Powered By Kitlog Pro v2.0
Kenneths Web Site
RV9A
Wiring
Work Logs Found:
13
Category Work Time:
43 Hours
Date
Hours
Work Log Summary
Details
03-14-2011
3.00
Mounting adel clamps to the motor mount for the wi
Details
09-05-2010
4.00
Ran wireing for the cargo lighyts.
Details
08-29-2010
5.00
Rewired some of the wiring.
Details
08-29-2010
4.00
Relocating wiring.
Details
08-27-2010
2.00
Ran the shelded wiring for strobes.
Details
08-20-2010
6.00
Added an external power plug.
Details
09-05-2008
2.00
Running efis wires.
Details
07-28-2008
2.00
Mounted firewall through hole covers.
Details
07-11-2008
2.00
Ran wiring for the remote compass.
Details
07-05-2008
2.00
Made a bracketfor the remote compass.
Details
07-04-2008
4.00
Installed the voltage shunt.
Details
07-03-2008
4.00
Started running all the efis wires through the fir
Details
07-03-2008
3.00
Checked efis wiring continuity.
Details
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
470
1537
Aileron left
4
16
Aileron right
5
15
Ailerons both
1
4
Avionics
2
3
Baffeling
15
72
Canopy
1
2
Canopy
8
16
Cowling
7
22
Electrial
1
1
Empennage
2
8
Engine
14
42
Engine 0-320
14
42
Exhaust
1
2
Flaps left
4
27
Flaps right
7
34
Fuel Line
1
2
Fuel tank left
8
24
Fuel tank right
13
40
Fuel Tanks
9
18
Fuselage
160
504
Inspection
1
2
Instrument panel
22
68
Instrument panel
7
22
Interior
3
18
Jigs
4
10
Leading edge light.
4
7
Lighting.
1
0
Oil Cooler
2
7
Pitot tube
3
7
Prop
1
3
Rear spar both
1
5
Rear spar left
1
4
Rear spar right
3
10
Rudder
2
4
Shop Cleaning
5
35
Spinner
2
9
Tools
3
6
Vertical stabelizer
6
18
Wign spar left
1
2
Windshield
18
54
Wing left
29
83
Wing ribs
2
7
Wing right
21
82
Wing spar right
1
2
Wings
4
8
Wingtip both
15
72
Wingtip left
1
2
Wingtip right
4
10
Wireing
13
43
Wiring
13
43
Copyright © 2001-2024 Matronics. All Rights Reserved.