Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
Canopy
Work Logs Found:
334
Category Work Time:
544 Hours
Date
Hours
Work Log Summary
Details
06-15-2013
1.00
Cleaned off Duct Tape-Photos-Rudder,Hangar
Details
05-06-2013
1.00
Removed Lock on Canopy
Details
04-13-2013
6.00
Sanded Windshield Fairing
Details
04-11-2013
3.00
Sanded Windshield Fairing
Details
01-14-2013
0.50
Found Unglued Spots of Windshield Fairing
Details
10-04-2012
3.50
Sanded Patches on Windshield Fairing
Details
09-28-2012
0.50
Glued Patches on Windshield Fairing
Details
09-22-2012
2.00
Riveted Fairing onto Canopy
Details
09-22-2012
2.00
Assisted with Riveting Fairing to Canopy
Details
09-21-2012
1.00
Sanded Windshield Fairing
Details
09-20-2012
2.00
Painted Canopy Fairing
Details
08-30-2012
4.50
Trimmed/Sanded New Roll Bar Fairing
Details
08-30-2012
2.00
Applied Primer Filler on Canopy Fairing
Details
08-29-2012
2.00
Sanded New Fairing over Roll Bar
Details
08-29-2012
2.00
Sanded New Fairing
Details
08-29-2012
2.00
Photos-New Glass on Windshield Fairing
08-24-2012
2.00
Taped Canopy in Preparation of Glassing
Details
08-24-2012
1.00
Photos-Sides of New Windshield Fairing
08-24-2012
1.00
Laid down Fiberglass on Windshield Fairing
Details
08-24-2012
1.00
Cutting Fiberglass for Windshield Fairing
Details
08-23-2012
2.50
Trimmed Fairing by Roll Bar-Photos of Gary
Details
08-23-2012
2.50
Photos-Fairing Trimmed Back to Roll Bar
08-23-2012
2.50
Applied More Filler Primer to Canopy Fairing
Details
08-22-2012
1.50
Retaped Windshield
Details
08-22-2012
1.00
Fairing Obstructions
Details
08-21-2012
2.00
Windshield Fairing-Interference Closing Canopy
Details
08-21-2012
1.00
Removed Clamps/Straps from Windshield Fairing
Details
08-21-2012
2.00
Photos-Fairing after gluing
08-20-2012
0.50
Primer Filling to Canopy Fairing
Details
08-20-2012
3.00
Glued Windshield Fairing in Place
Details
08-20-2012
2.50
Dimpled Remainder of Screw Holes for Roll Servo
Details
08-20-2012
2.00
Assisted with Gluing Windshield Fairing
Details
08-20-2012
2.50
Assisted with Gluing Fairing to Windshield
Details
08-14-2012
1.50
Primed Underside of Canopy Fairing
Details
08-13-2012
0.50
Sanded Left Side of Windshield and Fairing
Details
08-12-2012
2.50
Riveted Remaining Side Panels/Screws
Details
08-12-2012
1.00
Applied Filler to Canopy Fairing
Details
08-11-2012
2.00
Riveted Canopy Together
Details
08-11-2012
1.00
Left Side Panel Riveted
Details
08-11-2012
1.00
Canopy Removed/Side Panels Riveted
Details
08-10-2012
1.50
Trimmed Canopy Center Cover Strip
Details
08-04-2012
1.00
Countersunk Canopy Rivet Holes
Details
07-08-2012
1.00
Sanded SuperFil on Canopy
Details
07-08-2012
1.00
Photo-SuperFil Sanded on Right Side
07-08-2012
1.00
Applied SuperFil to Fuselage/Windshield Juncture
Details
07-07-2012
1.00
Windshield Screwed in Place
Details
07-07-2012
0.50
Taped Fuselage /Placed Windshield
Details
07-07-2012
1.00
Painted Aft Edge of Windshield Fairing
Details
06-30-2012
0.30
Retapped Screw Hole in Roll Bar
Details
06-25-2012
0.50
Swapped Out Bolts on Roll Bar Handles
Details
06-25-2012
3.00
Sanded Windshield for Painting and Gluing
Details
06-25-2012
3.00
Sanded Windshield
Details
06-24-2012
2.00
Removed Windshield
Details
06-20-2012
0.50
Sanded Aft Edge of Canopy Fairing/Fuselage Skin
