KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
Work Logs Found: 47
Category Work Time: 56 Hours
 Date
Hours
Work Log Summary

Details

 06-29-2018
0.00
Finished HS mods, reinstalled.
     

 06-28-2018
0.00
Accomplished HS bearing mod and finished HS improv
       

 06-27-2018
0.00
Continued HS upgrade.
       

 06-26-2018
0.00
Completed ADS-B install, began HS upgrade.
Details
       

 06-25-2018
0.00
Finished nose wheel mod, worked on ADS-B install.
Details
       

 06-23-2018
0.00
Completed AST mods, began nose wheel upgrade.
       

 05-28-2018
0.00
Completed deburring and priming.
     

 05-22-2018
0.00
Inventoried upgrade parts and began deburring.

 05-08-2015
0.00
Mods
Details
       

 04-15-2015
0.00
Continued mods and inspection.
Details

 04-14-2015
0.00
Started mods and inspections.
Details
       

 04-13-2015
0.00
Removed Jane's wings, set up hangar for dual work/
Details
     

 04-12-2015
0.00
Replaced tires and tubes.

 10-02-2014
0.00
Installed reg/rec in new location
Details
       

 05-07-2014
0.00
Continued with mods and maintenance.
Details
       

 05-03-2014
0.00
Tank and wheels.
Details
       

 04-30-2014
0.00
Removed sight glass, added holes, fitted doublers.
       

 04-29-2014
0.00
Opened tank, removed ProSeal.
       

 03-20-2014
0.00
Finalized Thermostasis installation.
Details
       

 02-21-2014
0.00
Installed Thermostasis oil thermostat.
Details
       

 02-14-2014
0.00
Installed canopy seal kit
Details
       

 06-24-2013
0.00
Completed SB, installed FW stiffener.
Details
       

 06-20-2013
0.00
Began SB for Cooler Mount Improvement
Details
       

 04-10-2013
3.00
Finished, test flew.
Details

 04-09-2013
1.00
Finished wing mods.
Details

 04-08-2013
2.00
Wired wings.
Details

 04-04-2013
6.00
Worked on wing wiring mod.
Details
       

 03-21-2013
6.00
Wing connector, power plug, pump switch.
Details
       

 03-20-2013
2.00
Continued on lighting upgrade.
Details

 03-18-2013
5.00
Worked on lighting upgrade kit.
Details
       

 03-14-2013
6.00
Finished MLG mod except for reassembly steps.
Details
       

 03-13-2013
7.00
Installed doublers.
Details
       

 03-12-2013
6.00
Began SB
Details
       

 03-04-2013
1.00
Prepped and primed aluminum parts.
     

 03-02-2013
2.00
Deburred kit parts.
Details
       

 12-10-2012
2.00
Inventoried SB and wing wiring kits.
Details

 10-08-2012
2.00
Removed U-1202 brackets
Details

 10-03-2012
2.00
Began SB 12-09-26.
Details
       

 02-17-2012
0.00
Finished interior kit.
Details
       

 02-11-2012
0.00
Finished access panels, painted.

 02-10-2012
0.00
Made access panel mods.
Details
       

 02-09-2012
0.00
Finished tank mod, updated avionics.
Details

 02-08-2012
0.00
Worked on mods.
Details
       

 02-07-2012
0.00
More mods & upgrades.
Details
       

 12-09-2011
0.00
Installed replacement throttle springs.
Details
       

 06-25-2011
0.00
Installed baggage area tie-down strap.
Details
       

 01-24-2011
2.50
Made cooling baffles.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.