Date
|
Hours
|
Work Log Summary
|
Details
|
06-29-2018
|
0.00
|
Finished HS mods, reinstalled.
|
|
|
|
06-28-2018
|
0.00
|
Accomplished HS bearing mod and finished HS improv
|
|
|
|
06-27-2018
|
0.00
|
Continued HS upgrade.
|
|
|
|
06-26-2018
|
0.00
|
Completed ADS-B install, began HS upgrade.
|
Details
|
|
|
06-25-2018
|
0.00
|
Finished nose wheel mod, worked on ADS-B install.
|
Details
|
|
|
06-23-2018
|
0.00
|
Completed AST mods, began nose wheel upgrade.
|
|
|
|
05-28-2018
|
0.00
|
Completed deburring and priming.
|
|
|
|
05-22-2018
|
0.00
|
Inventoried upgrade parts and began deburring.
|
|
|
|
05-08-2015
|
0.00
|
Mods
|
Details
|
|
|
04-15-2015
|
0.00
|
Continued mods and inspection.
|
Details
|
|
|
04-14-2015
|
0.00
|
Started mods and inspections.
|
Details
|
|
|
04-13-2015
|
0.00
|
Removed Jane's wings, set up hangar for dual work/
|
Details
|
|
|
04-12-2015
|
0.00
|
Replaced tires and tubes.
|
|
|
|
10-02-2014
|
0.00
|
Installed reg/rec in new location
|
Details
|
|
|
05-07-2014
|
0.00
|
Continued with mods and maintenance.
|
Details
|
|
|
05-03-2014
|
0.00
|
Tank and wheels.
|
Details
|
|
|
04-30-2014
|
0.00
|
Removed sight glass, added holes, fitted doublers.
|
|
|
|
04-29-2014
|
0.00
|
Opened tank, removed ProSeal.
|
|
|
|
03-20-2014
|
0.00
|
Finalized Thermostasis installation.
|
Details
|
|
|
02-21-2014
|
0.00
|
Installed Thermostasis oil thermostat.
|
Details
|
|
|
02-14-2014
|
0.00
|
Installed canopy seal kit
|
Details
|
|
|
06-24-2013
|
0.00
|
Completed SB, installed FW stiffener.
|
Details
|
|
|
06-20-2013
|
0.00
|
Began SB for Cooler Mount Improvement
|
Details
|
|
|
04-10-2013
|
3.00
|
Finished, test flew.
|
Details
|
|
|
04-09-2013
|
1.00
|
Finished wing mods.
|
Details
|
|
|
04-08-2013
|
2.00
|
Wired wings.
|
Details
|
|
|
04-04-2013
|
6.00
|
Worked on wing wiring mod.
|
Details
|
|
|
03-21-2013
|
6.00
|
Wing connector, power plug, pump switch.
|
Details
|
|
|
03-20-2013
|
2.00
|
Continued on lighting upgrade.
|
Details
|
|
|
03-18-2013
|
5.00
|
Worked on lighting upgrade kit.
|
Details
|
|
|
03-14-2013
|
6.00
|
Finished MLG mod except for reassembly steps.
|
Details
|
|
|
03-13-2013
|
7.00
|
Installed doublers.
|
Details
|
|
|
03-12-2013
|
6.00
|
Began SB
|
Details
|
|
|
03-04-2013
|
1.00
|
Prepped and primed aluminum parts.
|
|
|
|
03-02-2013
|
2.00
|
Deburred kit parts.
|
Details
|
|
|
12-10-2012
|
2.00
|
Inventoried SB and wing wiring kits.
|
Details
|
|
|
10-08-2012
|
2.00
|
Removed U-1202 brackets
|
Details
|
|
|
10-03-2012
|
2.00
|
Began SB 12-09-26.
|
Details
|
|
|
02-17-2012
|
0.00
|
Finished interior kit.
|
Details
|
|
|
02-11-2012
|
0.00
|
Finished access panels, painted.
|
|
|
|
02-10-2012
|
0.00
|
Made access panel mods.
|
Details
|
|
|
02-09-2012
|
0.00
|
Finished tank mod, updated avionics.
|
Details
|
|
|
02-08-2012
|
0.00
|
Worked on mods.
|
Details
|
|
|
02-07-2012
|
0.00
|
More mods & upgrades.
|
Details
|
|
|
12-09-2011
|
0.00
|
Installed replacement throttle springs.
|
Details
|
|
|
06-25-2011
|
0.00
|
Installed baggage area tie-down strap.
|
Details
|
|
|
01-24-2011
|
2.50
|
Made cooling baffles.
|
Details
|
|