Details
06-19-2012
1.50
SuperFil Added to Canopy Fairing
Details
06-19-2012
1.50
Sanded SuperFil on Aft Canopy Fairing
Details
06-19-2012
1.00
Final Sanding of Edges of Windshield Fairing
Details
06-18-2012
3.50
Trimmed Roll Bar Edge of Windshield Fairing
Details
06-18-2012
1.00
Sanded and Added Flox to Windshield Fairing
Details
06-18-2012
2.50
Assisted with Trimming Windshield Fairing
Details
06-17-2012
1.00
Split Fairing over the Roll Bar and Glassed
Details
06-17-2012
0.30
Installed Tip-Up Canopy Support Rod on Bolt
Details
06-17-2012
1.20
Fairing/Handles Drilled to Canopy Side Skirts
Details
06-17-2012
0.50
Assisted with Shortening Windshield Fairing
Details
06-15-2012
1.50
Sanded Canopy Fairing
Details
06-12-2012
0.70
Sanded Micro on Canopy Fairing
Details
06-12-2012
2.50
Applied Primer Filler/Sanded Windshield Fairing
Details
06-11-2012
1.00
Spread Micro to Underside of Canopy Fairing
Details
06-09-2012
0.50
Photos of Canopy and Windshield
06-09-2012
0.50
Flox on the Canopy Fairing
Details
06-09-2012
0.50
Applied Flox on Fairing around Canopy Track
Details
06-08-2012
2.50
Sanded Aft Edge of Canopy Fairing
Details
06-07-2012
3.00
Sanded Canopy Fairing/Made Template over Fairing
Details
06-07-2012
1.00
Patched Underside of Windshield Fairing
Details
06-05-2012
1.00
Sanded Center Section Patch of Canopy Fairing
Details
06-05-2012
3.50
Determined Final Edges of Windshield Fairing
Details
06-05-2012
3.00
Applied Epoxy and Glass to Sides of Fairing
Details
06-04-2012
0.10
Patched Fairing/Placed Cowling on Engine
Details
06-04-2012
1.00
Added Patches to Canopy Fairing
Details
06-03-2012
2.50
Sanded Underside of Canopy Fairing
Details
06-02-2012
2.00
Canopy Fairing Sanded
Details
06-01-2012
1.00
Sanded Windshield and Canopy Fairings
Details
05-31-2012
1.00
Sanded Edges of Fairing/Added More Patches
Details
05-31-2012
1.00
Prepped the Fuselage under the Canopy Fairing
Details
05-30-2012
2.50
Sanded Glass Patches on Fairing
Details
05-27-2012
1.50
Sanded Fairing and Added Patches of Glass
Details
05-27-2012
1.50
More Patching of the Fairing
Details
05-27-2012
0.10
Added Glass on Inside of Left Intersection
Details
05-24-2012
1.00
Sanded Top of Fairing with Tube
Details
05-24-2012
2.50
Glassed Right Side
Details
05-24-2012
2.00
Began Sanding of Top of Fairing
Details
05-23-2012
1.50
Used Belt Sander to Remove Bondo
Details
05-23-2012
1.50
Sanded Underside of Fairing
Details
05-19-2012
1.00
Took Tape Off Fairing
Details
05-19-2012
1.00
Took Fairing off Fuselage
Details
05-19-2012
1.00
Attempted to Remove Bondo from Fairing
Details
05-18-2012
1.00
Windshield Fairing Laid up
Details
05-18-2012
1.00
Right Side of Fairing and Center
Details
05-18-2012
1.00
Began the Fairing Lay-up
Details
05-17-2012
1.00
Sorted Lengths of Fiberglass Cloth for Fairing
Details
05-06-2012
1.50
Cut Lengths of Fiberglass Cloth for Fairing
Details
05-05-2012
1.00
Taped/Clamped Roll Bar Faining in Place
Details
05-01-2012
2.00
Added Bondo to Fuselage/Sanded Fairing
Details
04-30-2012
1.00
Countersunk Right Side Screw Holes
Details
04-29-2012
2.00
Countersunk Windshield Screw Holes
Details
04-23-2012
1.00
Sanded Bondo on Fuselage/Windshield
Details
04-23-2012
1.00
Fairing on Roll Bar
Details
04-22-2012
1.00
Bondo Sanded and Reapplied
