KitLog pro

Powered By Kitlog Pro v2.0

Sid & Houston Mayeux Project
Work Logs Found: 138
Category Work Time: 279 Hours
 Date
Hours
Work Log Summary

Details

 02-28-2014
3.00
SB 14-01-31 part 8, reinstalling the empennage
Details
       

 02-26-2014
4.00
SB 14-01-31 part 7, match-drilling and riveting th
Details
       

 02-26-2014
2.00
SB 14-01-31 part 6, fabricating the main rib forwa
Details
       

 02-25-2014
3.00
SB 14-01-31 part 5, riveting doublers to the forwa
Details
       

 02-25-2014
3.00
SB 14-01-31 part 4, positioning the spar doublers
Details
       

 02-25-2014
2.00
SB 14-01-31 part 3, main rib forward flange remova
Details
       

 02-24-2014
2.00
SB 14-01-31 part 2, removing forward spar angles
Details
       

 02-21-2014
4.00
SB 14-01-31 part 1
Details
       

 10-31-2013
2.00
Install rudder cable outlet covers
Details
       

 10-29-2013
4.00
Installing the empennage fairing
Details
       

 10-23-2013
3.00
Horizontal stab end caps: Filling, final install
Details
       

 10-15-2013
2.00
Elevator/push tube connections
Details
       

 10-12-2013
2.00
Bolted the Rudder into place!
Details
       

 10-08-2013
2.00
Horizontal Stabilizer end caps
Details
       

 10-08-2013
2.00
Balancing the elevators
Details
     

 10-03-2013
2.00
Installing/connecting the elevator trim servo
Details
       

 10-03-2013
3.00
Bolting on the elevator
Details
       

 08-20-2013
3.00
Installing the horizontal/vertical stabilizers
Details
       

 08-15-2013
3.00
Empennage fairing, part 1
Details
       

 08-14-2013
3.00
Vertical Stab Top Cap part 2
Details
       

 08-14-2013
3.00
Empennage fairing, part 1
Details
       

 07-20-2013
2.00
Elevator end caps, part 2
Details
       

 07-20-2013
3.00
Elevator end caps
Details
       

 07-19-2013
3.00
Vertical Stab Top Cap
Details
       

 06-29-2013
1.00
Rudder Caps on!
Details
       

 06-29-2013
4.00
Installing the bottom and top rudder caps
Details
       

 06-17-2013
3.00
Tail light mounting
Details
       

 06-15-2013
3.00
Fabricating/mounting the tail light mounting brack
Details
       

 06-14-2013
4.00
Fitting the rudder bottom cap
Details
       

 02-21-2011
2.00
Trimming horizontal stab spar to clear elevator ho
Details
       

 02-21-2011
2.00
Trimming horizontal stab end skins to clear the el
Details
       

 02-21-2011
0.10
Tail feathers are done!
Details
     

 02-21-2011
1.00
Drilling the elevator horns for the center bearing
Details
       

 02-20-2011
2.00
Rolling the elevators' leading edges
Details
       

 02-20-2011
1.00
Installing the elevator bearing eye bolts
Details
     

 02-19-2011
2.00
Stiffeners for the new left elevator
Details
       

 02-19-2011
3.00
Riveting left elevator skin to skeleton
Details
       

 02-19-2011
1.00
Installing the electric trim servo
Details
       

 02-19-2011
2.00
Finishing the trim tab install
Details
       

 02-19-2011
3.00
Elevator trim tab
Details
       

 02-09-2011
2.00
Elevator Trim Tab partial assembly
Details
       

 02-08-2011
2.00
Trim Tab assembly
Details
       

 02-08-2011
2.00
Left elevator--riveting the skeleton, Part 1
Details
       

 02-08-2011
2.00
Left elevator--riveting the skeleton Part 2
Details
       

 02-07-2011
2.00
Left Elev: ribs for elevator trim slot
Details
       

 02-07-2011
2.00
Elev Trim servo mount
Details
       

 02-06-2011
2.00
Left Elevator: Skin fold for trim tab...FAIL
Details
       

 02-05-2011
2.00
Left elevator: Match drill and dimple the skeleton
Details
       

 02-05-2011
2.00
Left elevator skeleton
Details
       

 02-02-2011
2.00
Riveting right elevator skeleton
Details
       

 02-02-2011
2.00
Right Elevator: riveted elevator horn and skin to
Details
       

 01-30-2011
2.00
Skeleton assembly continued
Details
       

 01-30-2011
2.00
Riveting stiffeners to elevator skins
Details
       

 01-30-2011
1.00
Riveting elevator trim access panel to skin
Details
       

 01-30-2011
1.00
Bending the elevators' skin trailing edges
Details
       

 01-30-2011
2.00
Assembling right elevator skeleton
Details
       

 01-22-2011
1.00
Elevator trim access panel
Details
       

 01-22-2011
3.00
Dimpling and priming stiffeners and skins
Details
       

 01-20-2011
2.00
Rolling the leading edge
Details
       

 01-20-2011
2.00
Riveting the rudder trailing edge
Details
       

 01-20-2011
1.00
Rivet the leading edge
Details
       

 01-19-2011
2.00
Sand and shape the stiffeners
Details
       

 01-19-2011
2.00
Elevator Skin Stiffeners
Details
       

 01-16-2011
2.00
ProSealing the trailing edge
Details
       

 01-15-2011
3.00
Riveting the skins to the skeleton
Details
       

 01-15-2011
2.00
Riveting the rudder skeleton pieces to spar
Details
       

 01-15-2011
1.00
Riveting reinforcement plates and nut plates to sp
       

 01-15-2011
