KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
Work Logs Found: 164
Category Work Time: 199 Hours
 Date
Hours
Work Log Summary

Details

 12-12-2013
1.00
Plotos-Reinforcing Strips under Plenum
       

 12-12-2013
1.00
Plenum Popped off Engine/Added Glass Under Plenum
Details
       

 12-11-2013
1.00
Retaped Engine for Glassing Plenum
Details
       

 12-11-2013
1.00
Photos-Left Side of Plenum after Adding Glass
       

 12-11-2013
2.00
Glassed Front of Plenum over Engine
Details
       

 12-10-2013
2.00
Work on Plenum/Trimmed Right Front Bracket
Details
       

 12-10-2013
1.50
Taped Engine for Fiberglassing Plenum
Details
       

 05-09-2013
0.50
Camlocs Installed on Top Cowling
Details
     

 05-07-2013
1.00
Brought Cowling Back after Sanding, Priming
Details
       

 03-27-2013
1.00
Reorganized Shop/Removed Camlocs
Details
       

 03-25-2013
1.00
Sanded Lower Cowl over Rivets
Details
       

 03-25-2013
1.50
Oil Door Clecoed/Trimmed Cowl for Exhaust
Details
       

 03-19-2013
2.00
Checked Oil Door Doubler after Glassing
Details
       

 02-20-2013
0.50
Built up Lower Cowling and Inlet Ring Areas
Details
       

 02-20-2013
1.00
Built up Cowling Behind Spinner Plate
Details
       

 02-06-2013
2.50
Sanded Cowl Inlet Ring Areas/Installed Rings
Details
       

 02-05-2013
0.10
Photos-Cowl Inlet Ring Areas Beefed Up
       

 02-05-2013
2.50
Filled and Sanded Cowl Inlet Areas
Details
       

 01-29-2013
2.50
Sanded Edges of Inner Cowling Joints
Details
       

 12-12-2012
0.50
Reriveted Hinge to Oil Access Door Properly!
Details
       

 12-12-2012
1.00
Applied Fiberglass Cloth to Cowling
Details
       

 12-12-2012
0.50
Applied and Sanded Filler to Oil Access Door
Details
     

 12-12-2012
1.00
Added Resin and Fiberglass Cloth to Cowling
Details
       

 12-11-2012
2.00
Redrilled Hinge to Oil Access Door
Details
       

 12-11-2012
2.00
Cut Side of Van's Oil Door for Doubler
Details
       

 12-04-2012
1.50
Riveted Hartwell Latches to Oil Access Door
Details
       

 12-04-2012
1.00
Filled Gaps in Front of Cowling
Details
       

 12-04-2012
1.50
Drilled Hinge to Cowling and Oil Access Door
Details
     

 12-04-2012
1.50
Checked Gaps in Front Cowling Areas
Details
       

 12-03-2012
0.50
Enlarged Holes in Oil Access Door for Latches
Details
     

 11-29-2012
0.50
Made a Striker Plate out of Paint Scraper
Details
       

 11-29-2012
1.00
Filed Hartwell Latch Openings
Details
       

 11-29-2012
1.00
Began to Cut Out Openings for Hartwell Latches
Details
       

 11-27-2012
2.00
Sanded Oil Access Door Opening
Details
       

 11-27-2012
1.00
Oil Access Door Opening Cut/Cowling in Place
Details
       

 11-27-2012
1.00
Cut Out the Oil Access Door
Details
       

 11-27-2012
1.00
Began Cutting out the Oil Access Door Opening
Details
       

 11-07-2012
2.00
Sanded Straight Lines along Top Cowl
Details
       

 11-07-2012
1.00
Photos-Cowl and Inlet Rings
Details
       

 11-07-2012
1.50
Helped Walt with Sanding Top Cowl Edges
Details
       

 11-06-2012
1.50
Sanded Edges of Top Cowl
Details
       

 10-20-2012
4.00
Assisted with Oil Pressure Line Wire/Glass Cowl
Details
       

 10-20-2012
1.50
Applied Fiberglass Cloth to Sides of Top Cowl
Details
       

 10-12-2012
0.50
Took Camloc Screws Out of Upper Cowl
Details
     

 10-12-2012
1.50
Cleaned up Inlet Ring Areas
Details
       

 10-07-2012
1.00
Sanded Inlet Ring Areas on Cowling
Details
       

 10-07-2012
0.10
Photos-Sanded Cowl Inlet Ring Areas
       

 10-07-2012
0.10
Found that Cowl Inlets had to be Marked
Details
     

 10-06-2012
1.00
Splitting the Cowling
Details
       

 10-06-2012
1.00
Split the Cowling
Details
       

 10-06-2012
1.00
Began to Split Cowling
Details
       

 10-06-2012
2.50
Assisted with Splitting the Cowling
Details
       

 09-23-2012
1.00
Seams Sanded/Seams Taped for Cutting
Details
       

