Date
|
Hours
|
Work Log Summary

|
Details

|
12-11-2010
|
6.00
|
Wheel Fairing Painting and Sanding UV Smooth Prime
|
Details
|
|
|
11-29-2010
|
1.50
|
ASN737TW-66 hose clamp and S.S. Screws
|
Details
|
  |
|
11-28-2010
|
3.00
|
U-1018C Nose Gear Leg Hinge and the U-1018A Nose
|
Details
|
  |
|
11-27-2010
|
2.00
|
I Cut-out template on the U-1018A Nose Gear Leg Fa
|
Details
|
|
|
11-26-2010
|
2.00
|
wo U-1013A and B Wheel Fairings together and using
|
Details
|
 |
|
11-24-2010
|
3.00
|
I checked the alignment of the U-1013 with the flo
|
Details
|
 |
|
11-20-2010
|
10.00
|
Adding a inspevtion door to the Wheel Fairings
|
Details
|
|
|
11-15-2010
|
6.00
|
U-1020 L/R and the U-1019 L/R Gear Leg Fairings
|
Details
|
|
|
11-14-2010
|
4.00
|
X-10 I measured 27 inches from the aircraft center
|
Details
|
|
|
11-14-2010
|
1.00
|
U-1013C-L/R Nose Wheel Fairing Brackets.
|
Details
|
  |
|
11-13-2010
|
2.00
|
U-1013B Wheel Fairing Rear upside down and in the
|
Details
|
  |
|
11-12-2010
|
2.00
|
ront and Rear Wheel Fairings U-1013A and U1013B
|
Details
|
  |
|
11-07-2010
|
3.00
|
U-1017B Gear Leg Fairing Hinge
|
Details
|
|
|
11-06-2010
|
2.00
|
U-1017A Gear Leg Fairing
|
Details
|
|
|
11-03-2010
|
5.00
|
Rear Wheel Fairing back into place and Nut Extens
|
Details
|
  |
|
10-31-2010
|
8.00
|
U-1057B L/R Rear Wheel Fairing with Epoxy/Flox
|
Details
|
|
|
10-30-2010
|
4.00
|
U-1057B L/R Wheel Fairing Rear over the tire and s
|
Details
|
  |
|
10-23-2010
|
3.00
|
U-1057 Wheel Fairing A and B Left and Right.
|
Details
|
  |