Powered By Kitlog Pro v2.0
Bills Safari Adventure
Safari
Frame
Work Logs Found:
50
Category Work Time:
196 Hours
Date
Hours
Work Log Summary
Details
03-29-2012
2.00
Got er done
Details
03-28-2012
2.00
Trying to Mount the Bubble
Details
03-26-2012
2.00
Trying to mount bubble
Details
03-24-2012
4.00
Remove and Refinish Instrument Pod and Floor
Details
12-10-2011
8.00
Governor Linkage, Counterbalance Springs
Details
11-05-2011
7.00
Install Gas Tanks and Build Braces
Details
11-01-2011
2.00
Bubble Finally Installed
Details
10-30-2011
3.00
Install Govenor and Bubble (con't)
Details
10-29-2011
5.00
Misc and Bubble Installation
Details
10-09-2011
4.00
Install Cable Controls
Details
09-17-2011
8.00
Plumbing and Misc
Details
09-13-2011
2.00
Fix Interior Panel
Details
09-05-2011
8.00
Wiring, Alt Air Box Misc.
Details
08-28-2011
4.00
Install Fuel LInes and Antelope Hunt
Details
05-01-2011
5.00
Bed Liner and Miscellaneous
Details
04-24-2011
3.00
Remake and Coat interior parts
Details
04-23-2011
4.00
Install Doublers and Antennas
Details
04-17-2011
3.00
Finish Riveting.
Details
04-16-2011
5.00
Riveting the Exterior Sheet Metal
Details
03-06-2011
3.00
Make it Nekked Again
Details
03-05-2011
5.00
Finish Up Interior Sheet Metal
Details
02-27-2011
4.00
Interior Sheet Metal
Details
02-26-2011
7.00
Interior Sheet Metal
Details
02-25-2011
5.00
Interior Sheet Metal
Details
02-05-2011
5.50
Construct and Attach Instrument Pod
Details
01-25-2011
2.00
Still Working on Pedestal
Details
01-24-2011
1.50
Still building Pedestal
Details
01-23-2011
5.00
Instrument Pod Pedestal
Details
01-22-2011
4.00
Instrument Pod Support
Details
01-21-2011
1.00
Weld up Hole
Details
01-16-2011
5.00
Finish Control Rods, Avionics
Details
01-15-2011
6.00
Control Rods
Details
01-14-2011
1.25
Sheet Metal and Control Rods
Details
01-10-2011
3.00
Battery Box
Details
01-09-2011
4.00
Seat Back and Seats
Details
01-08-2011
8.50
Finish Front of Seats
Details
01-07-2011
4.00
Cut and Fit Front of Seat
Details
01-05-2011
2.00
Finish Side Panels
Details
01-04-2011
3.00
Working on interior pieces
Details
01-02-2011
3.00
OH CRAP
Details
01-01-2011
2.00
Corrosion Inhibitor
Details
12-31-2010
3.00
Thinking
Details
12-30-2010
5.00
Still installing nut plates
Details
12-29-2010
6.00
Install Nut Plates
Details
12-28-2010
2.00
Install Nut Plates
Details
12-21-2010
4.00
Reinstall Painted Panels
Details
12-20-2010
3.00
Paint interior surfaces
Details
12-19-2010
4.00
Prime
Details
12-18-2010
3.00
Disassemble and prep for paint
Details
11-02-2010
0.00
Bubble Mounting
Details
SITE NAVIGATION
Contact Builder
Safari Home
Category
# Logs
# Hours
All
150
556
Avionics
28
102
Empennage
12
69
Engine
23
81
Frame
50
196
Main Rotor
16
22
Main Transmission
5
16
Miscellaneous
8
27
None
1
3
Test Flight
1
Tools
3
16
Trailer
3
24
Copyright © 2001-2024 Matronics. All Rights Reserved.