Details
04-22-2012
1.00
Applied Bondo to Front of Windshield Area
Details
04-19-2012
1.00
Taped Top Skin in Preparation of New Fairing
Details
04-19-2012
1.00
Split Windshield Fairing
Details
04-19-2012
0.50
Offered Suggestions for Working the Fairing
Details
04-19-2012
1.00
Checked Fit of Split Fairing
Details
04-18-2012
1.50
Windshield Fairing Line-up Marks
Details
04-18-2012
1.00
Nylon Washers Added to Windshield/Roll Bar
Details
04-18-2012
1.00
Leather Glareshield Cover
Details
04-18-2012
1.00
Initial Fit of Windshield Fairing
Details
04-18-2012
1.00
Finished Screwing Windshield to Roll Bar
Details
04-18-2012
1.00
Clips Holding Windshield Riveted to Top Skin
Details
04-18-2012
1.00
Assisted with Windshield Fairing Alignment
Details
04-17-2012
2.00
Screwed Windshield into Place/Fairing
Details
04-05-2011
2.00
Primed Aft Fairing after Sanding
Details
04-05-2011
0.10
Photos-Aft Fairing on the Fuselage
04-05-2011
0.10
Photos 2-Aft Fairing Interior with Closed Canopy
04-04-2011
1.50
Sanded Canopy Fairing
Details
04-04-2011
1.00
Applied SuperFil to Outside of Canopy Fairing
Details
04-03-2011
1.50
Applied SuperFil to Underside of Canopy Fairing
Details
03-24-2011
1.50
Cleaned and Taped Canopy
Details
03-23-2011
4.00
Trimmed Fairing to Final Shape
Details
03-23-2011
0.10
Photos-Aft Fairing Trimming
03-23-2011
0.10
Photos 4-Aft Fairing after Trimming
03-23-2011
0.10
Photos 3-Aft Fairing After Trimming
03-23-2011
0.10
Photos 2-Aft Fairing Trimming
03-22-2011
4.50
Sanded and Drilled Fairing to Canopy
Details
03-22-2011
0.10
Photos-Fairing Drilled to the Canopy
03-21-2011
3.00
Sanded Aft Fairing
Details
03-21-2011
0.10
Photos-Sanding the Aft Fairing Extension
03-19-2011
2.00
Lower Left Edge was Extended
Details
03-16-2011
1.00
More Sanding of the Fairing
Details
03-15-2011
1.50
Sharpie Lines Transferred to Fairing
Details
03-15-2011
0.50
Popped the Aft Fairing off the Tape
Details
03-15-2011
0.10
Photos-Fairing on the Aircraft
03-15-2011
0.10
Began the Sanding of the Fairing
Details
03-14-2011
0.10
Photos 3-Right and Center Areas of the Fairing
Details
03-14-2011
0.10
Photos 2-Aft Canopy Fairing
Details
03-14-2011
2.00
Made Fiberglass Fairings
Details
03-14-2011
4.50
Cut Out Fiberglass Strips for Canopy Aft Fairing
Details
03-14-2011
0.10
Cut Fairing Strips/Taped Cardboard onto Canopy
Details
03-10-2011
3.00
Made Right Cardboard Template for Fairing
Details
03-10-2011
0.10
Finished Right Template and Made Paper Copies
03-09-2011
1.50
Made Cardboard Template for Aft Canopy Fairing
Details
02-17-2011
2.00
Locked Down the Rear Pin Mount
Details
02-17-2011
0.10
Began to Shape Canopy Latch/Seated Flap Switch
Details
02-16-2011
0.10
Received Another Van's Order
Details
02-16-2011
3.50
Drilled New Rear Pin Mount Moving Inboard
Details
02-09-2011
2.00
Installed Tip-up Mod Stop
Details
02-08-2011
1.50
Evaluated Left Rear Pin Mount
Details
02-08-2011
1.00
Aft Edge of Canopy Sanded Some More
Details
02-03-2011
0.50
Touched Up the Canopy Anchor Block
Details
02-03-2011
1.00
Sanded Aft Top Edge of Canopy/Visitors
Details
02-01-2011
2.00
Shiny Spinner/Control Cable Bracket/Anchor Blocks
Details
02-01-2011
3.00
Screwed Side Skirts in Place
Details
02-01-2011
0.10
Right Side Skirt/Aft Fairing Template
Details
02-01-2011
