John (Jack) Clark's Web Site
RV-A8
Avionics
Work Logs Found:
206
Category Work Time:
404 Hours
Date
Hours
Work Log Summary
Details
08-28-2014
2.50
Autopilot Testing
Details
06-07-2014
0.50
Replaced the VoiceFlight VAS Switch
Details
05-06-2014
1.50
Angled the Dual GRT EFISs Upward
Details
04-11-2014
1.00
Checked ELT For Expiration Data
Details
04-06-2014
0.50
Installed New Seattle Avionics Maps and Plates
Details
02-25-2014
2.00
Finished Checklists/Setup the G430W & GTX 327
Details
02-24-2014
2.00
Entered Checklists into the VP System
Details
12-14-2013
2.00
Attached the Coax Cable to the Bob Archer Antenna
Details
12-11-2013
0.50
Secured Right Tip Lights Wires Along VOR Antenna
Details
10-14-2013
1.00
Installed a Replacement VoiceFlight VAS Switch
Details
10-07-2013
2.00
Update Garmin G430W and the VoiceFlight System
Details
02-02-2013
0.25
Secured the GPS Antennae
Details
01-29-2013
4.00
Configured GRT EFISs for ADS-B
Details
01-28-2013
1.00
Called NavWorx
Details
01-27-2013
2.00
NavWorx ADS-B Configuration
Details
01-06-2013
1.00
Garmin GPS 18x is Working Great
Details
01-05-2013
3.00
Installed VoiceFlight USB Update Port
Details
12-21-2012
1.00
Added Power Switch for the VoiceFlight
Details
12-19-2012
1.00
Installed the VoiceFlight Voice Activation Switch
Details
09-12-2012
4.00
Troubleshot the Com Problems
Details
09-10-2012
3.00
Rewired the Grounds of the Copilot Stick Grip
Details
09-08-2012
1.00
Trimmed GPS Antennae Shims and Installed
Details
09-08-2012
1.00
Tested the Intercom and the Radios First Time
Details
09-07-2012
1.50
Re-fabricated the GPS Antennae Shims
Details
09-06-2012
1.50
Formed a Shim for the GPS Antennae
Details
09-05-2012
0.75
Drilled Holes in Aft Top Skin for the GPS Antennae
Details
09-03-2012
1.50
Wired the VoiceFlight Wires to the Pilot's Com Jac
Details
08-31-2012
3.00
Wired the VoiceFlight Box
Details
08-31-2012
0.50
Adjusted the Installation of the Avionics Post Gro
Details
08-17-2012
1.00
Attached VoiceFlight Box to Forward Avionics Bulkh
Details
08-14-2012
2.00
Fabricated and Installed Rear Stick Connector Moun
Details
06-18-2012
1.50
Changed GRT EFIS Tiny 4-40 Screws to Large Ones
Details
06-16-2012
0.00
Worked to Organize Left Side of Avionics Bay 2
Details
06-16-2012
2.00
Worked to Organize Left Side of Avionics Bay 1
Details
05-24-2012
0.50
Stuck Pitot and AoA Tubes Through Lt Fuselage
Details
05-16-2012
0.50
Ran The VOR Coax Throught the Rt Fuselage Wall
Details
05-15-2012
1.00
Installed the Two Communication Antennae
Details
05-10-2012
1.00
Wired the IBBS Info Light
Details
05-08-2012
1.00
Installed a IBBS LED Indicator Light in the Panel
Details
05-07-2012
1.00
Re-Installed TCW IBBS
Details
04-15-2012
0.50
Removed IBBS for shipping
Details
04-15-2012
2.00
Found Out the GRT HX Can't Read IBBS Voltages
Details
04-12-2012
1.00
Installed the TCW IBBS Master Cutoff Switch
Details
04-11-2012
0.50
Corrected Fuel Totalizer Wiring on #1 Injector
Details
03-21-2012
1.00
Sent the ADS-B Back for Hardware and Software
Details
03-20-2012
2.00
The VP Serial 7 Input to the GRT EFISs Missing
Details
03-20-2012
0.50
Removed the ADS-B for Return for Upgrade
Details
03-19-2012
1.00
Return to Troubleshoot Missing ELT GPS Signal
Details
03-18-2012
3.00
Checked ELT GPS Signal without success
Details
03-17-2012
2.00
Unable to configure the ADS-B
Details
03-15-2012
3.00
Configured the GRT HX Displays and the VP System
Details
03-14-2012
2.00
Investigated Absence of Fuel Totalizer Value on EI
Details
03-10-2012
3.00
Configured the EIS and GRT HX EFIS Displays