 09-22-2012
2.00
The Cowling Seams Sanded
Details
       

 09-21-2012
1.00
Applied Epoxy Resin/Flox to Cowling
Details
       

 08-13-2012
0.70
Sanded Sides of Cowling
Details
       

 08-13-2012
0.30
Drilled Hole for Trim Cable in Bracket
Details
     

 08-13-2012
1.00
Applied Epoxy-Flox Slurry to Center Gaps
Details
       

 08-12-2012
1.00
Applied Epoxy Flox Slurry to Cowling Seams
Details
       

 07-09-2012
1.00
Sanded Cowl Inlet Ring Areas
Details
       

 07-06-2012
0.50
Taped Fuselage around the Windshield Fairing
Details
       

 07-06-2012
0.50
Removed Duct Tape From Cowl Inlets
Details
       

 07-06-2012
1.00
Painted Inside of Windshield
Details
       

 07-01-2012
1.00
Marked Inside of Cowl Inlet Areas for Epoxy
Details
       

 07-01-2012
0.50
Made Dividers for Cowl Inlet Rings and Epoxy
Details
     

 07-01-2012
0.50
Applied Epoxy Slurry around Cowl Inlet Rings
Details
       

 06-30-2012
0.40
Tape off Cowl Inlet in Preparation of Epoxy App
Details
     

 06-26-2012
0.50
Sanded Flox on Cowling
Details
       

 06-25-2012
0.50
Photo-Fiberglass Patch on Cowling
     

 06-25-2012
0.50
Glassed Cowling Together
Details
       

 06-25-2012
0.50
Cowling Halves Glassed Together
Details
       

 06-20-2012
0.50
Waxed Inlet Rings
Details
     

 06-20-2012
0.50
Applied Epoxy to Cowling Extensions
Details
       

 02-22-2012
0.50
Cowling Placed Back on the Engine
Details
     

 02-21-2012
0.30
Removed Tape from Cowling and Air Inlet Ring
Details
       

 02-20-2012
0.50
Glassed Air Inlet Ring into Cowling
Details
       

 02-11-2012
3.00
Applied Heat to Plenum
Details

 04-04-2011
0.50
Sanded Cowling Extensions/Pulled Tape off Cowl
Details
       

 04-04-2011
0.10
Photos-Cowl Holes Filled with SuperFil
       

 03-31-2011
1.50
Rec SuperFil/Taped Cowling for Filling Holes
Details
       

 03-21-2011
1.00
Sanded Cowling Reinforcements
Details

 03-16-2011
0.10
Reinforcements Glued over Extensions
Details
       

 03-16-2011
0.10
Reinforcements Glued in Place over Extensions
Details
       

 03-16-2011
2.50
Popped the Extensions/More Reinforcements
Details
       

 03-15-2011
0.10
Glued Fiberglass Sheets Together for Extensions
Details
       

 03-15-2011
1.50
Fiberglassed Extensions into Lower Cowling
Details
       

 03-15-2011
0.10
Fiberglass Extensions Glued in Place
Details
       

 02-03-2011
2.50
Riveted Side Support Strips to Lower Cowling
Details
       

 02-03-2011
0.10
Cowling Support Strips Riveted/Cowling is On
       

 01-25-2011
1.00
Installed Last 4 Camlocs/Camlocs Complete!
Details
       

 01-24-2011
1.50
Installed 5 More Grommets/Studs in Top Cowl
Details
       

 01-23-2011
1.50
Primed Left Side Brace/Riveted Receptacles
Details
       

 01-23-2011
0.10
Photos-Left Side of the Top Cowling
       

 01-22-2011
1.50
Sanded Top Cowl Edge/Drilled Left Side Brace
Details
     

 01-16-2011
1.00
Installed Last Three Grommets Along Aft Edge
Details
       

 01-15-2011
0.10
Photo-Top Cowling with Grommets/Studs
     

 01-15-2011
2.50
Anti-lock Pins Removed/More Grommets Installed
Details
       

 01-14-2011
2.00
Riveted Receptacles to Braces to Firewall
Details
       

 01-14-2011
0.10
Photos-Aft Top Braces Riveted to Firewall
       

 01-14-2011
0.10
Photos 2-Top Right Cowling With Camlocs
       

 01-13-2011
2.00
Drilled Camloc Receptacle Holes in Aft Braces
Details
     

 01-12-2011
2.50
Dimpled Firewall Flange/C/S Camloc Braces
Details
       

 01-11-2011
0.10
Thick Part of Cowling/Reference Line Drawn
Details
       

 01-11-2011
0.10
Installed Top Cowl Right Side Camlocs
Details
       

 01-11-2011
3.50
Installed Camlocs in Right Side Brace
Details
       

 01-10-2011
0.10
Photos-Brace Riveted/Cowling Fitted
       

 01-10-2011
0.10
Photos 2-Overall Look/Cowl Holes/Brace Drilled
       

 01-10-2011
4.00
Installed Fastener Grommets and Studs
Details
       

 01-09-2011
0.10