0.10
Aft Fairing Templates/Gap on Left Side
Details
01-31-2011
0.50
Left Side Skirt Replaced/Cub Scouts Visit
Details
01-30-2011
0.50
Filed Front Edge of Left Canopy Skirt
Details
01-25-2011
0.10
Received the Windshield Fairing
Details
11-10-2010
0.10
Photos-Canopy Back on the Fuselage
11-10-2010
1.50
Clecoed Canopy Parts Together
Details
11-09-2010
4.50
Repainted Canopy Rail Supports
Details
11-09-2010
2.50
Assisted with Installing Canopy Roll Bar/Side Rail
Details
11-08-2010
0.10
Photos-Koger Shade Installed/Tip-up Mod
11-08-2010
0.10
Photos 3-Side Skirts Riveted to Frame
11-08-2010
0.10
Photos 2-Tip-Up Mod/Side Skirts
11-08-2010
4.00
Installed Canopy Handles/Assembled Canopy Rollers
Details
11-07-2010
0.20
Picked up Painted Canopy Pieces
Details
09-25-2010
5.00
Removed Side Rails and Roll Bar for Painting
Details
09-25-2010
0.10
Photos-Canopy Parts Removed to be Painted
09-24-2010
2.00
Removed/Disassembled Canopy for Painting
Details
09-22-2010
0.50
Windshield Holes/Firewall Recess
Details
09-21-2010
3.00
Drilled Roll Bar Holes for #8 Screws
Details
09-18-2010
0.10
Photos-Canopy Lock and Slots
09-18-2010
0.10
Photos 3-Canopy Lock
09-18-2010
0.10
Photos 2-Canopy Lock and Slots
09-18-2010
4.50
Completed Lock/Made Slots in Rail
Details
09-17-2010
0.10
Photo-Canopy Lock Construction
09-17-2010
4.00
Finished Assist Handles/Canopy Lock
Details
09-17-2010
0.10
Canopy Lock
09-10-2010
1.50
Upsized Holes for the Canopy Assist Handles
Details
09-09-2010
4.50
Riveted Roller Weldments/Made Tip-up Slots
Details
09-09-2010
0.10
Photos-Slots made for the Tip-up Stops
09-09-2010
0.10
Drilled Pilot Holes for Canopy Assist Handles
Details
09-08-2010
2.00
Prepared Canopy Roller Weldments for Riveting
Details
09-04-2010
0.30
Wiped ArmorAll on Inside of Canopy Rails
Details
09-03-2010
6.00
Trimmed Sides of Windshield/Drilled to Roll Bar
Details
09-03-2010
0.10
Photos-Drilled the Windshield to the Roll Bar
09-03-2010
0.10
Photos 2-Drilled the Windshield to the Roll Bar
09-03-2010
0.10
Photo 3-Drilled the Windshield to the Roll Bar
09-03-2010
1.00
Assisted with Trimming Windshield Sides
Details
09-02-2010
3.00
Filed Top Center Aft Edges of Windshield
Details
09-02-2010
1.00
Assisted with Aligning Windshield and Trimming
Details
09-01-2010
4.50
Sanded Windshield Edge/Roller Weldment
Details
09-01-2010
0.10
Photo-Canopy Assist Handle
08-26-2010
0.10
Photos-Mod Support Rod/Tip-Up Canopy
08-26-2010
0.10
Photos 2-Tip-up Support Arm/Canopy Tipped Up
08-26-2010
5.00
Countersunk Side Rails/Frame Drilled to Weldments
Details
08-25-2010
0.10
Photos-Canopy Handles/Screw in Canopy
08-25-2010
3.00
Drilled Canopy Support Bracket to Frame
Details
08-24-2010
1.50
Drilled Tip-Up Support Bracket to Frame
Details
08-19-2010
1.00
Installed Canopy Support Bracket
Details
08-18-2010
0.30
Reversed Screws in Canopy Rollers
Details
08-18-2010
2.00
Made Tip-Up Support Strut/Bracket
Details
08-17-2010
0.10
Photos-Canopy Latch-Inside and Exterior
08-17-2010
2.50
Drilled/Tapped Canopy Latch/Cut Inside Latch
Details
08-11-2010
2.00
Finished Koger Sunshade/Tapped Canopy Latch
Details
08-10-2010
2.00
Installed Koger Sunshade/Cleaned Roller Tracks
Details
08-08-2010
0.10
Shop Visitors-Jerry Wang and Friends
Details
08-01-2010
0.10
Shop Visitors-Craig Winglovitz, Brian
