KitLog pro

Powered By Kitlog Pro v2.0

Freds Web Site
Work Logs Found: 16
Category Work Time: 37 Hours
 Date
Hours
Work Log Summary

Details

 02-10-1996
2.50
Prepared and bonded 3 oz glass to the sanded radiu
Details

 02-09-1996
1.25
Bonded micro to Vertical Stablizer and Rudder
Details

 02-08-1996
0.50
Sanded the Vertical Stabilizer and Rudder
Details

 02-07-1996
2.00
Drilled a hole and sanded the Vertical Stabilizer
Details

 12-05-1995
2.00
Checked the verticle stabilizer for twist
Details

 12-03-1995
1.00
Rebonded the front and top
Details

 12-02-1995
2.00
Fitted and bonded a new back spar to the VS
Details

 11-28-1995
1.00
Bonded a 4 inch tape down the back side of the fro
Details

 11-26-1995
1.00
Rebonded the front spar of the vertical stabilizer
Details

 11-25-1995
3.00
Found and Corrected the Verticle Stabilizer Twist
Details

 11-09-1995
2.00
Bonded Verticle Stabilizer to Fuselage
Details

 11-08-1995
3.50
Fitted and bonded the vertical stabilizer to the f
Details

 11-07-1995
3.00
Completed sanding a 3/4 inch deep channel
Details

 11-05-1995
6.00
Prepared and bonded the two halfs of the vertical
Details

 10-30-1995
2.50
Sanded and fitted vertical stabilizer
Details

 10-29-1995
3.50
Started construction of the verticle stabilizer
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.