KitLog pro

Powered By Kitlog Pro v2.0

Bills Safari Adventure
Work Logs Found: 50
Category Work Time: 196 Hours
 Date
Hours
Work Log Summary

Details

 03-29-2012
2.00
Got er done
Details

 03-28-2012
2.00
Trying to Mount the Bubble
Details

 03-26-2012
2.00
Trying to mount bubble
Details

 03-24-2012
4.00
Remove and Refinish Instrument Pod and Floor
Details
       

 12-10-2011
8.00
Governor Linkage, Counterbalance Springs
Details
       

 11-05-2011
7.00
Install Gas Tanks and Build Braces
Details
       

 11-01-2011
2.00
Bubble Finally Installed
Details
     

 10-30-2011
3.00
Install Govenor and Bubble (con't)
Details

 10-29-2011
5.00
Misc and Bubble Installation
Details

 10-09-2011
4.00
Install Cable Controls
Details
     

 09-17-2011
8.00
Plumbing and Misc
Details
     

 09-13-2011
2.00
Fix Interior Panel
Details
       

 09-05-2011
8.00
Wiring, Alt Air Box Misc.
Details
       

 08-28-2011
4.00
Install Fuel LInes and Antelope Hunt
Details
       

 05-01-2011
5.00
Bed Liner and Miscellaneous
Details
       

 04-24-2011
3.00
Remake and Coat interior parts
Details
       

 04-23-2011
4.00
Install Doublers and Antennas
Details

 04-17-2011
3.00
Finish Riveting.
Details
       

 04-16-2011
5.00
Riveting the Exterior Sheet Metal
Details
       

 03-06-2011
3.00
Make it Nekked Again
Details
     

 03-05-2011
5.00
Finish Up Interior Sheet Metal
Details
       

 02-27-2011
4.00
Interior Sheet Metal
Details

 02-26-2011
7.00
Interior Sheet Metal
Details

 02-25-2011
5.00
Interior Sheet Metal
Details

 02-05-2011
5.50
Construct and Attach Instrument Pod
Details
       

 01-25-2011
2.00
Still Working on Pedestal
Details
     

 01-24-2011
1.50
Still building Pedestal
Details
       

 01-23-2011
5.00
Instrument Pod Pedestal
Details
       

 01-22-2011
4.00
Instrument Pod Support
Details
     

 01-21-2011
1.00
Weld up Hole
Details
       

 01-16-2011
5.00
Finish Control Rods, Avionics
Details
       

 01-15-2011
6.00
Control Rods
Details
       

 01-14-2011
1.25
Sheet Metal and Control Rods
Details
       

 01-10-2011
3.00
Battery Box
Details
       

 01-09-2011
4.00
Seat Back and Seats
Details
       

 01-08-2011
8.50
Finish Front of Seats
Details

 01-07-2011
4.00
Cut and Fit Front of Seat
Details
       

 01-05-2011
2.00
Finish Side Panels
Details
       

 01-04-2011
3.00
Working on interior pieces
Details
       

 01-02-2011
3.00
OH CRAP
Details
       

 01-01-2011
2.00
Corrosion Inhibitor
Details

 12-31-2010
3.00
Thinking
Details
       

 12-30-2010
5.00
Still installing nut plates
Details

 12-29-2010
6.00
Install Nut Plates
Details

 12-28-2010
2.00
Install Nut Plates
Details

 12-21-2010
4.00
Reinstall Painted Panels
Details

 12-20-2010
3.00
Paint interior surfaces
Details

 12-19-2010
4.00
Prime
Details

 12-18-2010
3.00
Disassemble and prep for paint
Details
       

 11-02-2010
0.00
Bubble Mounting
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.