Powered By Kitlog Pro v2.0
Michael's RV-10 Build Log
RV-10
Fairings
Work Logs Found:
16
Category Work Time:
114 Hours
Date
Hours
Work Log Summary
Details
08-21-2024
80.00
Lot's of different things
Details
02-20-2021
8.00
Wheel fairing work
Details
02-15-2021
5.00
Work on gear fairings
Details
11-16-2005
2.00
Finished up left wing tip
Details
11-15-2005
1.00
Riveted on left tip nutplates
Details
11-14-2005
2.00
Drilled left tip and mounted strobe pack.
Details
11-13-2005
1.50
Installed MB antenna in right tip.
Details
11-12-2005
1.50
Attached right wingtip
Details
11-11-2005
2.00
Cleaned up light area and positioned them.
Details
11-09-2005
1.50
Riveted on nutplates for right wingtip
Details
11-08-2005
2.00
Fitted right wingtip lens and nav antenna.
Details
11-07-2005
1.00
Drilled right wingtip
Details
11-01-2005
0.60
Finished rough trim to fit of wingtips
Details
10-31-2005
0.75
Started some prep on the wing tips
Details
10-29-2005
3.00
Finished 4 of 7 Emp fairings
Details
09-11-2005
2.50
Started to fit some fairings
Details
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
510
2143
Ailerons
10
22
Avionics/Instruments
17
181
Avionics/Wire
17
181
Cowl
17
271
Elevators
12
50
Empennage Assembly
4
18
Engine
13
92
Fairings
16
114
Flaps
10
24
Fuel Tanks
16
46
Fuselage
187
530
Hat Shelf
8
16
Horizontal Stab
12
31
Interior
4
17
Inventory
11
24
Lighting
8
55
Lighting/Electrical
8
55
Miscellaneous
37
150
Paint
14
23
Prop
1
4
Rudder
10
18
Systems
12
29
Tail Cone
16
49
Vertical Stabilizer
8
16
Wing Leading Edge
8
27
Wing Ribs
4
18
Wing Skins
17
46
Wing Spars
5
25
Wings Assembly
8
11
Copyright © 2001-2024 Matronics. All Rights Reserved.