Swinnys 4 Place Bush Explorer
Work Logs Found: 13
Category Work Time: 70 Hours
 Date
Hours
Work Log Summary

Details

 05-10-2015
4.00
First Engine Start
Details
       

 02-11-2015
5.00
Exhaust pipe extensions
Details
       

 02-01-2015
4.00
Scat air cooling tubing & Oil Cooler ducting.
Details
     

 01-31-2015
4.00
Still working on engine install.
Details
       

 01-24-2015
7.00
Engine connections
Details
       

 01-09-2015
5.00
Engine instrument connections
Details
       

 01-07-2015
4.00
Connecting wires to Starter, Alternator, Magneto e
       

 01-05-2015
6.00
Engine connections
Details
       

 12-08-2014
8.00
Fabricating the Oil Cooler duct.
Details
       

 12-05-2014
5.00
Mounting the Oil Cooler.
Details
       

 07-22-2014
8.00
Engine on & brakes now working.
Details
       

 01-25-2011
4.00
Unpacked the Engine
Details
     

 08-09-2010
6.00
Engine arrival
Details
       