Powered By Kitlog Pro v2.0
Michael's RV-10 Build Log
RV-10
Horizontal Stab
Work Logs Found:
12
Category Work Time:
31 Hours
Date
Hours
Work Log Summary
Details
04-24-2005
4.50
*HORIZONTAL STABILIZER COMPLETE*
04-22-2005
2.25
Riveting HS together
04-21-2005
2.50
Began riveting nose ribs to skin
04-03-2005
8.00
Finished preparing Skins and Skeleton
Details
04-02-2005
1.50
Final drilled, deburred skins
03-28-2005
0.50
Final drilled nose ribs to skin
03-27-2005
3.25
Inspar and Nose Ribs prep
Details
03-27-2005
2.50
Clecoed Skin to Skeleton
03-23-2005
1.25
Riveted front and rear spars.
03-23-2005
1.30
Prepped and alodined spars and associated parts
03-22-2005
2.50
Drilled, deburred, prep on front spar
03-22-2005
1.25
Drilled rear spar, doubler, and hinges.
SITE NAVIGATION
RV-10 Home
Category
# Logs
# Hours
All
510
2143
Ailerons
10
22
Avionics/Instruments
17
181
Avionics/Wire
17
181
Cowl
17
271
Elevators
12
50
Empennage Assembly
4
18
Engine
13
92
Fairings
16
114
Flaps
10
24
Fuel Tanks
16
46
Fuselage
187
530
Hat Shelf
8
16
Horizontal Stab
12
31
Interior
4
17
Inventory
11
24
Lighting
8
55
Lighting/Electrical
8
55
Miscellaneous
37
150
Paint
14
23
Prop
1
4
Rudder
10
18
Systems
12
29
Tail Cone
16
49
Vertical Stabilizer
8
16
Wing Leading Edge
8
27
Wing Ribs
4
18
Wing Skins
17
46
Wing Spars
5
25
Wings Assembly
8
11
Copyright © 2001-2024 Matronics. All Rights Reserved.