Details
07-20-2010
2.50
Canopy
07-19-2010
2.00
Canopy
Details
07-18-2010
2.50
Trimmed Canopy Skirts
Details
07-10-2010
1.50
Work on Canopy Skirts
Details
07-09-2010
6.00
Call to Van's/Work on Canopy Screw Holes
Details
07-08-2010
4.00
Drilled Left Canopy Skirt thru Canopy/Inside Skirt
Details
07-06-2010
2.00
Drilled the Left Canopy Skirt in Place
Details
07-01-2010
0.10
Photos-Right Canopy Skirt Drilled in Place
07-01-2010
0.10
Photos 2-Notched Inside Skirt Braces/Add'l Hole in
07-01-2010
4.50
More Drilling thru the Canopy and Frame
Details
06-30-2010
3.50
Drilled Pilot Holes in C-791 Canopy Skirt Brace
Details
06-29-2010
0.10
Photos-Drilled Right Canopy Skirt to Bow
06-29-2010
3.50
Drilled Inside Canopy Skirts
Details
06-28-2010
3.00
Drilled Left Side Skirt
Details
06-23-2010
4.50
Trimmed Front Canopy Bow
Details
06-23-2010
3.00
Made Canopy Clips for Windscreen/Photos-Canopy
Details
06-22-2010
2.50
Drilled Left Side Skirt/Shortened Tube/C'sunk Hole
Details
06-21-2010
3.00
Worked on C-759 Side Skirts
Details
06-21-2010
4.50
Drilled Canopy Latch Hole/Trimmed Latch Tube
Details
06-18-2010
0.10
Photos-Center Cover Strip Drilled to Canopy
06-18-2010
3.00
Drilled Canopy Cover Strip/Deburred Holes
Details
06-17-2010
0.10
Photos-Finished drilling the canopy to the frame
06-17-2010
0.10
Photos 3-Drilled Holes in the Canopy Frame
06-17-2010
0.10
Photos 2-Tip-up Position/Trim Sides
06-17-2010
3.50
Finished Drilling Canopy to Canopy Bows
Details
06-16-2010
0.10
Photos-Drilling the Canopy to the Frame
06-16-2010
0.10
Photos 3-Drilling the Canopy to the Frame
06-16-2010
0.10
Photos 2-Drilling the Canopy to the Frame
06-16-2010
6.00
Drilled Canopy and Frame for Riveting
Details
06-11-2010
1.00
Marked Leading Edge of Canopy for Holes
Details
06-10-2010
3.00
Polished Sides/Checked Side Skirts on Canopy
Details
06-09-2010
4.50
Polished the Big Cut/Trimmed More off Sides
Details
06-09-2010
0.10
Photos-Canopy Trimming
06-09-2010
0.10
Photos 2-More Canopy Trimming
06-03-2010
0.10
Photos-After the Big Cut
06-03-2010
2.50
Made the Big Cut!
Details
06-03-2010
0.30
Assisted with the Big Cut
Details
06-02-2010
4.00
Trimmed More Material off the Front Canopy
Details
06-02-2010
2.00
Practiced Drilling with Plexiglass Bits
Details
06-01-2010
6.00
Trimmed More Material off the Front
Details
06-01-2010
0.10
Photos-Trimmed More Material off the Front
06-01-2010
0.10
Photos 3-Sanding out a crack in an Edge
Details
06-01-2010
0.10
Photos 2-Me Trimming
05-31-2010
1.00
Sanded Edges and Checked Heights of Canopy
Details
05-31-2010
0.10
Photos-Canopy Trimming
05-31-2010
0.10
Photos 2-Canopy Trimming
05-28-2010
0.10
Photos-Canopy Trimming
05-28-2010
0.10
Photos 5-Canopy Trimming
05-28-2010
0.10
Photos 4-Canopy Trimming and Sandpaper
05-28-2010
0.10
Photos 3-Canopy Trimming
05-28-2010
0.10
Photos 2-Canopy Trimming
05-28-2010
3.50
Canopy Trimming
Details
05-27-2010
4.50
Made First Cuts of Perimeter of Canopy
Details
05-26-2010
5.00
Started Work on Canopy/1st Trimming of Canopy
Details
05-26-2010
1.00
Helped Find Centerline of Canopy
Details
05-25-2010
0.70
Picked Up Canopy from Dad's
Details
05-25-2010
0.10
Photos-Modified Aft Canopy Rail
05-25-2010
0.10
Photos 3-Aft Rail and Frame
05-25-2010
0.10
Photos 2-Canopy Frame in the Tip-Up Mod
