Powered By Kitlog Pro v2.0
Brookes Web Site
Velocity XLRG-5
Fuel System
Work Logs Found:
85
Category Work Time:
543 Hours
Date
Hours
Work Log Summary
Details
03-17-2011
1.50
Add Fuel
Details
02-17-2011
4.00
Fuel SO Valve
Details
02-16-2011
7.00
Fuel Shutoff Valve
Details
12-30-2010
5.00
Install Fuel pump and filter plus other
Details
10-02-2010
7.00
Reinstall fuel lines
Details
09-29-2010
9.00
Fuel and vent lines
Details
09-28-2010
8.00
Fuel lines in cabin
Details
09-12-2010
2.50
Mold for fuel shutoff valve control
Details
09-10-2010
3.50
Outboard end strake reinforcement
Details
08-28-2010
5.00
Install sump tank, glass bulkheads
Details
08-27-2010
9.00
Strake cutouts
Details
08-26-2010
3.50
Treat strake cutouts
Details
08-26-2010
3.00
Sump tank capacity and mounting tabs
Details
08-24-2010
3.00
Glass sump tank
Details
08-23-2010
3.00
Cut corners off sump tank
Details
08-21-2010
3.50
Sump tank
Details
08-20-2010
5.00
Leak check CP fuel tanks
Details
07-13-2010
7.00
Fuel vent system
Details
06-30-2010
8.00
Glass inside wheel wells/cut gear leg
Details
06-29-2010
7.50
Preparing wheel well
Details
06-28-2010
6.00
Strake glassing
Details
06-26-2010
8.25
Glass in Slant fuel bulkheads
Details
06-25-2010
8.00
Jeffco slant baggage bulkheads
Details
06-24-2010
6.50
More fuel system glassing
Details
06-23-2010
1.50
Sanded wheel well area
Details
06-23-2010
5.00
Glass Main spar to strake and bulkhead
Details
06-22-2010
4.00
Prepare sump tank
Details
06-22-2010
3.00
Door/strake
Details
06-21-2010
8.00
Install Leading edge strake tips
Details
06-09-2010
4.00
Glass top strake to fuselage
Details
06-09-2010
2.00
Glass in pilot wheel/gear well
Details
06-09-2010
2.00
Glass in CP fuel sight guage
Details
05-31-2010
4.50
Glass underside of wheel well
Details
05-28-2010
3.00
Wing Strake cutout
Details
05-13-2010
6.00
Fixing copilot strake cover
Details
05-12-2010
8.00
Pilot Strake Covered!
Details
05-11-2010
6.00
Copilot Stake Covered!
Details
05-10-2010
7.50
Strake Prep
Details
05-01-2010
9.50
Jeffco and glassing strakes
Details
04-30-2010
7.00
Jeffco CP Strakes
Details
04-29-2010
8.00
Glassing Bulkheads and Baffles
Details
04-27-2010
10.50
Sight guage and bulkheads
Details
04-26-2010
8.00
Sight guage and bulkheads
Details
04-14-2010
7.00
Bulkheads and Jeffco
Details
04-13-2010
11.00
Bulkheads
Details
04-12-2010
6.50
Bulkheads and hardpoints
Details
04-09-2010
7.00
Bulkheads and Baffles
Details
04-08-2010
9.00
Hard points and bulkheads
Details
04-07-2010
4.00
Fuel system hardpoints
Details
03-15-2010
7.50
Install fuel caps, more bulkheads
Details
03-12-2010
8.00
Jeffco, fuel sender, copilot baffles
Details
03-11-2010
8.00
Glass in Baffles, Sight guages
Details
03-10-2010
3.00
Fuel strake bulkheads
Details
03-10-2010
4.00
Fuel Sight Guages
Details
03-02-2010
9.00
Epoxy fuel system hardpoints, glass bulkheads
Details
02-26-2010
8.00
More bulkhead work
Details
02-25-2010
9.50
Copilot wheel well
Details
02-24-2010
8.00
Fuel Fittings, sight guages
Details
02-23-2010
9.00
Fitted copilot wheel/gear well
Details
02-22-2010
10.00
Glass in bulkheads
Details
02-19-2010
8.00
Shape and cleanup bulkhead flanges
Details
02-18-2010
8.00
Built Flanges for bulkheads
Details
02-17-2010
8.00
Cutting and installing copilot wheelwell
Details
02-16-2010
8.00
Fitting copilot wheel well
Details
02-15-2010
8.00
Copilot Wheel Well
Details
02-12-2010
8.00
Strake baggage area bulkheads
Details
02-11-2010
6.00
Fuel System Baffles
Details
01-28-2010
9.00
Bulkhead fitting
Details
01-27-2010
8.00
Install bulkheads
Details
01-26-2010
8.50
Fitting Bulkheads
Details
01-18-2010
8.00
Modify wheel well
Details
01-15-2010
8.00
Fit wheel wells and mod wheel well
Details
01-14-2010
9.00
Cutting well to fit gear
Details
01-13-2010
9.00
Cut gear well holes
Details
01-12-2010
4.50
Cut gear holes in lower strake
Details
01-11-2010
6.00
Glass in lower strake
Details
01-04-2010
4.50
Adhere Lower Strake to Main Spar
Details
12-31-2009
5.50
Final fit of lower strakes
Details
12-30-2009
6.00
Glass aft part of lower strake
Details
12-29-2009
7.50
Hang wings, fit lower strakes
Details
12-28-2009
8.00
Prepare fuselage and strakes
Details
12-09-2009
8.00
Fuselage prep for strakes
Details
12-08-2009
4.00
Lower Strake alignment
Details
12-08-2009
3.50
Cut out Strake bulkheads
Details
10-02-2007
2.00
Glass fuel baffle material
Details
SITE NAVIGATION
Contact Builder
Velocity XLRG-5 Home
Category
# Logs
# Hours
All
468
2663
Avionics
3
12
Canard
14
53
Doors/Windows
14
90
Electrical
39
217
Engine
55
328
Fairings
16
96
Finishing
38
324
Flight Controls
26
128
Fuel System
85
543
Fuselage
68
278
Hydraulics/Gear
58
306
Interior
17
117
Miscelaneous
27
134
Prop
3
16
Tools
1
Wheels/Axles
1
3
Wings
3
18
Copyright © 2001-2024 Matronics. All Rights Reserved.