Date
|
Hours
|
Work Log Summary
|
Details
|
02-28-2014
|
3.00
|
SB 14-01-31 part 8, reinstalling the empennage
|
Details
|
|
|
02-26-2014
|
4.00
|
SB 14-01-31 part 7, match-drilling and riveting th
|
Details
|
|
|
02-26-2014
|
2.00
|
SB 14-01-31 part 6, fabricating the main rib forwa
|
Details
|
|
|
02-25-2014
|
3.00
|
SB 14-01-31 part 5, riveting doublers to the forwa
|
Details
|
|
|
02-25-2014
|
3.00
|
SB 14-01-31 part 4, positioning the spar doublers
|
Details
|
|
|
02-25-2014
|
2.00
|
SB 14-01-31 part 3, main rib forward flange remova
|
Details
|
|
|
02-24-2014
|
2.00
|
SB 14-01-31 part 2, removing forward spar angles
|
Details
|
|
|
02-21-2014
|
4.00
|
SB 14-01-31 part 1
|
Details
|
|
|
10-31-2013
|
2.00
|
Install rudder cable outlet covers
|
Details
|
|
|
10-29-2013
|
4.00
|
Installing the empennage fairing
|
Details
|
|
|
10-23-2013
|
3.00
|
Horizontal stab end caps: Filling, final install
|
Details
|
|
|
10-15-2013
|
2.00
|
Elevator/push tube connections
|
Details
|
|
|
10-12-2013
|
2.00
|
Bolted the Rudder into place!
|
Details
|
|
|
10-08-2013
|
2.00
|
Horizontal Stabilizer end caps
|
Details
|
|
|
10-08-2013
|
2.00
|
Balancing the elevators
|
Details
|
|
|
10-03-2013
|
2.00
|
Installing/connecting the elevator trim servo
|
Details
|
|
|
10-03-2013
|
3.00
|
Bolting on the elevator
|
Details
|
|
|
08-20-2013
|
3.00
|
Installing the horizontal/vertical stabilizers
|
Details
|
|
|
08-15-2013
|
3.00
|
Empennage fairing, part 1
|
Details
|
|
|
08-14-2013
|
3.00
|
Vertical Stab Top Cap part 2
|
Details
|
|
|
08-14-2013
|
3.00
|
Empennage fairing, part 1
|
Details
|
|
|
07-20-2013
|
2.00
|
Elevator end caps, part 2
|
Details
|
|
|
07-20-2013
|
3.00
|
Elevator end caps
|
Details
|
|
|
07-19-2013
|
3.00
|
Vertical Stab Top Cap
|
Details
|
|
|
06-29-2013
|
1.00
|
Rudder Caps on!
|
Details
|
|
|
06-29-2013
|
4.00
|
Installing the bottom and top rudder caps
|
Details
|
|
|
06-17-2013
|
3.00
|
Tail light mounting
|
Details
|
|
|
06-15-2013
|
3.00
|
Fabricating/mounting the tail light mounting brack
|
Details
|
|
|
06-14-2013
|
4.00
|
Fitting the rudder bottom cap
|
Details
|
|
|
02-21-2011
|
2.00
|
Trimming horizontal stab spar to clear elevator ho
|
Details
|
|
|
02-21-2011
|
2.00
|
Trimming horizontal stab end skins to clear the el
|
Details
|
|
|
02-21-2011
|
0.10
|
Tail feathers are done!