05-25-2010
5.00
Drilled Canopy Weldments/Trimmed Aft Rail
Details
05-19-2010
0.10
Photos-Right Canopy Weldment
05-19-2010
4.00
Modified Canopy Frame for Meske Tip-Up Mod
Details
05-19-2010
3.00
Assisted with the Canopy Frame Mods
Details
05-18-2010
3.00
Tip-up Mod Components Install/Drilled Anchor Block
Details
05-18-2010
2.00
Measured Canopy Latch Tube for Cutting/Photos
Details
05-17-2010
2.00
Reinstalled SL-30 & EMS-120
Details
04-20-2010
2.50
Positioned and Drilled the Rear Anchor Blocks
Details
04-18-2010
2.50
Checked Cracked Paint in Aft Corners of Frame
Details
04-17-2010
0.10
Photos-Canopy Frame Bending
04-17-2010
0.10
Photos 3-Checking Canopy Frame Positioning
04-17-2010
0.10
Photos 2-Checking Canopy Frame Positioning
04-17-2010
5.00
Finished Bending the Canopy Frame
Details
04-17-2010
4.00
Assisted Gary with Bending the Canopy Frame
Details
04-16-2010
6.00
Bent Canopy Bows
Details
04-16-2010
2.50
Assisted Gary with Bending Left Canopy Bow
Details
04-13-2010
2.50
Bent Canopy Side Bows
Details
04-13-2010
1.50
Bent Canopy Side Bows
Details
04-07-2010
2.50
Bent Canopy Bow
Details
04-02-2010
1.50
Worked on Bending Canopy Frame
Details
04-02-2010
4.00
Caulked Firewall Recess/Rt Stick Grip/Canopy Bow
Details
03-31-2010
0.10
Photos-Gary Drilling Canopy Rail
03-31-2010
4.00
Installed Canopy Rail
Details
03-30-2010
0.10
Photos-Canopy Bow Bending
03-30-2010
3.00
Attempted to Bend Canopy Bows
Details
03-23-2010
0.10
Photo-Canopy Bow
03-23-2010
2.50
Canopy Bow Bending
Details
03-22-2010
2.00
Made Relief Cuts on Canopy Rail Braces
Details
03-19-2010
3.50
Positioned Canopy Braces
Details
03-19-2010
0.10
Photos-Canopy Side Braces and Fuselage
03-18-2010
0.10
Installed the Canopy Center Support Bracket
Details
03-18-2010
2.00
Installed Canopy Tracks/Canopy Frame Fit
Details
03-17-2010
0.10
Photos-Canopy Tracks
03-17-2010
4.50
Made Nutplate Doubler Strips/Primed Pieces
Details
03-16-2010
2.00
Visitors-Labeled Wires and Cleaned up Fuselage
Details
03-16-2010
1.00
Cut Doubler Strips for Canopy Tracks
Details
03-09-2010
0.10
Photos-Canopy Frame and Track Spacers
03-09-2010
5.00
Drilled Canopy Rails to the Deck
Details
03-09-2010
3.00
Assisted Gary with Drilling Canopy Rails
Details
03-08-2010
0.10
Photos-Canopy Rollers in the Rails
03-08-2010
0.10
Made 1/16" Guide for Canopy Frame Offset
Details
03-08-2010
3.50
Ground Down Canopy Rollers
Details
10-12-2009
5.00
Trimmed Canopy Bow
Details
09-09-2009
6.00
Visitor/Drilled Support Arm/Riveted Bracket
Details
09-09-2009
0.10
Photos-The Drilled Bolt Holes for Roll Bar/Support
09-09-2009
0.10
Photos 2-Doubler Riveted to Center Rib
09-08-2009
0.10
Placed Wedges under the Canopy Roll Bar
Details
09-03-2009
0.50
Swapped Canopy Roller Screws
Details
08-22-2009
3.00
Canopy Handle and Latch
Details
08-21-2009
2.00
Canopy Rollers Modified
Details
08-15-2009
1.50
Riveted Canopy Slide Rail/Track
Details
08-14-2009
5.00
Lightening Holes in Canopy Skirts
Details
08-11-2009
2.50
Reworked Canopy Tracks
Details
06-25-2009
2.50
Bent Canopy Roll Bar
Details
06-25-2009
1.00
Assisted Bending Canopy Roll Bar
Details
06-24-2009
3.00
Drilled Canopy Deck Pilot Holes
Details
06-23-2009
1.00
Started Work on the Canopy Roll Bar
Details
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.