05-26-2012
4.00
Finished re-route of vent lines.
Details
05-25-2012
2.00
Started re-do of vent lines
Details
11-16-2011
4.00
Finished AOA & Pitot re-do 2/2
11-16-2011
4.00
Finished AOA & Pitot re-do 1/1
Details
11-15-2011
1.00
Continue AOA & Pitot tubing re-do
11-14-2011
1.00
Started AOA & Pitot tube re-do
Details
11-13-2011
3.00
AOA & Pitot tube routing
Details
11-06-2011
4.00
Extended Static line to fwd fuse
Details
10-29-2011
2.00
Installed static lines
Details
09-01-2011
2.00
Torque fuel/brake fittings, Re-did fuel line clamp
Details
08-31-2011
3.00
Finalize fuel pump install
Details
08-28-2011
1.00
Plumbing inspection
Details
06-25-2011
15.00
Fuel lines
Details
05-10-2011
2.00
Boost fuel pump work
Details
05-08-2011
3.00
Boost pump work
Details
05-07-2011
2.50
Elect. boost pump plumbing
Details
04-29-2011
1.00
Continue tightening plumbing fittings
04-25-2011
1.00
Torqued fittings
Details
04-24-2011
15.00
Finished lines on spar
Details
03-14-2011
1.50
More brake line progress
Details
03-13-2011
5.00
Fuel/brake line progress
Details
03-09-2011
3.00
Modest progress on fuel lines
Details
03-06-2011
3.00
Fuel pump work
Details
03-05-2011
3.00
Continue fuel lines
Details
02-27-2011
4.00
Started fuel lines
Details
02-26-2011
5.00
Finished vent lines
Details
02-23-2011
3.50
Started fuel vent lines
Details
02-22-2011
2.00
Finish left brake line firewall to spar
Details
02-21-2011
4.00
Brake lines firewall to spar
Details
02-20-2011
3.00
Redid brake lines along spar
Details
01-30-2011
5.00
Started fuel pump install, substituted bulkhead co
Details
01-29-2011
5.00
Had to remake one of the brake lines...
Details
01-27-2011
1.00
Finished bending brake lines from firewall to cent
Details
01-26-2011
2.00
One step backward...
Details
01-25-2011
1.00
Finished cutting and bending brake lines
Details
01-24-2011
1.00
Finished left side brake line
Details
01-23-2011
4.00
Started bending brake line
Details
01-21-2011
3.00
Finished brake fluid reservoir, installed Bonaco b
Details
01-18-2011
2.00
Measured and drilled for brake fluid reservoir
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
785
2214
Canopy
62
162
Controls
22
40
Cowl
85
172
Electrical
54
134
Empennage
30
111
Engine
88
193
Firewall
20
45
Fluid Plumbing
44
138
Fuselage
175
560
Garage Setup
10
87
LdgGear/Wheels
11
18
Miscellaneous
25
90
Plumbing
44
138
Tools
1
2
Wings
114
324
Copyright © 2001-2024 Matronics. All Rights Reserved.