Powered By Kitlog Pro v2.0
Brookes Web Site
Velocity XLRG-5
Hydraulics/Gear
Work Logs Found:
58
Category Work Time:
306 Hours
Date
Hours
Work Log Summary
Details
10-05-2010
8.00
Wheels and brakes installed
Details
10-04-2010
8.50
Install gear micro switches
Details
10-01-2010
5.00
Nose gear doors, hydraulic lines
Details
09-30-2010
8.75
Repair hydraulic pump
Details
09-23-2010
9.00
Permanent hardware in gear retraction system
Details
09-22-2010
8.00
More gear tweaking
Details
09-21-2010
9.00
Tweaking Gear retraction system
Details
09-20-2010
8.50
Main gear cable installation
Details
09-18-2010
8.50
Install nose gear closer
Details
09-17-2010
10.00
Secure Hydraulic lines
Details
09-16-2010
9.25
Hydraulic plumbinmg
Details
09-15-2010
8.25
Hydraulic line fabrication
Details
09-14-2010
8.25
Fitting Mishler's nose gear closer
Details
09-13-2010
9.50
Gear socket install, relief forms for fuel dump an
Details
09-12-2010
4.00
Prime nose gear leg. Install doors
Details
09-10-2010
5.50
Remove nose gear leg and prepare for priming
Details
07-21-2010
3.50
Install brake lines down gear leg
Details
07-14-2010
5.50
Finish gear doors
Details
07-13-2010
2.50
CP gear door
Details
07-08-2010
4.75
Gear door fitting
Details
07-06-2010
3.50
Gear doors
Details
07-05-2010
6.50
Fitting gear doors
Details
07-03-2010
7.75
Gear doors
Details
07-02-2010
9.00
Gear doors
Details
07-01-2010
8.00
Prepare main gear doors
Details
10-07-2009
1.50
Install Hydraulic Pump
Details
10-06-2009
4.00
Install Gear Contol system
Details
10-05-2009
6.00
Install gear contol system
Details
07-26-2009
2.00
Nose Gear Guides finished
Details
07-25-2009
5.00
Glass in Nose Gear Guides
Details
07-24-2009
7.00
Nose gear guides
Details
07-23-2009
5.50
Prepare Nose Gear Guides
Details
07-23-2009
1.50
Glassed MG bushing on firewall
Details
10-30-2008
5.00
Prepare MG pulley holes
Details
10-29-2008
8.00
Mount MG pulleys
Details
09-03-2008
6.50
Cut holes for gear legs
Details
08-19-2008
7.00
MG Pulley instalation
Details
06-02-2008
5.50
Notch bulkheads for gear legs
Details
06-02-2008
2.00
Locating position for MG pulley system
Details
06-01-2008
2.00
Main Gear Knurled bushings.
Details
05-31-2008
6.00
Triax MG knurled bushings / build gear sockets
Details
05-30-2008
3.00
Fabricate Aluminum spacers for Main Gear
Details
05-29-2008
2.50
Grind top of gear legs make shims
Details
05-27-2008
8.00
Install main gear bushings
Details
05-18-2008
5.00
Glass in Transverse bulkhead
Details
05-17-2008
7.50
Build Transverse bulkheads
Details
05-15-2008
3.00
Enlarge hole for Pilot gear leg
Details
05-14-2008
4.00
Enlarging Pax side gear hole
Details
10-06-2007
1.50
Clean up NG hinge tabs
Details
10-05-2007
2.50
Reinforce nose gear tabs
Details
10-05-2007
0.50
Cut nose gear door into 2 halves
Details
10-04-2007
3.00
Install nose gear doors
Details
10-04-2007
1.50
Install NG captivator
Details
10-03-2007
3.00
Prepare Nose gear door
Details
10-03-2007
2.00
Install overcenter linkage
Details
10-02-2007
3.00
Install nose gear
Details
10-02-2007
0.50
Cut canard bulkhead slot for Nose Gear
Details
09-27-2007
2.50
Install MG & NG Hydraulic cylinders
Details
SITE NAVIGATION
Contact Builder
Velocity XLRG-5 Home
Category
# Logs
# Hours
All
468
2663
Avionics
3
12
Canard
14
53
Doors/Windows
14
90
Electrical
39
217
Engine
55
328
Fairings
16
96
Finishing
38
324
Flight Controls
26
128
Fuel System
85
543
Fuselage
68
278
Hydraulics/Gear
58
306
Interior
17
117
Miscelaneous
27
134
Prop
3
16
Tools
1
Wheels/Axles
1
3
Wings
3
18
Copyright © 2001-2024 Matronics. All Rights Reserved.