KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
Work Logs Found: 188
Category Work Time: 815 Hours
 Date
Hours
Work Log Summary

Details

 06-09-2018
4.00
Weapon of 'glas Destruction
Details
       

 01-06-2018
5.80
Fuse fuel lines; AP wiring
Details
       

 09-24-2017
2.50
Fuel tank vent connections
Details

 08-05-2017
3.50
Fuel selector placard; new fuel lines
Details
     

 04-28-2017
0.00
MOVING TO THE AIRPORT--Part III
Details
       

 04-28-2017
0.00
MOVING TO THE AIRPORT--Part II
Details
       

 04-28-2017
3.00
MOVE TO THE AIRPORT--Part I
Details
       

 04-16-2017
2.00
Towing attachment/bar
Details
       

 11-18-2016
9.30
LAST SKIN IS ON
Details

 11-05-2016
4.00
Securing the main roll bar support tube
Details
       

 11-05-2016
2.50
First rivets in the top fwd skin!
Details
       

 07-07-2016
1.50
Tech Counselor visit
Details

 12-27-2014
6.80
A/P pitch servo
Details
       

 03-18-2013
6.00
Finished turtledeck riveting and misc jobs
Details

 10-13-2012
24.00
Misc fuse work 30-Sep to 13-Oct 2012
Details

 09-29-2012
2.00
Lay in the rudder cables
Details

 09-10-2012
2.80
Fit horiz stab to the fuse
Details

 09-09-2012
6.00
Drill F-7106 skin to f/w; engine dolly.
Details

 08-27-2012
1.30
Elevator linkage inspection cover plates
Details

 08-19-2012
7.00
Attach plates for the VS; fwd top fuse skin
Details
     

 08-15-2012
1.90
Fitting VS to the fuse
Details
       

 08-12-2012
5.75
Brake lines; riveted sub panel/ribs into place.
Details

 08-11-2012
1.50
Installed fuel lines 2nd & last time maybe
Details

 08-06-2012
1.50
Installation of subpanel and fwd fuse ribs.
Details

 08-05-2012
1.70
Subpanel outboard sections, canopy deck riveting
Details

 08-04-2012
2.00
F-704 cap strips match drilled. Csk canopy decks
Details

 08-01-2012
4.00
Brake lines installed; started new fuel lines
Details
     

 07-30-2012
1.00
Removed misinstalled fuel lines
Details

 07-22-2012
3.00
Mate fuel lines & valve, brake line...and OOPSIE!
Details

 07-22-2012
2.00
Left tank fuel line
Details

 07-21-2012
8.00
Bolted LG wldmts for good. Began fuel/brake lines
Details

 07-15-2012
9.00
Fuel vent lines, fuel valve & brake resvr spcrs
Details

 07-10-2012
2.50
Fitting main LG weldment--finishing up RIGHT
Details

 07-09-2012
2.30
Fitting main LG weldment--LEFT
Details

 07-08-2012
2.00
Fitting main LG weldment--RIGHT
Details

 07-05-2012
8.70
Riveting; painting interior & other parts
Details

 07-01-2012
6.00
Priming, painting, riveting
Details
       

 06-30-2012
1.20
Vent line fittings.
Details
       

 06-25-2012
2.00
Right main gear taper pin
Details

 06-20-2012
1.80
Reamed left main for taper pin
Details

 06-17-2012
1.80
Drilled main lg to weldment
Details

 06-10-2012
8.00
Fuel line cover/cockpit heat diffuser
Details
       

 06-09-2012
8.00
Tunnel cover fabrication, fit, and rivet.
Details
       

 06-05-2012
3.10
Match drilled last bracket to top fwd fuse; NACA
Details

 06-04-2012
2.10
Match drilling fwd fuse angle brackets
Details

 06-03-2012
2.50
Fab and fit fwd top fuse parts into place w/clecoe
Details

 06-02-2012
8.00
Install NACA vents: cleco fwd fuse top parts in pl
Details

 06-01-2012
3.00
Vent line screen solution; NACA vents
Details

 05-28-2012
9.30
Flap parts painting/no load testing; fuel vent scr
Details

 05-26-2012
3.50
Primed flap parts
Details

 05-20-2012
4.00
Flap parts match drilled, deburr/dimple.
Details

 05-19-2012
1.70
Electric flap parts
Details

 05-15-2012
3.30
Seat pans riveted
Details

 05-14-2012
2.80
Baggage floor riveted
Details

 05-13-2012
0.50
Test fit the flap bar
Details
       

 05-13-2012
7.00
Baggage area prime; install floors/side covers
Details
       

 05-12-2012
2.00
Tie down ring storage nutplates.
Details
       

 05-12-2012
5.50
F-706 nutplates; F-905 armrest rivets
Details
       

 05-05-2012
1.00
Right seat pan hinges
Details