|
Details
|
|
|
02-21-2011
|
1.00
|
Drilling the elevator horns for the center bearing
|
Details
|
|
|
02-20-2011
|
2.00
|
Rolling the elevators' leading edges
|
Details
|
|
|
02-20-2011
|
1.00
|
Installing the elevator bearing eye bolts
|
Details
|
|
|
02-19-2011
|
2.00
|
Stiffeners for the new left elevator
|
Details
|
|
|
02-19-2011
|
3.00
|
Riveting left elevator skin to skeleton
|
Details
|
|
|
02-19-2011
|
1.00
|
Installing the electric trim servo
|
Details
|
|
|
02-19-2011
|
2.00
|
Finishing the trim tab install
|
Details
|
|
|
02-19-2011
|
3.00
|
Elevator trim tab
|
Details
|
|
|
02-09-2011
|
2.00
|
Elevator Trim Tab partial assembly
|
Details
|
|
|
02-08-2011
|
2.00
|
Trim Tab assembly
|
Details
|
|
|
02-08-2011
|
2.00
|
Left elevator--riveting the skeleton, Part 1
|
Details
|
|
|
02-08-2011
|
2.00
|
Left elevator--riveting the skeleton Part 2
|
Details
|
|
|
02-07-2011
|
2.00
|
Left Elev: ribs for elevator trim slot
|
Details
|
|
|
02-07-2011
|
2.00
|
Elev Trim servo mount
|
Details
|
|
|
02-06-2011
|
2.00
|
Left Elevator: Skin fold for trim tab...FAIL
|
Details
|
|
|
02-05-2011
|
2.00
|
Left elevator: Match drill and dimple the skeleton
|
Details
|
|
|
02-05-2011
|
2.00
|
Left elevator skeleton
|
Details
|
|
|
02-02-2011
|
2.00
|
Riveting right elevator skeleton
|
Details
|
|
|
02-02-2011
|
2.00
|
Right Elevator: riveted elevator horn and skin to
|
Details
|
|
|
01-30-2011
|
2.00
|
Skeleton assembly continued
|
Details
|
|
|
01-30-2011
|
2.00
|
Riveting stiffeners to elevator skins
|
Details
|
|
|
01-30-2011
|
1.00
|
Riveting elevator trim access panel to skin
|
Details
|
|
|
01-30-2011
|
1.00
|
Bending the elevators' skin trailing edges
|
Details
|
|
|
01-30-2011
|
2.00
|
Assembling right elevator skeleton
|
Details
|
|
|
01-22-2011
|
1.00
|
Elevator trim access panel
|
Details
|
|
|
01-22-2011
|
3.00
|
Dimpling and priming stiffeners and skins
|
Details
|
|
|
01-20-2011
|
2.00
|
Rolling the leading edge
|
Details
|
|
|
01-20-2011
|
2.00
|
Riveting the rudder trailing edge
|
Details
|
|
|
01-20-2011
|
1.00
|
Rivet the leading edge
|
Details
|
|
|
01-19-2011
|
2.00
|
Sand and shape the stiffeners
|
Details
|
|
|
01-19-2011
|
2.00
|
Elevator Skin Stiffeners
|
Details
|
|
|
01-16-2011
|
2.00
|
ProSealing the trailing edge
|
Details
|
|
|
01-15-2011
|
3.00
|
Riveting the skins to the skeleton
|
Details
|
|
|
01-15-2011
|
2.00
|
Riveting the rudder skeleton pieces to spar
|
Details
|
|
|
01-15-2011
|
1.00
|
Riveting reinforcement plates and nut plates to sp
|
|
|
|
01-15-2011
|
1.00
|
Prepping the trailing edge
|
Details
|
|
|
01-15-2011
|
2.00
|
Finishing the rudder horn assembly
|
Details
|
|
|
01-14-2011
|
3.00
|
Acid wash and Prime
|
Details
|
|
|
01-12-2011
|
1.00
|
Rudder counter-weight rib
|
Details
|
|
|
01-12-2011
|
3.00
|
Dimpling and deburring
|
Details
|
|
|
01-11-2011
|
2.00
|
Match-drilling the rudder horn cover
|
Details
|
|
|
01-11-2011
|
2.00
|
Fabricating the bottom cap mounting strip
|
Details
|
|
|
01-09-2011
|
1.00
|
upper skeleton
|
Details
|
|
|
01-09-2011
|
2.00
|
Drilling and attaching skins
|
Details
|
|
|
01-09-2011
|
2.00
|
Back-riveting the stiffiners to the rudder skins (
|
Details
|
|
|
01-09-2011
|
1.00
|
Back-riveting the stiffiners to the rudder skins
|
Details
|
|
|
01-09-2011
|
2.00
|
Assembling the lower rudder skeleton
|
Details
|
|
|
01-08-2011
|
1.00
|
Priming the stiffiners and skins
|
Details
|
|
|
01-08-2011
|
2.00
|
Dimpling the rudder stiffiners and skins
|
Details
|
|
|
01-08-2011
|
4.00
|
Deburring the rudder skin and stiffiner holes
|
Details
|
|
|
01-05-2011
|
2.00
|
Stiffiners, final length check, cleco to skins
|
Details
|
|
|
01-04-2011
|
2.00
|
Trimming the stiffiners
|
Details
|
|
|
12-12-2010
|
2.00
|
Riveting the aft spar into the vert stab
|
Details
|
|
|
12-12-2010
|
1.00
|
Riveting skins to forward spar and skeleton
|
Details
|
|
|
12-12-2010
|
4.00
|
Riveting aft spar to spar doubler
|
Details
|
|
|
12-12-2010
|
1.00
|
Finishing the aft spar
|
Details
|
|
|
12-12-2010
|
1.00
|
Final 3 rivets....done!
