KitLog pro

Powered By Kitlog Pro v2.0

Michael's RV-10 Build Log
Work Logs Found: 37
Category Work Time: 150 Hours
 Date
Hours
Work Log Summary

Details

 07-14-2024
45.00
More baffle related and other stuff
Details

 04-09-2024
12.00
Multiple Items
Details

 03-31-2024
4.00
doors/mags/misc
Details

 02-17-2024
8.00
Seat wiring and position levers
Details

 01-14-2024
3.00
Bunch of little things
Details

 01-04-2024
4.00
Cowl and misc
Details

 12-07-2023
5.00
various cabin items
Details

 09-10-2013
1.50
Oxy and vents
Details
       

 04-13-2011
3.00
Some misc things & cleanup
Details

 10-23-2009
5.00
Finished up the closeouts
Details
       

 10-14-2009
3.00
Starboard side passenger closeout
Details
       

 10-13-2009
3.00
Layed-up the port side passenger closeout
Details
       

 03-15-2009
9.00
Painted hat shelf, reinstalled baggage floor
Details
       

 07-15-2008
1.50
More work on seatbelt hardpoints
Details
       

 07-09-2008
3.50
Little electrical, little fiberglass
Details
       

 07-05-2008
2.00
Seat belt and electrical
Details
       

 07-02-2008
2.00
Drilled pads and located aft hardpoints for seatbe
Details

 06-27-2008
2.50
Finished console and some firewall work.
Details
       

 06-25-2008
2.00
Console mount finishing work
Details
       

 06-24-2008
3.00
More work on console
Details
       

 06-20-2008
2.00
Misc cleanup from SB and hardpoint work
Details
       

 06-18-2008
5.50
SB and other stuff
Details
       

 06-17-2008
1.50
Couple misc items
Details
       

 01-28-2008
2.00
Cleaned up the fuselage and prepared to restart co
Details
       

 05-12-2006
2.00
Static port connection and hat shelf.
Details
       

 05-07-2006
1.50
More ski racks
Details
       

 05-06-2006
1.00
Finished fabrication of the ski racks.
Details
     

 05-05-2006
1.50
Yet more battery and ski racks
Details
       

 05-04-2006
1.50
More battery and ski rack mods
Details
       

 05-03-2006
1.50
Continued with battery tray and ski rack mods
Details
       

 05-02-2006
1.00
Tail light nuts and more ski rack.
Details
       

 05-01-2006
1.50
Mounted ELT, made gaskets for heat boxes
Details
       

 04-29-2006
1.50
Fabricate mount for external power socket
Details
       

 04-28-2006
1.50
Rivet in aft ski racks & mount ELT antenna
Details
       

 04-27-2006
0.25
Step mount
Details
       

 11-18-2005
0.25
Started on dual battery modification.
Details
       

 10-29-2005
2.50
Aileron trim and fairings
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.