KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 18
Category Work Time: 68 Hours
 Date
Hours
Work Log Summary

Details

 12-11-2010
6.00
Wheel Fairing Painting and Sanding UV Smooth Prime
Details
       

 11-29-2010
1.50
ASN737TW-66 hose clamp and S.S. Screws
Details

 11-28-2010
3.00
U-1018C Nose Gear Leg Hinge and the U-1018A Nose
Details

 11-27-2010
2.00
I Cut-out template on the U-1018A Nose Gear Leg Fa
Details
       

 11-26-2010
2.00
wo U-1013A and B Wheel Fairings together and using
Details
     

 11-24-2010
3.00
I checked the alignment of the U-1013 with the flo
Details
     

 11-20-2010
10.00
Adding a inspevtion door to the Wheel Fairings
Details
       

 11-15-2010
6.00
U-1020 L/R and the U-1019 L/R Gear Leg Fairings
Details
       

 11-14-2010
4.00
X-10 I measured 27 inches from the aircraft center
Details
       

 11-14-2010
1.00
U-1013C-L/R Nose Wheel Fairing Brackets.
Details

 11-13-2010
2.00
U-1013B Wheel Fairing Rear upside down and in the
Details

 11-12-2010
2.00
ront and Rear Wheel Fairings U-1013A and U1013B
Details

 11-07-2010
3.00
U-1017B Gear Leg Fairing Hinge
Details
       

 11-06-2010
2.00
U-1017A Gear Leg Fairing
Details
       

 11-03-2010
5.00
Rear Wheel Fairing back into place and Nut Extens
Details

 10-31-2010
8.00
U-1057B L/R Rear Wheel Fairing with Epoxy/Flox
Details
       

 10-30-2010
4.00
U-1057B L/R Wheel Fairing Rear over the tire and s
Details

 10-23-2010
3.00
U-1057 Wheel Fairing A and B Left and Right.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.