KitLog pro

Powered By Kitlog Pro v2.0

Larrys Web Site
Work Logs Found: 35
Category Work Time: 120 Hours
 Date
Hours
Work Log Summary

Details

 02-23-2017
2.00
Set rudder cable tension
Details
       

 08-18-2016
3.00
Routed elevator trim wire to fuselage
Details
       

 06-15-2016
5.00
Saddle for elevator
Details
     

 05-10-2016
2.00
Rudder stops and fuel tank calibration
Details
       

 05-10-2016
6.00
Rudder Cables
Details
       

 05-09-2016
2.00
Getting rudder fixed to neutral position
Details
     

 05-03-2016
3.00
Rudder cables
Details
       

 04-20-2016
4.00
Elevator Stops
Details
       

 03-12-2014
2.00
Rudder spar fairing
Details
       

 12-29-2010
8.00
Deburred/ Corrosion proteciton / rivet elevator

 11-14-2010
4.00
Elevator Trim tab and Motor

 11-13-2010
8.00
Drill skin to ribs
Details

 11-11-2010
2.00
Drill skin to ribs
       

 11-06-2010
3.00
Fit hinge to stabilizer and drill holes
     

 11-05-2010
4.00
Drill skin / trim flanges
     

 11-01-2010
2.00
Set upstabilizer for drilling

 10-31-2010
4.00
Fit stabilizer skin and drill
     

 10-31-2010
4.00
Deburr/ Corrosion protection/rivet
     

 10-30-2010
2.00
Rront spar to ribs

 10-29-2010
2.00
Drill rear spar attachment

 10-23-2010
8.00
Elevator center section and other ribs

 10-22-2010
4.00
Ribs to spar
     

 10-22-2010
4.00
Rear spar attachment/doublers

 10-21-2010
2.00
Complete Doubler Work on Front Spar

 10-20-2010
2.00
Small Doublers to Spar

 10-19-2010
2.00
Drill doublers to spar

 10-18-2010
2.00
Stabilizer and Elevator Parts Inventory
     

 08-28-2010
4.00
Corrosion protection and rivets
     

 08-26-2010
3.00
All holes drilled and deburred
 

 08-25-2010
2.00
Nose skin taped in place

 08-20-2010
4.00
Skin to ribs

 08-18-2010
4.00
Drill out holes/deburr and ready for rivets

 08-17-2010
3.00
Ribs to Spar
     

 08-16-2010
3.00
Doublers to Spar

 08-15-2010
1.00
Inventory Parts
     










Copyright © 2001-2024 Matronics. All Rights Reserved.