1.00
Prepping the trailing edge
Details
       

 01-15-2011
2.00
Finishing the rudder horn assembly
Details
       

 01-14-2011
3.00
Acid wash and Prime
Details
       

 01-12-2011
1.00
Rudder counter-weight rib
Details
       

 01-12-2011
3.00
Dimpling and deburring
Details
       

 01-11-2011
2.00
Match-drilling the rudder horn cover
Details
       

 01-11-2011
2.00
Fabricating the bottom cap mounting strip
Details
       

 01-09-2011
1.00
upper skeleton
Details
       

 01-09-2011
2.00
Drilling and attaching skins
Details
       

 01-09-2011
2.00
Back-riveting the stiffiners to the rudder skins (
Details
       

 01-09-2011
1.00
Back-riveting the stiffiners to the rudder skins
Details
       

 01-09-2011
2.00
Assembling the lower rudder skeleton
Details
       

 01-08-2011
1.00
Priming the stiffiners and skins
Details
       

 01-08-2011
2.00
Dimpling the rudder stiffiners and skins
Details
       

 01-08-2011
4.00
Deburring the rudder skin and stiffiner holes
Details
       

 01-05-2011
2.00
Stiffiners, final length check, cleco to skins
Details
       

 01-04-2011
2.00
Trimming the stiffiners
Details
       

 12-12-2010
2.00
Riveting the aft spar into the vert stab
Details
       

 12-12-2010
1.00
Riveting skins to forward spar and skeleton
Details
       

 12-12-2010
4.00
Riveting aft spar to spar doubler
Details
       

 12-12-2010
1.00
Finishing the aft spar
Details
       

 12-12-2010
1.00
Final 3 rivets....done!
Details
       

 12-12-2010
1.00
Cleco the skins to forward skeleton
Details
       

 12-12-2010
1.00
assembling the skeleton to forward spar
Details
       

 12-05-2010
3.00
Acid Wash and Prime
Details
       

 12-02-2010
3.00
Dimpling the ribs, spars, skins
Details
       

 12-02-2010
1.00
Dimpling and countersinking the rear spar and doub
Details
       

 11-30-2010
1.00
Hanging the skin and drilling
Details
       

 11-30-2010
4.00
finishing the skeleton
Details
       

 11-30-2010
1.00
Debur and start dimpling
Details
       

 11-29-2010
2.00
Rear spar, doubler, and rudder hinge mounts
Details
       

 11-29-2010
1.00
building the spar/rib skeleton
Details
       

 11-28-2010
2.00
still skinning
Details
       

 11-27-2010
1.00
Riveting the skins to the forward spar
Details
       

 11-27-2010
1.00
Riveting the skins
Details
       

 11-27-2010
7.00
Riveting ribs to the skin
Details
       

 11-27-2010
1.00
Rivet the horiz stab end ribs
Details
       

 11-26-2010
1.00
rivet the horizontal stab aft spar
Details
       

 11-26-2010
1.00
rivet elevator bearing mounts to the rear spar
Details
       

 11-26-2010
4.00
Rebuilding rear spar
Details
       

 11-26-2010
1.00
Reassemble horizontal stab front spar
Details
       

 11-26-2010
1.00
hanging the ribs
Details
       

 11-23-2010
2.00
Horiz Stab: Acid wash prep for prime
Details
       

 11-23-2010
2.00
Horiz Stab skin edge prep
Details
       

 11-22-2010
2.00
Dimpling Horiz Stab skins part deux
Details
       

 11-21-2010
2.00
Dimpling the Horiz Stab Skin, part one
Details
       

 11-21-2010
2.00
Debur, Dimple Horiz Stab skeleton
Details
       

 11-12-2010
1.00
Problem with Horiz Stab front spar
Details
       

 11-11-2010
1.00
The big 4-thick drill!
Details
       

 11-11-2010
1.00
horiz. stab skins
Details
       

 11-11-2010
1.00
Horiz Stab--Disassembly and final front spar holes
Details
     

 11-11-2010
1.00
horiz stab inboard ribs placement
Details
       

 11-11-2010
1.00
drilling & attaching the horiz stab skins to the i
Details
       

 11-11-2010
6.00
Assembling the horiz stab skeleton
Details
       

 11-09-2010
1.00
Prepping the horiz stab ribs
Details
       

 11-09-2010
1.50
Predrilling horiz stab inboard ribs
Details
       

 11-09-2010
1.00
Notching the fwd inboard horiz stab ribs
Details
       

 11-09-2010
1.00
Horizontal stab
Details
     

 11-09-2010
1.00
Finishing horiz stab front spar
Details
       

 11-08-2010
1.00
Tapering the Hor Stab front spar angle pieces' end
Details
       

 11-08-2010
1.00
Rounding, tapering the Horiz Stab front spar angle
Details
       

 11-08-2010
1.00
Hor. Stab front spar/angle pieces
Details
       

 11-08-2010
3.00
Front spar channels
Details
       

 11-08-2010
2.00
Finishing elev bearing assembly
Details
       

 11-08-2010
1.00
Drawing the template for Horiz Stab front spar ang
Details
     

 11-07-2010
2.00
Work has officially begun!
Details
       

 11-07-2010
2.00
Positioning & match-drilling the elevator hinge br
Details
       

 11-07-2010
2.00
Match-drill elevator rear spars to spar channel
Details
       

 11-07-2010
2.00
Elevator bearing bracket assembly, priming
Details
       

 10-25-2010
2.00
Sorting the bits and pieces
Details
       

 10-25-2010
2.00
Empennage Delivered!
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.