Photos 4-Lower Cowling Fastened w/Camlocs
       

 01-09-2011
0.10
Photos 3-Installed Studs/Side Brackets to be Prime
       

 01-09-2011
0.10
Photos 2-Installing Camloc Stud Fasteners
       

 01-09-2011
0.10
Photo-Installed Fastener Grommets/Pliers Ground
Details
       

 01-09-2011
1.50
Installed Camlocs on Bottom of Lower Cowling
Details
       

 01-08-2011
6.50
Trimmed Front of Cowl to Close up Gaps
Details
       

 01-08-2011
0.10
Photos-Right Bottom Camloc Bracket
Details
       

 01-08-2011
5.00
Assisted with Trimming the Cowling
Details
       

 01-08-2011
1.00
Assisted with Cowling Trimming/Photo-Camlocs
Details
       

 01-07-2011
0.50
Trimmed Inside of Cowl Inlets
Details
     

 01-06-2011
2.00
Continued to Do Nothing but Look at Cowling
Details
       

 01-04-2011
0.30
Rec New Control Cable Bracket/Need Replacement
Details
       

 01-04-2011
1.80
Measured Cowling Inlets and Openings
Details
       

 12-28-2010
2.00
Drilled Camloc Holes in Side Braces
Details
       

 12-21-2010
2.00
Removed Spacer/Drilled Camloc Holes-Bottom Brac
Details
       

 12-15-2010
0.10
Photos-Spacers Installed betw/Firewall and Brace
       

 12-15-2010
0.10
Photos 2-Two Spacers in Place on Brace
       

 12-15-2010
3.00
Made Spacers for Aft Right Cowling
Details
       

 12-11-2010
3.00
Installed Spinner/Camloc Holes in Support Braces
Details
       

 12-11-2010
1.00
Assisted with Taking Cowling On/Off
Details

 12-10-2010
0.10
Photos-Cowling Taped/Side Support Brace
       

 12-10-2010
3.50
Drilled Top Cowl to Side Support Braces
Details
       

 12-09-2010
0.10
Photos-Cowling Sides Pushed Out by Support Braces
       

 12-09-2010
1.00
Drilled Cowling Sides to Support Braces
Details
       

 12-08-2010
1.50
Trimming Cowlings to Each Other and Fuselage
Details
       

 12-08-2010
4.50
Tirmmed Sides of Cowls/Drilled Bottom to Brace
Details
       

 12-08-2010
0.10
Photo-Right Side of Cowlings
     

 12-07-2010
2.50
Worked on Side Supports because of Misfit of Top
Details
       

 12-07-2010
0.10
Photos-Right Side of the Cowlings
       

 12-07-2010
0.10
Photos 2-Bottom Cowl Marked for Trimming/Side Supp
       

 12-03-2010
0.10
Photos-Trimmed Sides of Top Cowl
       

 12-03-2010
0.10
Photos 2-Right Side of Top Cowling Trimmed
     

 12-03-2010
2.50
Drilled Top Cowling to Side Braces
Details
       

 12-02-2010
0.10
Photos 2-Side Braces Drilled to Bottom Cowling
       

 12-02-2010
5.50
Made Side Supports for Cowling
Details
       

 12-02-2010
2.00
Assisted with Drilling Side Cowling Braces
Details
       

 12-01-2010
0.10
Photos-Trimming the Bottom Cowling
       

 12-01-2010
0.10
Photos 3-Sides Trimmed off Bottom Cowling
       

 12-01-2010
0.10
Photos 2-Initial Trimming of the Bottom Cowling
       

 12-01-2010
2.50
Began Trimming Bottom Cowling
Details
       

 11-28-2010
5.50
Set Height of Top Cowl to Spinner/Trimmed Cowl
Details
       

 11-28-2010
2.00
Made Cardboard Template for Gear Leg Cutouts
Details
       

 11-27-2010
0.10
Photos-Marking Top Cowling for Trimming
       

 11-27-2010
0.10
Photos 5-Right Side of Cowling
     

 11-27-2010
0.10
Photos 4-Top Cowling
       

 11-27-2010
0.10
Photos 3-Trimming the Top Cowl
       

 11-27-2010
0.10
Photos 2-Trimming the Top Cowling
       

 11-27-2010
3.00
Installed Prop/Trimmed Some of Top Cowling
Details
       

 11-26-2010
2.00
Marked Top Cowling for Trimming
Details

 11-24-2010
0.10
Photos-Top Cowling on the Engine
       

 11-23-2010
6.00
Scalloped Cowling Braces/Drilled to Firewall
Details
       

 11-23-2010
0.10
Photos-Top Cowling Braces Clecoed in Place
       

 11-23-2010
2.00
Laid out Cowling Braces for Scalloping
Details
       

 11-10-2009
1.00
Unpacked SJ Cowl/Subpanel
Details
       

 11-10-2009
0.10
Photos-SJ Cowl
       

 11-09-2009
0.20
Picked up Sam James Cowl at ABF
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.