Jacks Web Site
Work Logs Found: 78
Category Work Time: 419 Hours
 Date
Hours
Work Log Summary

Details

 11-20-2011
2.00
Tested avionics
Details
       

 10-30-2011
2.00
Fabricated passenger side vent panel
Details
       

 10-23-2011
3.00
Mounted compass to center strut
Details
       

 10-16-2011
3.00
Secured brake lines
Details
       

 10-13-2011
4.00
Installed remaining engine control cables
Details
       

 10-11-2011
2.00
Installed throttle control
Details
       

 10-09-2011
3.00
Installed engine control cables
Details
       

 10-08-2011
3.00
Installed cooling vents
Details
       

 10-06-2011
1.00
Installed oil vent control cable
Details
     

 10-06-2011
3.00
Finished air vent control installation
Details
       

 10-02-2011
1.00
Installed forward center cover
Details
     

 10-02-2011
1.00
Installed air vents
Details
       

 09-24-2011
6.00
Installed GTX-327 Transponder
Details
       

 09-23-2011
1.00
First lesson for Kay
Details
     

 09-22-2011
3.00
Tested the GNS-430
Details
     

 09-21-2011
3.00
Tested SL-30
Details
     

 09-20-2011
3.00
Powered up GMA 340 Audio panel
Details

 09-17-2011
5.00
GPSMAP-696 Testing
Details

 09-15-2011
3.00
Powered up Skyview systems
Details

 09-12-2011
3.00
Wired status lights
Details
     

 09-10-2011
6.00
Finsih assembled intstrument panel
Details
       

 09-08-2011
3.00
Sprayed clear coad
Details
       

 09-07-2011
6.00
Decalled main panel
Details
       

 09-06-2011
3.00
Started decaling panels
Details
       

 08-20-2011
4.00
Removed front panal for finishing
Details
       

 08-05-2011
7.00
Wired front panel controls
Details
       

 07-23-2011
4.00
Finish wired GPSMAP 696
Details
       

 07-16-2011
6.00
Finished wiring Skyview 700
Details
       

 07-07-2011
4.00
Prepare for front panel wiring
Details
       

 06-18-2011
3.00
Wire Skynet bus connector
Details
       

 06-04-2011
6.00
Wire main Skyview connector
Details
       

 01-08-2011
7.00
Ran ground wires
Details
     

 01-01-2011
6.00
Wired ARINC-429 Module connector
Details
       

 12-19-2010
8.00
Wired Network to Modules
Details
     

 12-18-2010
5.00
Wire runs to the panel
Details
       

 12-11-2010
8.00
Lacing cables
Details
       

 11-28-2010
6.00
Reworked Autopilot Trim Servo
Details
       

 11-27-2010
8.00
Wired and Mounted ADAHRS Platform
Details
       

 11-26-2010
15.00
Reworked the fuselage wiring
Details

 11-25-2010
6.00
Fitted Main Control Cables
Details
       

 11-24-2010
2.00
Preparing Skyview Network Junctions
Details
     

 11-23-2010
2.00
Preparing Skyview Network Junctions
Details
       

 11-22-2010
6.00
Preparing Skyview Network Junctions
Details
       

 11-21-2010
8.00
Mounted auxilary control cables
Details
     

 11-10-2010
0.75
Assembled Regulator Mounting Plate
Details
     

 11-09-2010
2.00
Second Bulkhead Mountings Assembly
Details
       

 11-09-2010
1.00
GPS 696 Mounting
Details
       

 11-09-2010
2.00
Front Panel Mounting Assembly
Details
       

 11-08-2010
1.00
Component Mountings Final Assembly
Details
       

 11-07-2010
8.00
Spray parts
Details
       

 11-06-2010
9.00
Parts preparation
Details
     

 10-31-2010
8.00
Front panel switch mounting
Details
       

 10-30-2010
8.00
Mounted Panel Switches
Details
       

 10-25-2010
10.00
Mounted ADAHRS Modules
Details
       

 10-23-2010
6.00
Mounted the secodary alternator regulator
Details
       

 10-09-2010
5.00
Mounted Firewall Componenets
Details
       

 10-08-2010
8.00
Completed mounting of bulkhead components
Details
       

 10-02-2010
6.00
Mounted dimmer controls and heat sink
Details
       

 09-27-2010
2.00
Cut holes for Skyview USB ports
Details
       

 09-25-2010
7.00
Refined 696 mounting.
Details
       

 09-23-2010
5.00
Mounted GPSMAP-696
Details
       

 09-19-2010
4.00
Assembled bulkhead and panel to top skin
Details
       

 09-18-2010
6.00
Mounted backup battery and relays
Details
       

 09-11-2010
8.00
Mounted Skyview Modules
Details
       

 09-05-2010
8.00
Built Fuse Panel Under Pilot Panel
Details
       

 08-29-2010
8.00
Prepared wiring harness for Garmin stack
Details
     

 08-22-2010
20.00
Created Skyview Schematic
Details
     

 08-15-2010
20.00
Prepared Avionics Schematics
Details
     

 08-07-2010
6.00
Fitted Garmin stack to second bulkhead
Details
       

 07-25-2010
10.00
Mounted SV-D700
Details
     

 07-24-2010
5.00
Cut hole for GPSMAP-696
Details
     

 07-22-2010
4.00
Prepared instrument side panels
Details
       

 07-20-2010
3.00
Measuring up Garmin components
Details
       

 07-19-2010
3.00
Cut hole for Garmin stack
Details
       

 07-18-2010
3.00
Cut hole for the SV-D1000
Details
     

 07-17-2010
3.00
Marked panel for major cuts
Details
     

 07-17-2010
5.00
Layout Instrument Panel
Details
     

 07-10-2010
20.00
Design Instrument Panel
Details
     