Powered By Kitlog Pro v2.0
NORMAN'S WEB SITE
RV-10
Wings
Work Logs Found:
48
Category Work Time:
148 Hours
Date
Hours
Work Log Summary
Details
05-06-2011
1.00
fit wing tips
05-02-2011
5.00
nutplates in wing tips
05-01-2011
2.00
installed al strips in wing tips
04-30-2011
2.00
install wing tips
04-29-2011
2.00
install wing tips
04-26-2011
4.00
Installed flaps & ailerons. Adjsuted control link
04-18-2011
4.00
Assembled and installed ail control assemblly
04-04-2011
2.00
right flap
03-31-2011
1.00
primed flap skins
03-28-2011
2.00
riveted ribs to left flap
03-26-2011
1.00
left flap riveting
03-25-2011
2.00
riveted left flap
03-22-2011
3.00
Flap bebur & c/s
03-21-2011
2.00
finished rt aileron; left flap prep
03-19-2011
2.00
left flap prep
03-17-2011
1.50
FLt flap prep; pro seal rt aileron trail. edge
03-16-2011
1.50
flasp skelton assembly
03-14-2011
3.00
flap prep
03-13-2011
2.50
Finished rivets on ailerons -- pro sealed traling
03-09-2011
2.50
Riveted aileron skins
03-08-2011
3.00
Aileron prep
03-07-2011
2.00
left aileron
03-03-2011
2.00
ailerons
02-28-2011
3.00
prepped stiffeners and ail skins
02-27-2011
2.50
prepped ailerons
02-25-2011
1.50
riveted rt tank baffle
02-24-2011
2.00
Rivweted wing gap seals
02-23-2011
2.00
Finished pro seal on right tank
02-20-2011
3.00
Pro sealed rt tank, prepped flap gap seals
02-19-2011
1.50
Pro sealed right tank ribs
02-18-2011
2.50
Riveted right tank ribs
02-16-2011
4.00
Finished left tank baffle, prosealed ribs in right
02-15-2011
3.00
riveted baffle to lseft tank
02-14-2011
0.50
installed pitot tube mount
02-11-2011
1.00
Dimple right tank
02-09-2011
6.50
Pro sealed left tank
02-08-2011
4.00
riveted left tank ribs; prepped right tank
02-07-2011
5.00
Prepped right fuel tank
02-06-2011
3.00
Pro sealed left tank ribs
02-04-2011
4.50
Wing stand and left fuel tank
02-02-2011
5.50
Finished riveting right wg leading edge
02-01-2011
4.50
Riveted right leading edge skin
01-31-2011
4.00
finished left leading edge
01-30-2011
2.00
Rivet lt leading edge to ribs
01-29-2011
2.00
Alodine leading edge ribs
01-23-2011
5.00
Left Fuel tank
Details
01-20-2011
3.00
Prep tank ribs
01-19-2011
20.00
Left leading edge
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
121
360
Fuselage
73
212
Wings
48
148
Copyright © 2001-2024 Matronics. All Rights Reserved.