Details
03-03-2012
0.00
Unstalled Panel USB Plugs
03-03-2012
3.00
Installed 3 USB Plugs in the Instrument Panel
Details
09-20-2011
1.00
Attached TNC Connector For G430W GPS
Details
09-18-2011
7.00
Fixed the G-430W Backup Power Problem
Details
09-17-2011
6.00
Tested EFISs OK. Checked Backup Power System
Details
09-15-2011
3.00
Finished EFIS/AHRSs CPC Connectors Installation
Details
09-14-2011
2.50
Re-wired the EFISs and AHRSs Secondary Power
Details
09-12-2011
4.00
Finished Avionics Installation and Power Up
Details
09-11-2011
2.50
Re-installed Avionics in Panel and Secured Wires
Details
09-07-2011
1.00
Wired the ADS-B Fault Light
Details
09-06-2011
0.75
Installed AHRSs and Pitot/Static Connections
Details
09-06-2011
0.25
Adel Secures Gretz and VP Cables
Details
09-01-2011
0.50
Connected G430W GPS Antenna to Rack
Details
09-01-2011
1.50
Connected Fuel Guardian and Autopilot Wires
Details
08-28-2011
0.50
Primed the AHRS Mount
Details
08-28-2011
1.00
Installed the ADS-B Fault Light in the Panel
Details
08-28-2011
0.50
Installed Rivnuts to Attach the AHRS Mount
Details
08-27-2011
1.50
Clecoed the Forward Top Skin in place
Details
08-26-2011
2.50
Connected Antennae to the Avionics
Details
08-25-2011
1.50
Fabricated a Mount of the VOR Antenna Splitter
Details
08-20-2011
2.00
Ran EIS Out Wire from EFIS towards the EIS
Details
08-20-2011
0.50
Connected TCW IBBS Info wire to the GRT EFIS
Details
08-15-2011
2.50
Finished Pitot/Static Installation To the EIS
Details
08-14-2011
6.00
Wired the Autopilot Terminal
Details
08-12-2011
2.00
Wired Gretz Heated Pitot Tube Output to VP Sys.
Details
08-11-2011
1.00
Mounted Gretz to VP Conversion Circuit Board
Details
08-08-2011
2.00
Connected ELT Power, Ground and Shield
Details
08-06-2011
2.50
Straightened/Organized more wiring
Details
08-06-2011
1.00
Reversed the Antenna Pigtail Direction
Details
08-06-2011
1.00
Connected the AFS AoA to the Pitot/Static System
Details
08-06-2011
0.00
Connected GPS Serial Output to the ELT - Cont.
Details
08-06-2011
2.00
Connected GPS Serial Output to the ELT
Details
08-05-2011
5.00
Worked on several tasks that need to be done.
Details
08-05-2011
3.00
Wired the EIS System
Details
07-12-2011
2.00
Soldered the Mini DIN Connector for GPS to ELT
Details
07-12-2011
0.00
Soldered the Mini DIN Connector for GPS to ELT
Details
07-12-2011
1.00
Laced the ELT Related Wires
Details
07-10-2011
1.00
Installed the ELT Antenna
Details
07-09-2011
3.00
Cut the Panel for the ELT Remote Panel Control
Details
07-08-2011
1.00
Ran the ELT Cables Forward Along Right Side
Details
07-07-2011
1.00
Flipped the ELT Securing Bands
Details
07-06-2011
3.00
Replaced the ELT Mounting Plate
Details
06-25-2011
1.50
Riveted the EIS Tray to the Forward Right Panel
Details
06-24-2011
0.50
Top Coated the EIS Tray Dawn Patrol Grey
Details
06-23-2011
2.00
Primed EIS Tray After Drilling to Right FWD Panel
Details
06-15-2011
1.50
Modified the EIS Tray
Details
06-14-2011
2.50
Fabricated the EIS Tray
Details
06-04-2011
1.00
Installed Mic and Headphone Jacks
Details
06-02-2011
2.50
Soldered Wires to the Mike and Headset Plugins
Details
05-30-2011
1.50
Wired the Tank Sensors for the Fuel Guardian
Details
05-28-2011
2.00
Ran Pitot/Static Lines to the AHRS
Details
05-28-2011
6.00
Organized Wires on the Left Side of the Panel
Details
05-28-2011
0.00
Organized Wires
Details
05-26-2011
1.00
Ran the Magnetometer Wires Through the Panel
Details
05-26-2011
2.00
Ran Backup Power Wires to the AHRSs
Details
05-25-2011
1.50
Organized Panel Wires
Details
05-24-2011
1.50
