Powered By Kitlog Pro v2.0
My Airplane Projects
RV-12
Exterior Finish
Work Logs Found:
30
Category Work Time:
140 Hours
Date
Hours
Work Log Summary
Details
09-10-2011
2.00
Enlarged spar slots, painted plexiglass backside.
Details
09-05-2011
8.00
Cosmetic touch-ups.
Details
06-16-2011
1.00
Installed the new N numbers.
Details
12-18-2010
0.00
Moved cowl to T hangar.
Details
12-17-2010
0.00
Moved more parts to airport.
Details
12-12-2010
6.50
Painting done except wheel pants.
Details
12-11-2010
8.00
Painted.
Details
12-10-2010
8.00
Installed access covers, primed parts.
Details
12-03-2010
3.00
Moved fuselage to NY0 FBO hangar.
12-02-2010
3.00
Moved wings to T hangar at NY0.
11-28-2010
9.00
Finished fuselage painting.
Details
11-27-2010
7.00
Primed and painted white on fuselage.
Details
11-26-2010
14.00
Primed and painted wings.
Details
11-25-2010
6.00
Moved fuselage, began painting.
11-24-2010
5.00
Moved parts, prepped paint shop.
Details
11-21-2010
0.00
Moved wings to paint shop.
Details
11-10-2010
5.00
Finished roughing fuselage, ran pitot/static tests
Details
11-09-2010
4.00
Roughed the fuselage top and sides.
Details
11-08-2010
4.00
Worked on right wing and ASTprep.
Details
11-06-2010
4.00
Final primed fiberglass parts.
Details
11-05-2010
3.00
Continued prep of left wing.
Details
11-04-2010
6.00
Finished roughing right wing, started left.
Details
11-02-2010
4.00
Trimmed, prepped right wing top surface.
Details
11-01-2010
7.00
Worked on fiberglass and aluminum paint prep.
Details
10-29-2010
5.00
Worked aluminum and fibergass.
Details
10-28-2010
4.50
Sanded fiberglass primer.
Details
10-27-2010
5.50
Primed fiberglass.
Details
10-25-2010
2.00
Still working the fiberglass........
Details
10-24-2010
2.00
Sanded fiberglass parts.
Details
10-23-2010
4.00
Inspected and worked fiberglass.
Details
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
RV-12 Home
Category
# Logs
# Hours
All
721
2599
Avionics
12
46
Condition Inspection
29
32
Empennage
44
173
Engine
29
132
Engine
5
102
Exterior Finish
30
140
Final Assembly
32
96
Final Assembly/Tests
32
96
Final Assembly/Tst
32
96
Finish
93
376
Finish Kit
93
376
Firewall Forward
29
132
Flaperons
10
36
Flight Tests
26
46
Fuel System
1
Fuselage
83
311
Lighting
11
44
Miscellaneous
2
4
Modifications
47
56
None
17
Preparation
7
44
Repairs
4
Shipping
3
9
Wheel Pants
18
72
Wings
32
180
Copyright © 2001-2024 Matronics. All Rights Reserved.