 04-28-2012
2.50
Baggage Covers; First Seating!!!
Details
       

 04-17-2012
2.00
Rear fuse top skins
Details

 04-15-2012
8.50
Aft fuse skins; aux rib and J-stringer repair
Details
       

 04-14-2012
5.50
Longeron gussets; aft top fuse skin match drill
Details

 04-13-2012
3.00
Emp deck rivets complete; F-656 gussets; F-786 sti
Details
     

 04-12-2012
0.00
Documenting fuse twist: zero-zero
Details
       

 04-11-2012
3.20
Empennage deck priming/riveting
Details
       

 04-10-2012
2.50
F-711D angle--one more time; F-6111 aux ribs fit
Details

 04-09-2012
1.60
Zeroed out the fuse twist; drilled aft deck
Details

 04-08-2012
5.30
F-721 canopy decks and F-757 gussets
Details

 04-07-2012
3.00
F-970 side skin to longeron riveting
Details

 04-06-2012
6.00
Fuse flipped, on cradle right side up!
Details
       

 04-01-2012
6.60
Finished fuse cradle and cntr/fwd fuse section riv
Details

 03-31-2012
4.70
External step installation. More riveting.
Details

 03-30-2012
6.50
Building fuse cradle
Details

 03-26-2012
3.30
F-970 starboard riveting; brake pedal cotter pins.
Details

 03-25-2012
1.00
Assemble rudder and brake pedals
Details

 03-24-2012
3.00
Rudder and brake pedal paint; rivet replacement
Details

 03-19-2012
2.00
Riveting F-970, port side
Details

 03-18-2012
6.50
Riveting F-970 skins
Details

 03-14-2012
2.30
Seat belt cable wear blocks
Details

 03-11-2012
5.80
A few fuse rivets; prime steps; rear baggage wall
Details

 03-10-2012
7.80
Fit steps to fuse sides
Details

 03-07-2012
2.50
Dimpled F-906, riveted baggage floor ribs to same
Details

 03-05-2012
3.30
Reassembling the fwd fuse continues...
Details

 03-04-2012
3.30
Reassembly of fwd fuselage continues...
Details

 03-03-2012
10.30
Fuse reassembly continues...
Details

 02-28-2012
3.00
Finish fwd fuse priming; begin fwd fuse reassy
Details

 02-28-2012
2.70


 02-27-2012
2.00
Priming fwd fuse parts
Details

 02-26-2012
2.80
F970 skins, w/F-904H pre-rivets, clecoed in place
Details

 02-25-2012
2.30
Rivet outboard seat ribs: two more dimples
Details

 02-24-2012
2.70


 02-21-2012
1.50
F-636 shoulder belt anchors
Details

 02-20-2012
7.50
Tools for neglected rear fuse dimples & riveting
Details

 02-19-2012
8.10
Longeron csking, spot prime: put'em back
Details

 02-18-2012
7.70
Deburr, dimple, smooth F-972 and F-970 skins
Details

 02-13-2012
2.30
Deburr, dimple, screw up, and repair F-972
Details

 02-12-2012
3.50
Disassembly for deburr, smooth, dimple, etc.
Details

 02-11-2012
6.80
Misc f/w deburr, cskng, drilling.
Details

 02-07-2012
1.50
Rudder block holes in F-719 & F6118
Details

 02-06-2012
2.90
Fwd fuse mbr deburring; rudder adj holes.
Details

 02-05-2012
8.70
Baggage comp blkhds/brake pedal, cyl fit up
Details

 02-04-2012
9.40
Lots of little jobs!
Details

 02-01-2012
3.50
Prime, rivet, drill pivot holes in brake pedals
Details

 01-31-2012
2.60
Brake pedal angle shaping
Details

 01-28-2012
2.70
Brake pedal part prep/drilling
Details

 01-24-2012
2.70
Center brake pedal bracket and bearing block
Details

 01-23-2012
3.60
Drilled rudder pedal bearing blocks to longerons
Details

 01-16-2012
2.00
Rudder pedal brackets & brace
Details

 01-14-2012
6.00
Tank reinforcement angle and spacer
Details

 01-08-2012
9.70
Fwd fuse member fabrication
Details

 01-07-2012
8.00
Stnlss drilling: 6 broken bits, cheap bit best!??
Details

 01-06-2012
2.50
Longerons match drilled to WD-602s
Details

 01-02-2012
10.20
Cleco/match drill F-970 skins; firewall set in pla
Details

 01-01-2012
3.00
Conical bends in F-970 left skin
Details
       

 01-01-2012
4.00
Assemble seat backs with -5.5 rivets
Details
       

 12-31-2011
4.50
Tail and center mated; external step holes drilled
Details
       

 12-30-2011
1.00
Mate tail cone and center section
Details

 12-29-2011
1.50
F-741A z brackets
Details

 12-28-2011
4.00
Baked painted parts; small jobs
