Powered By Kitlog Pro v2.0
Freds Web Site
Pulsar XP
Vertical Stabilizer
Work Logs Found:
16
Category Work Time:
37 Hours
Date
Hours
Work Log Summary
Details
02-10-1996
2.50
Prepared and bonded 3 oz glass to the sanded radiu
Details
02-09-1996
1.25
Bonded micro to Vertical Stablizer and Rudder
Details
02-08-1996
0.50
Sanded the Vertical Stabilizer and Rudder
Details
02-07-1996
2.00
Drilled a hole and sanded the Vertical Stabilizer
Details
12-05-1995
2.00
Checked the verticle stabilizer for twist
Details
12-03-1995
1.00
Rebonded the front and top
Details
12-02-1995
2.00
Fitted and bonded a new back spar to the VS
Details
11-28-1995
1.00
Bonded a 4 inch tape down the back side of the fro
Details
11-26-1995
1.00
Rebonded the front spar of the vertical stabilizer
Details
11-25-1995
3.00
Found and Corrected the Verticle Stabilizer Twist
Details
11-09-1995
2.00
Bonded Verticle Stabilizer to Fuselage
Details
11-08-1995
3.50
Fitted and bonded the vertical stabilizer to the f
Details
11-07-1995
3.00
Completed sanding a 3/4 inch deep channel
Details
11-05-1995
6.00
Prepared and bonded the two halfs of the vertical
Details
10-30-1995
2.50
Sanded and fitted vertical stabilizer
Details
10-29-1995
3.50
Started construction of the verticle stabilizer
Details
SITE NAVIGATION
Pulsar XP Home
Category
# Logs
# Hours
All
100
284
Avionics
1
3
Canopy
25
62
Fuselage
26
92
Inventory and Inspec
4
23
Landing Gear
11
21
Miscellaneous
1
4
Rudder
8
19
Vertical Stabilizer
16
37
Wings
8
23
Copyright © 2001-2024 Matronics. All Rights Reserved.