Powered By Kitlog Pro v2.0
BRIAN'S WEB SITE
Highlander
Fuselage
Work Logs Found:
42
Category Work Time:
169 Hours
Date
Hours
Work Log Summary
Details
12-15-2013
0.40
Fuel tank decals
Details
12-14-2013
3.00
Nearly Final details
Details
12-10-2013
1.00
Nameplate Install
Details
12-08-2013
2.00
EXPERIMENTAL Decal / Travel Struts
Details
12-07-2013
2.00
Wingtip/Light Install
Details
12-06-2013
0.50
Battery Change in the ELT
Details
11-09-2013
10.00
Interior Carpet, Sanding
Details
11-01-2013
8.00
Interior Carpet, Cowling Work, Sanding
Details
10-26-2013
10.00
Finished Primer, Started Interior Carpet
Details
10-19-2013
2.00
Sanding / Cowling Work
Details
10-01-2013
15.00
Finished Tapes, Started Priming
Details
09-21-2013
6.00
Tapes and Prop
Details
09-15-2013
2.00
Brake line finalization
Details
09-05-2013
2.00
Fabric Tapes
Details
09-01-2013
2.00
Fabric Patches
Details
08-31-2013
6.00
Covered Pilot Side
Details
08-26-2013
7.00
Fuselage Covering
Details
08-17-2013
3.00
Passenger side fabric
Details
08-16-2013
3.75
Bottom Skin
Details
08-07-2013
10.00
Wing mounting, cables trimmed, etc.
Details
07-11-2013
3.00
Windshield Install
Details
06-21-2013
3.00
Windshield Fitting
Details
06-16-2013
5.00
Interior Fabric
Details
06-13-2013
1.00
Primed the Turtle Deck
Details
06-10-2013
3.00
Turtle Deck Fitting
Details
06-08-2013
2.00
Windshield Bracket Mounting
Details
05-29-2013
2.00
Windshield Work
Details
11-13-2011
15.00
Compass Install
Details
02-08-2011
1.50
Rear Inspection Panel
Details
02-06-2011
5.00
Construct the Pilot side door
Details
02-03-2011
5.00
Construct the Passenger Door
Details
01-29-2011
3.50
Header Tank and Trim Installation
Details
01-26-2011
4.00
Bottom Stringer, Rear Windshield Bracket and Heade
Details
01-23-2011
2.00
Left Side Stringer and Flap Selector
Details
01-22-2011
2.00
Top and Right Side Stringer Installation
Details
01-19-2011
2.50
Installed Seats
Details
01-18-2011
2.50
Assembled Seats
Details
01-01-2011
1.50
Installed Main Wheels and Floor Panels
Details
12-31-2010
4.50
Finished Main Gear and Assembled Wheels/Brakes
Details
12-30-2010
4.00
Finish Nose Wheel and Mount Main Legs
Details
12-29-2010
0.75
Attached Nose Wheel Shocks
12-28-2010
1.00
Attach Nose Wheel Leg
Details
SITE NAVIGATION
Contact Builder
Highlander Home
Category
# Logs
# Hours
All
130
686
Assembly
5
30
Avionics
6
30
Empennage
12
90
Engine
10
43
Fuselage
42
169
Inspection
4
8
Miscellaneous
7
47
Painting
4
55
Unpacking/Organizing
1
1
Wings
39
213
Copyright © 2001-2024 Matronics. All Rights Reserved.