KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site
Work Logs Found: 19
Category Work Time: 63 Hours
 Date
Hours
Work Log Summary

Details

 06-29-2017
5.00
Installed the tail horizontal tail tips.
Details
       

 03-31-2011
1.00
Remake Elevator Trim.
Details
       

 06-22-2010
5.00
Repair fiberglass tail tip.
Details
       

 06-21-2010
3.00
Cut and install fiberglassTail Tips.
Details

 06-17-2010
5.00
Cleaned and deburred all Horizontal Stab parts.Cle
Details
       

 06-09-2010
3.00
Updrill Horizontal Stab & hindges
Details
       

 06-08-2010
3.00
Pilot drill Ribs from Pilot Holes in skin.
Details
       

 06-04-2010
3.00
Pilot Drilled,Clecoed and Riveted Forward and Main
Details
       

 05-24-2010
1.00
Primed forward and Main Horizontal spar.
Details

 05-19-2010
3.00
Position ribs with main and fwd spars.
Details
       

 05-18-2010
5.00
Made 12 Horozontal Stab Ribs
Details

 05-13-2010
5.00
Deburred Main Spar and started FWD Spar.
Details

 05-12-2010
4.00
Cut the Horozontal Main Spar and clecoed.
Details
       

 04-25-2010
6.00
Clecoed Elevator fixed and riveted.
Details
       

 04-24-2010
2.00
Final fit Elevator Skins and Ribs.
Details

 04-22-2010
2.00
Cut both Elevator Skins.
Details

 04-15-2010
1.00
Pilot drilled Elevator Horn.
Details

 04-14-2010
4.00
Cut Elevator Skins. Made ribs and deburred fwd spa
Details
     

 04-13-2010
2.00
Build Trim Tab Assembly
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.