Date
|
Hours
|
Work Log Summary
|
Details
|
06-01-2011
|
4.00
|
Cooling plenum
|
Details
|
|
|
03-24-2011
|
6.00
|
Set up engine fuel pressures
|
Details
|
|
|
03-18-2011
|
6.00
|
Start engine
|
Details
|
|
|
03-07-2011
|
2.50
|
Oil-Air separator
|
Details
|
|
|
03-04-2011
|
8.00
|
Cut exhaust pipes and cowling hole
|
Details
|
|
|
03-03-2011
|
5.00
|
Engine exhaust, elevator ends
|
Details
|
|
|
03-01-2011
|
2.50
|
Air/Oil seperator
|
Details
|
|
|
02-28-2011
|
3.00
|
Tighten up connections
|
Details
|
|
|
02-03-2011
|
7.50
|
Engine drain lines, control cables, pitot tube
|
Details
|
|
|
02-02-2011
|
7.50
|
Engine mounts, Prop mounted
|
Details
|
|
|
02-01-2011
|
7.50
|
Enging mounts, Landing light, Pitch servo
|
Details
|
|
|
01-31-2011
|
5.50
|
Fuel pump, Landing light, Engine drain lines
|
Details
|
|
|
01-14-2011
|
6.00
|
Secure Engine control cables
|
Details
|
|
|
01-12-2011
|
7.00
|
Engine control cables
|
Details
|
|
|
01-11-2011
|
6.00
|
Install engine control cables
|
Details
|
|
|
12-23-2010
|
7.00
|
Install Cht and egt sensors
|
Details
|
|
|
12-22-2010
|
6.00
|
Install Prop Governor
|
Details
|
|
|
12-21-2010
|
6.50
|
Tac pickup on Mag
|
Details
|
|
|
12-10-2010
|
6.50
|
Secure hoses and wireing on engine
|
Details
|
|
|
12-08-2010
|
7.50
|
Run EI leads, Place lights in overhead
|
Details
|
|
|
12-07-2010
|
5.00
|
Install more plumbing, plugs, and Mag leads
|
Details
|
|
|
12-06-2010
|
7.00
|
Engine Fuel/Pressure lines
|
Details
|
|
|
12-03-2010
|
6.50
|
Fuel and oil lines
|
Details
|
|
|
12-02-2010
|
6.50
|
Fuel and oil lines
|
Details
|
|
|
12-01-2010
|
7.50
|
Throttle bracket and drain lines
|
Details
|
|
|
11-30-2010
|
7.50
|
Fabricate throttle cable bracket
|
Details
|
|
|
11-29-2010
|
7.50
|
Mixture and Throttle Bracket
|
Details
|
|
|
11-24-2010
|
7.50
|
Fuel lines
|
Details
|
|
|
11-23-2010
|
7.50
|
Install fuel lines
|
Details
|
|
|
11-22-2010
|
7.00
|
Install Electroair CSTW
|
Details
|
|
|
11-20-2010
|
3.50
|
Intercylinder baffles
|
Details
|
|
|
11-19-2010
|
7.50
|
Intercylinder baffles
|
Details
|
|
|
11-18-2010
|
4.00
|
Pre-oiler and firewall components
|
Details
|
|
|
11-09-2010
|
6.50
|
Intercylinder Baffles
|
Details
|
|
|
11-08-2010
|
2.00
|
Engine Baffling
|
Details
|
|
|
10-19-2010
|
7.00
|
Cooling Plenum
|
Details
|
|
|
10-14-2010
|
6.50
|
12.3.4
|
Details
|
|
|
10-13-2010
|
7.50
|
Cooling plenum
|
Details
|
|
|
10-12-2010
|
7.00
|
Cooling Plenum
|
Details
|
|
|
10-09-2010
|
8.00
|
Cooling plenum and doors
|
Details
|
|
|
10-06-2010
|
8.00
|
Engine cooling plenum
|
Details
|
|
|
08-17-2010
|
6.00
|
Hang engine
|
Details
|
|
|
08-16-2010
|
8.50
|
Enging Mount and Cowling
|
Details
|
|
|
08-14-2010
|
12.00
|
Install Firewall
|
Details
|
|
|
12-07-2009
|
5.00
|
Install Oil cooler duct and fresh air scoop
|
Details
|
|
|
12-04-2009
|
8.00
|
Oil cooler duct
|
Details
|
|
|
12-03-2009
|
8.00
|
Install Oil cooler and Fresh air vent
|
Details
|
|
|
12-02-2009
|
8.00
|
Nose Cooler Duct
|
Details
|
|
|
10-10-2009
|
1.00
|
Glass in Oil cooler Nose NACA scoop
|
Details
|
|
|
10-09-2009
|
6.00
|
Flapper valve for oil cooler
|
Details
|
|
|
10-08-2009
|
5.00
|
Fabricate Flapper Valve for oil cooler
|
Details
|
|
|
09-28-2007
|
1.50
|
Fabricate oil cooler duct
|
Details
|
|
|
09-26-2007
|
1.50
|
Install oil cooler NACA scoop
|
Details
|
|
|
09-26-2007
|
2.00
|
Glue Engine cooling NACA ducts in
|
Details
|
|
|
09-26-2007
|
0.50
|
Cut hole for oil cooler NACA duct
|
Details
|
|