Powered By Kitlog Pro v2.0
Brookes Web Site
Velocity XLRG-5
Fuselage
Work Logs Found:
68
Category Work Time:
277 Hours
Date
Hours
Work Log Summary
Details
06-02-2011
7.00
Heater controls, doors, heater tubing
Details
05-30-2011
5.00
Heater controls
Details
02-25-2011
4.00
Install pilot seat
Details
02-23-2011
4.00
Move Pilot seat forward
Details
01-07-2011
6.50
Seats, Keel cover, comm panel
Details
12-20-2010
7.50
Seat Intallation
Details
12-17-2010
7.50
Install rear seats
Details
12-16-2010
7.00
Install rear seats
Details
12-15-2010
6.00
Install rear seats
Details
12-14-2010
2.00
Rear seat install
Details
12-07-2010
3.00
Adjust copilot seat
Details
10-11-2010
8.00
Brake bleeding
Details
09-24-2010
9.00
Install brake lines, sockets
Details
08-20-2010
1.50
Instrument panel
Details
08-19-2010
8.50
Fitting panel
Details
08-18-2010
3.25
Panel
Details
08-17-2010
2.50
Modify Panel
Details
07-16-2010
2.50
Install landing light lense
Details
07-15-2010
2.00
Install plastic instrument panel
Details
07-15-2010
6.00
Install overhead fresh air duct
Details
07-14-2010
4.00
Modify overhead fresh air duct
Details
07-08-2010
4.00
Overhead "instrument" panel
Details
07-06-2010
3.00
overhead "instrument" panel
Details
06-09-2010
4.00
Install seats
Details
06-09-2010
2.00
Glass in CP seat hardpoints
Details
06-07-2010
7.50
Seat Installation
Details
06-04-2010
6.50
Seat construction and hard points
Details
06-03-2010
2.00
Reshaping Glare shield attaching flanges
Details
06-03-2010
7.00
Pilot seat rail hard points
Details
06-02-2010
1.00
Reattach stiffening bar to panel
Details
06-02-2010
6.00
Pilot seat construction
Details
06-01-2010
3.00
Slot on Glareshield for panel
Details
06-01-2010
5.00
Assemble pilot seat
Details
05-31-2010
4.00
Build upper flange onto panel
Details
05-28-2010
5.00
Panel flange treatment
Details
05-22-2010
4.00
Panel
Details
05-21-2010
7.00
Panel
Details
05-20-2010
8.00
Panel fitting
Details
08-28-2009
1.00
Install Battery Shelf
Details
08-27-2009
5.00
Build Battery Tray
Details
08-09-2009
1.00
Build Battery Tray
Details
08-07-2009
5.00
Rudder Pedal/Toe Brake
Details
08-03-2009
5.50
Rudder Pedal/Toe Brake
Details
07-22-2009
2.00
Rudder Pedal/Toe Brake
Details
07-21-2009
5.00
Rudder Pedal/Toe Brke
Details
05-12-2008
4.00
Clean up gear bulkhead/firewall/spar reinforcement
Details
05-08-2008
6.00
Gear bulkhead/firewall/spar reinforcing
Details
05-07-2008
8.00
Gear bulkhead/Firewall/Main spar reinforcements
Details
04-25-2008
4.00
Glassing Main Spar in
Details
04-24-2008
6.00
Main (Center) Spar Installatin
Details
04-23-2008
8.00
Level Airplane
Details
10-05-2007
3.00
Drill hole in fuselage for torque tube
Details
10-05-2007
1.50
Cut fuselage for main spar
Details
10-04-2007
3.00
Install Canard
Details
10-03-2007
1.50
Prepare canard for installation
10-01-2007
2.50
Canard attachment reinforcement
Details
09-28-2007
2.50
Keel stiffening layups
Details
09-28-2007
1.00
Install nut plates for keel NG access
Details
09-27-2007
1.50
Install Keel
Details
09-26-2007
1.00
Glass Nose gear access hole in keel
Details
09-25-2007
2.00
Keel nose gear access hole
Details
09-25-2007
0.50
Drill control stick access holes
Details
09-25-2007
1.00
Cut out landing light and nose gear holes.
Details
09-25-2007
4.00
Cut engine cooling and fresh air NACA scoop holes
Details
09-24-2007
1.00
Remove Keel from fast Build Fuselage
Details
09-24-2007
2.00
Glass wooden hard points onto keel
Details
09-24-2007
0.50
Cut out nose access cover
Details
09-24-2007
2.50
Cut out dog house
Details
SITE NAVIGATION
Contact Builder
Velocity XLRG-5 Home
Category
# Logs
# Hours
All
468
2663
Avionics
3
12
Canard
14
53
Doors/Windows
14
90
Electrical
39
217
Engine
55
328
Fairings
16
96
Finishing
38
324
Flight Controls
26
128
Fuel System
85
543
Fuselage
68
278
Hydraulics/Gear
58
306
Interior
17
117
Miscelaneous
27
134
Prop
3
16
Tools
1
Wheels/Axles
1
3
Wings
3
18
Copyright © 2001-2024 Matronics. All Rights Reserved.