Put the Avionics Trays Back on the Panel
Details
05-24-2011
1.50
Laced More Wires Behind the Panel
Details
05-22-2011
1.50
Painted the Panels Rustoleum Graphite Gray
Details
05-22-2011
4.00
Organized Avionics Wires Behind the Panel
Details
05-22-2011
1.00
Cut Panel Holes for the Air Vents
Details
05-21-2011
1.00
Prepared to Cut Panel Holes for the Air Vents
Details
05-19-2011
8.00
Still Organizing Avionics Wires
Details
05-15-2011
8.00
Installed and Wired the TCW IBBS
Details
05-14-2011
6.50
Organizing Panel Wires
Details
05-10-2011
6.00
Organized Panel Wires
Details
05-10-2011
0.00
Organized Panel Wires
Details
05-09-2011
1.50
Worked on Organizing Avionics Wiring on Right Side
Details
05-09-2011
1.50
Soldered the SL-40 Antenna Pigtail in Place
Details
05-09-2011
0.00
Soldered the SL-40 Antenna Pigtail in Place
Details
05-06-2011
2.50
Soldered 10K Ohm Resistors in Keep Alive Wires
Details
05-06-2011
2.50
Removed the Instrument Panel Equipment
Details
04-02-2011
6.00
Receiving Fault Message on the Backup B Panel
Details
04-01-2011
2.00
Programming G430W and GRT EFISs
Details
03-27-2011
1.50
Programmed the GRT EFISs until Battery Died
Details
03-23-2011
1.50
Programming the VP-200
Details
03-22-2011
1.50
Installed an Inline Fuse for the Fuel Guardian Lig
Details
03-20-2011
1.00
Wired Inline Fuse Holders for the Fuel Guardian
Details
03-19-2011
1.50
Ran the Pitot/Static Lines for the Avionics and Ao
Details
03-16-2011
1.00
Corrected Light Wiring of Fuel Guardian
Details
03-14-2011
1.00
Farmiliarized Myself with Programming the VP-200
Details
03-12-2011
1.00
Updated the GRT EFISs Nav Data
Details
03-11-2011
2.00
Found the Cause of the AHRSs Failures
Details
03-10-2011
2.50
Started testing elctrical circuits
Details
03-04-2011
8.00
Installed the AHRSs Mounting Platform
Details
03-02-2011
1.00
Made Left Side of the AHRS Mount
Details
02-28-2011
1.50
Ran Five 20ga. Wires from the Hub to the Firewall
Details
02-27-2011
2.00
Wired the Grounding Hub
Details
02-27-2011
3.00
Installed and Wired the Panel Grounding Hub
Details
02-26-2011
3.00
Wired GNS 430W to the Avionics Power Terminal
Details
02-26-2011
1.00
Mounted the Fuel Guardian
Details
02-20-2011
2.00
Wired the AFS Sport Angle of Attack Indicator
Details
02-20-2011
4.00
Wired Power for Avionics to the Terminal
Details
02-20-2011
0.50
Started to Run Mic and Headphone Wires
Details
02-20-2011
1.00
Soldered Wires to AoA Test and Dimmer Buttons
Details
02-14-2011
2.00
Wired Power Side of the Lighting Terminal
Details
02-13-2011
3.00
Wired the Bottom Row of Avionics Power Terminal
Details
02-12-2011
8.00
Worked on Wiring the Left Side of the Panel
Details
02-11-2011
1.50
Attached TCW IBBS to the Baggage Bulkhead
Details
02-08-2011
1.00
Installed the Instrument Panel in the Aircraft
Details
02-06-2011
2.00
Switched Front Stick Grip Direction on the Stick
Details
02-06-2011
1.00
Installed Connector on Rear Stick Fuselage Cable
Details
02-06-2011
2.50
Corrected the Wiring of the Grips PTT Switches
Details
02-06-2011
1.50
Attached D-sub Connector on Rear Stick Cable
Details
02-04-2011
2.50
Trimmed the F-803B L&R to Clear Installed Avionics
Details
02-03-2011
4.00
Installed Avionics in the Panel
Details
02-03-2011
2.00
Attached Cables to the Aft End of Avionics Trays
Details
02-02-2011
0.25
Drilled Holes for the AoA Button Switches
Details
01-29-2011
2.00
Cut the Opening for the Advanced Flight AoA
Details
01-28-2011
3.00
Cut the Panel Opening for the Bottom EFIS
Details
01-27-2011
3.00
Cut the Upper GRT HX Opening in the Panel
Details
01-24-2011