|
Details
|
|
|
12-12-2010
|
1.00
|
Cleco the skins to forward skeleton
|
Details
|
|
|
12-12-2010
|
1.00
|
assembling the skeleton to forward spar
|
Details
|
|
|
12-05-2010
|
3.00
|
Acid Wash and Prime
|
Details
|
|
|
12-02-2010
|
3.00
|
Dimpling the ribs, spars, skins
|
Details
|
|
|
12-02-2010
|
1.00
|
Dimpling and countersinking the rear spar and doub
|
Details
|
|
|
11-30-2010
|
1.00
|
Hanging the skin and drilling
|
Details
|
|
|
11-30-2010
|
4.00
|
finishing the skeleton
|
Details
|
|
|
11-30-2010
|
1.00
|
Debur and start dimpling
|
Details
|
|
|
11-29-2010
|
2.00
|
Rear spar, doubler, and rudder hinge mounts
|
Details
|
|
|
11-29-2010
|
1.00
|
building the spar/rib skeleton
|
Details
|
|
|
11-28-2010
|
2.00
|
still skinning
|
Details
|
|
|
11-27-2010
|
1.00
|
Riveting the skins to the forward spar
|
Details
|
|
|
11-27-2010
|
1.00
|
Riveting the skins
|
Details
|
|
|
11-27-2010
|
7.00
|
Riveting ribs to the skin
|
Details
|
|
|
11-27-2010
|
1.00
|
Rivet the horiz stab end ribs
|
Details
|
|
|
11-26-2010
|
1.00
|
rivet the horizontal stab aft spar
|
Details
|
|
|
11-26-2010
|
1.00
|
rivet elevator bearing mounts to the rear spar
|
Details
|
|
|
11-26-2010
|
4.00
|
Rebuilding rear spar
|
Details
|
|
|
11-26-2010
|
1.00
|
Reassemble horizontal stab front spar
|
Details
|
|
|
11-26-2010
|
1.00
|
hanging the ribs
|
Details
|
|
|
11-23-2010
|
2.00
|
Horiz Stab: Acid wash prep for prime
|
Details
|
|
|
11-23-2010
|
2.00
|
Horiz Stab skin edge prep
|
Details
|
|
|
11-22-2010
|
2.00
|
Dimpling Horiz Stab skins part deux
|
Details
|
|
|
11-21-2010
|
2.00
|
Dimpling the Horiz Stab Skin, part one
|
Details
|
|
|
11-21-2010
|
2.00
|
Debur, Dimple Horiz Stab skeleton
|
Details
|
|
|
11-12-2010
|
1.00
|
Problem with Horiz Stab front spar
|
Details
|
|
|
11-11-2010
|
1.00
|
The big 4-thick drill!
|
Details
|
|
|
11-11-2010
|
1.00
|
horiz. stab skins
|
Details
|
|
|
11-11-2010
|
1.00
|
Horiz Stab--Disassembly and final front spar holes
|
Details
|
|
|
11-11-2010
|
1.00
|
horiz stab inboard ribs placement
|
Details
|
|
|
11-11-2010
|
1.00
|
drilling & attaching the horiz stab skins to the i
|
Details
|
|
|
11-11-2010
|
6.00
|
Assembling the horiz stab skeleton
|
Details
|
|
|
11-09-2010
|
1.00
|
Prepping the horiz stab ribs
|
Details
|
|
|
11-09-2010
|
1.50
|
Predrilling horiz stab inboard ribs
|
Details
|
|
|
11-09-2010
|
1.00
|
Notching the fwd inboard horiz stab ribs
|
Details
|
|
|
11-09-2010
|
1.00
|
Horizontal stab
|
Details
|
|
|
11-09-2010
|
1.00
|
Finishing horiz stab front spar
|
Details
|
|
|
11-08-2010
|
1.00
|
Tapering the Hor Stab front spar angle pieces' end
|
Details
|
|
|
11-08-2010
|
1.00
|
Rounding, tapering the Horiz Stab front spar angle
|
Details
|
|
|
11-08-2010
|
1.00
|
Hor. Stab front spar/angle pieces
|
Details
|
|
|
11-08-2010
|
3.00
|
Front spar channels
|
Details
|
|
|
11-08-2010
|
2.00
|
Finishing elev bearing assembly
|
Details
|
|
|
11-08-2010
|
1.00
|
Drawing the template for Horiz Stab front spar ang
|
Details
|
|
|
11-07-2010
|
2.00
|
Work has officially begun!
|
Details
|
|
|
11-07-2010
|
2.00
|
Positioning & match-drilling the elevator hinge br
|
Details
|
|
|
11-07-2010
|
2.00
|
Match-drill elevator rear spars to spar channel
|
Details
|
|
|
11-07-2010
|
2.00
|
Elevator bearing bracket assembly, priming
|
Details
|
|
|
10-25-2010
|
2.00
|
Sorting the bits and pieces
|
Details
|
|
|
10-25-2010
|
2.00
|
Empennage Delivered!
|
Details
|
|