Date
Hours
Work Log Summary
Details
11-20-2011
2.00
Tested avionics
Details
10-30-2011
2.00
Fabricated passenger side vent panel
Details
10-23-2011
3.00
Mounted compass to center strut
Details
10-16-2011
3.00
Secured brake lines
Details
10-13-2011
4.00
Installed remaining engine control cables
Details
10-11-2011
2.00
Installed throttle control
Details
10-09-2011
3.00
Installed engine control cables
Details
10-08-2011
3.00
Installed cooling vents
Details
10-06-2011
1.00
Installed oil vent control cable
Details
10-06-2011
3.00
Finished air vent control installation
Details
10-02-2011
1.00
Installed forward center cover
Details
10-02-2011
1.00
Installed air vents
Details
09-24-2011
6.00
Installed GTX-327 Transponder
Details
09-23-2011
1.00
First lesson for Kay
Details
09-22-2011
3.00
Tested the GNS-430
Details
09-21-2011
3.00
Tested SL-30
Details
09-20-2011
3.00
Powered up GMA 340 Audio panel
Details
09-17-2011
5.00
GPSMAP-696 Testing
Details
09-15-2011
3.00
Powered up Skyview systems
Details
09-12-2011
3.00
Wired status lights
Details
09-10-2011
6.00
Finsih assembled intstrument panel
Details
09-08-2011
3.00
Sprayed clear coad
Details
09-07-2011
6.00
Decalled main panel
Details
09-06-2011
3.00
Started decaling panels
Details
08-20-2011
4.00
Removed front panal for finishing
Details
08-05-2011
7.00
Wired front panel controls
Details
07-23-2011
4.00
Finish wired GPSMAP 696
Details
07-16-2011
6.00
Finished wiring Skyview 700
Details
07-07-2011
4.00
Prepare for front panel wiring
Details
06-18-2011
3.00
Wire Skynet bus connector
Details
06-04-2011
6.00
Wire main Skyview connector
Details
01-08-2011
7.00
Ran ground wires
Details
01-01-2011
6.00
Wired ARINC-429 Module connector
Details
12-19-2010
8.00
Wired Network to Modules
Details
12-18-2010
5.00
Wire runs to the panel
Details
12-11-2010
8.00
Lacing cables
Details
11-28-2010
6.00
Reworked Autopilot Trim Servo
Details
11-27-2010
8.00
Wired and Mounted ADAHRS Platform
Details
11-26-2010
15.00
Reworked the fuselage wiring
Details
11-25-2010
6.00
Fitted Main Control Cables
Details
11-24-2010
2.00
Preparing Skyview Network Junctions
Details
11-23-2010
2.00
Preparing Skyview Network Junctions
Details
11-22-2010
6.00
Preparing Skyview Network Junctions
Details
11-21-2010
8.00
Mounted auxilary control cables
Details
11-10-2010
0.75
Assembled Regulator Mounting Plate
Details
11-09-2010
2.00
Second Bulkhead Mountings Assembly
Details
11-09-2010
1.00
GPS 696 Mounting
Details
11-09-2010
2.00
Front Panel Mounting Assembly
Details
11-08-2010
1.00
Component Mountings Final Assembly
Details
11-07-2010
8.00
Spray parts
Details
11-06-2010
9.00
Parts preparation
Details
10-31-2010
8.00
Front panel switch mounting
Details
10-30-2010
8.00
Mounted Panel Switches
Details
10-25-2010
10.00
Mounted ADAHRS Modules
Details
10-23-2010
6.00
Mounted the secodary alternator regulator
Details
10-09-2010
5.00
Mounted Firewall Componenets
Details
10-08-2010
8.00
Completed mounting of bulkhead components
Details
10-02-2010
6.00
Mounted dimmer controls and heat sink
Details
09-27-2010
2.00
Cut holes for Skyview USB ports
Details
09-25-2010
7.00
Refined 696 mounting.
Details
09-23-2010
5.00
Mounted GPSMAP-696
Details
09-19-2010
4.00
Assembled bulkhead and panel to top skin
Details
09-18-2010
6.00
Mounted backup battery and relays
Details
09-11-2010
8.00
Mounted Skyview Modules
Details
09-05-2010
8.00
Built Fuse Panel Under Pilot Panel
Details
08-29-2010
8.00
Prepared wiring harness for Garmin stack
Details
08-22-2010
20.00
Created Skyview Schematic
Details
08-15-2010
20.00
Prepared Avionics Schematics
Details
08-07-2010
6.00
Fitted Garmin stack to second bulkhead
Details
07-25-2010
10.00
Mounted SV-D700
Details
07-24-2010
5.00
Cut hole for GPSMAP-696
Details
07-22-2010
4.00
Prepared instrument side panels
Details
07-20-2010
3.00
Measuring up Garmin components
Details
07-19-2010
3.00
Cut hole for Garmin stack
Details
07-18-2010
3.00
Cut hole for the SV-D1000
Details
07-17-2010
3.00
Marked panel for major cuts
Details
07-17-2010
5.00
Layout Instrument Panel
Details
07-10-2010
20.00
Design Instrument Panel
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
728
2689
Canopy
26
127
Electrical
97
436
Empennage
30
110
Firewall forward
103
332
Fuselage
161
696
Gear fairings
5
17
Instrument Panel
78
419
Shop Setup
15
Wings
213
552