1.00
Put D-sub Connector on the Front Stick Cable
Details
01-24-2011
1.00
Installed the Rear Stick Grip on the Stick
Details
01-23-2011
2.00
Installed the Grips Back on the Sticks
Details
01-18-2011
1.00
Re-Riveted Antennae Doublers to Fuselage
Details
01-17-2011
3.00
Removed all of the Antennae Doubler Installations
Details
01-12-2011
5.00
Installed the Fuel Guardian Lights in the Panel
Details
01-10-2011
2.00
Mounted a Flaps Microswitch for the Advanced AoA
Details
01-08-2011
3.00
Cut Mounting Holes for the TruTrak Turn and Bank
Details
01-06-2011
2.00
Match Drilled the Avionics Mounting Rail To Panel
Details
01-04-2011
2.50
Attached the Avionics Mounting Rail to Avionics
Details
12-31-2010
0.50
Put BNC Connector on the Transponder Cable
Details
12-31-2010
1.00
Made Hangers for the ADS-B GPS Antenna Cable
Details
12-28-2010
8.00
Cut the Holes for the Vertical Power Display Unit
Details
12-27-2010
1.50
Drew Verical Power Display Unit Opening
Details
12-26-2010
2.50
Made 16 Nuts for the Avionics Mounting Rail
Details
12-26-2010
0.50
Duct Taped the Avionics Trays Together
Details
12-26-2010
3.00
Cut the Avionics Stack Opening in the Panel
Details
12-20-2010
1.50
Drew GRT EFIS Positions on the Panel
12-18-2010
2.00
Instrument Panel Planning and Photos
Details
12-18-2010
0.00
Instrument Panel Planning and Photos
12-16-2010
1.00
Ran the ADS-B GPS Cable
Details
12-15-2010
2.50
Installed the ADS-B cable 37 pin D-Sub Connector
Details
12-12-2010
0.25
Installed the Transponder Antenna
Details
12-12-2010
1.00
Installed the ADS-B UAT Antenna and Cable
Details
12-08-2010
1.00
Put Shells on the Magnetometer D-Dub Connectors
Details
12-06-2010
1.00
Routed the Magnetometer Bundles
Details
12-05-2010
2.00
Laced the Remaining Magnetometer Wiring Bundle
Details
12-04-2010
2.50
Laced One of the Magnetometer Wire Bundles
Details
11-21-2010
4.00
Fabricated the Transponder Antenna Doubler Plate
Details
11-20-2010
1.00
Attached the FastStack Pro-X Hub to Panel
Details
11-19-2010
3.00
Fabricated Doubler Plates for the Commo Antennae
Details
11-17-2010
1.00
Drilled and Dimpled the ADS-B Antenna Doubler
Details
11-16-2010
1.50
Fabricated the ADS-S Antenna Doubler
Details
11-12-2010
2.00
Installed the Dual Magnetometers
Details
11-10-2010
0.50
Drilled Mounting Holes in the Magnetometers
Details
11-10-2010
0.50
Drew a Template for the Magnetometer Installation
Details
11-07-2010
2.00
Ran the RG-400 Cables for the Antennae
Details
11-07-2010
0.50
Ran Fuel Level Cables from the Panel Area
Details
11-02-2010
3.00
Ran Autopilot Servo Wires
Details
10-27-2010
1.50
Mounted the ADS-B to the Mounting Panel
Details
10-26-2010
2.50
Finished the ADS-B Mount
Details
10-25-2010
3.00
Started Fabrication of NavWorx ADS-B Mount
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
RV-A8 Home
Category
# Logs
# Hours
All
2277
6152
Aircraft Related
314
1432
Avionics
206
404
Brakes
11
18
Canopy
41
63
Cooling System
7
9
Cowl Flap
13
20
Cowling
146
354
Electrical System
157
311
Empennage
29
48
Engine
88
158
Fiberglass
148
316
Finishing Kit
27
76
First Flight Prep
4
1
Flight Control Syste
75
118
Flight Testing
18
20
Flights
6
7
Forward Baggage Comp
6
9
Forward Top Skin
24
36
Fuel System
84
155
Fuselage
344
812
Heating System
1
0
Inspection
5
5
Interior
24
20
Landing Gear
53
100
Lighting
17
27
Miscellaneous
8
5
None
14
6
Oxygen System
5
6
Painiting
11
28
Painting
11
28
Prop
22
27
Sensors
5
7
Testing
1
1
Ventilation
3
4
Windscreen
8
13
Wing Construction
27
76
Wings
314
1432
Copyright © 2001-2024 Matronics. All Rights Reserved.