Details

 12-27-2011
1.00
Finish interior paint on seat back components
Details

 12-26-2011
3.00
Priming/paint seat pans, seat backs
Details

 12-24-2011
2.80
Seat back parts priming prep
Details

 12-17-2011
8.00
Completed match drilling angle members for seat ba
Details
       

 12-11-2011
1.10
Seat back brace hinges
Details

 12-05-2011
2.30
Seat back horizontal angles
Details

 12-04-2011
1.60
Seat back brace lightening holes
Details

 12-03-2011
3.50
Fabricate members for seat backs
Details

 12-02-2011
1.75
F-707B angle bracket--tricky!
Details

 11-29-2011
2.40
Center Section and boogered rivets in tail cone
Details

 11-27-2011
4.20
Riveting fuse cntr section
Details

 10-31-2011
2.30
Aft fuse bottom and side skin--completed.
Details

 10-29-2011
2.80
Aft fuse riveting
Details

 10-12-2011
3.30
Cntr section riveting--better!
Details

 10-11-2011
2.50
Ctr section riveting continues...poorly!
Details

 10-10-2011
4.30
Seat rib/F-904B riveting
Details

 10-09-2011
5.20
Center section part deburr/dimple; begin riveting
Details

 10-07-2011
6.50
Aft fuse blkhd/bottom skin riveting
Details

 10-06-2011
9.10
Aft fuse skin prep / start aft fuse riveting
Details

 10-05-2011
7.80
Aft/ctr fuse skin drill/deburr/dimple/edge smooth
Details

 10-04-2011
7.50
Prime center section parts and aft fuse J-channel
Details

 10-03-2011
8.70
Aft fuse
Details

 10-02-2011
7.80
Fuse center section / Aft fuse J-channel
Details

 09-30-2011
8.00
Fuse Center Section
Details

 09-29-2011
3.90
Aft Fuse pre-riveting prep / Fuse Center Section
Details

 09-28-2011
3.80
Seat Rib Sub-Assy
Details

 09-27-2011
8.30
Seat Rib Sub-assy
Details

 09-26-2011
6.30
Seat Rib Sub-Assy
Details

 09-25-2011
6.30
Countersink aft tail skin; rudder stops
Details

 09-24-2011
1.50
Drilled aft fuselage assy
Details

 09-18-2011
2.50
Tail cone initial assembly: complete J-channel
Details

 09-17-2011
4.30
Tail cone initial assembly; J-channel
Details

 05-14-2011
1.30
Finished main longeron bends and twists
Details

 05-13-2011
2.80
Longeron preparation
Details

 05-10-2011
2.80
Longeron preparation
Details

 05-09-2011
1.90
Main longeron preparation
Details

 05-08-2011
9.00
Flap ribs prep, wash, prime, rivet.
Details

 05-07-2011
8.10
Fit F-706 and flap ribs to bottom skin
Details

 05-06-2011
3.00
Longeron template; flap plate/ ribs and bellcrank.
Details

 05-01-2011
6.80
Prime & rivet blkhds
Details

 04-30-2011
11.80
Finished riveting F-705; prep rest of the blkhds
Details

 04-29-2011
2.80
Riveting F-705 blkhd
Details

 04-28-2011
1.00
F-705 priming
Details

 04-24-2011
3.50
F-705 blkhd prep for priming
Details

 04-22-2011
10.00
Center section/Bulkheads
Details

 04-17-2011
6.00
Completed firewall riveting
Details

 04-11-2011
1.50
Firewall stiffeners
Details

 04-10-2011
8.80
Priming: Firewall stiffeners and center section pa
Details

 04-06-2011
1.80
F-711 bulkhead
Details

 04-05-2011
2.40
F-712 & -711 bulkheads
Details

 04-04-2011
1.50
F-712 bulkhead
Details

 04-03-2011
9.30
F-705 bulkhead
Details

 04-02-2011
6.10
F-705 bulkhead
Details

 03-30-2011
1.00
Assembled material for F-705 bulkhead
Details

 03-26-2011
4.50
Spar center section
Details

 03-25-2011
8.50
Spar center section
Details

 03-19-2011
7.00
Spar center section
Details

 03-17-2011
3.50
Spar center section
Details

 03-16-2011
1.70
Spar center section
Details

 03-15-2011
2.80
Spar center section
Details

 03-14-2011
2.00
Spar center section
Details

 03-13-2011
3.00
Spar center section
Details

 03-11-2011
6.50
Dimpled f/w; countersunk f/w members
Details

 03-10-2011
2.50
Match drilled f/w members
Details

 03-06-2011
11.30
Parts stored; started firewall
Details
       

 03-05-2011
5.50
Finished Inventory--1 shortage
Details

 03-04-2011
10.80
Fuse Kit Arrived
Details
       

 12-27-2010
0.00
Ordered fuse kit today!
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.