12-14-2013
0.10
Collected Tools and Supplies from MX Hangar
Details
12-13-2013
0.10
Moved RV from MX Hangar to My Hangar
Details
10-01-2013
1.50
Helped Move Equipment from Shop to Hangar
Details
09-23-2013
0.50
Delivered Ailerons, Flaps, and Wing Fairings
Details
09-10-2013
1.00
Cleaned up Hangar
Details
09-05-2013
3.50
Moved Wings to Hangar
Details
09-05-2013
3.50
Moved Wings and Tools to Hangar
Details
06-15-2013
1.00
Portrait Photos in the Sun
06-15-2013
1.00
Photos-Shop without the Fuselage
06-15-2013
1.00
Photos-Fuselage out of Shop
06-15-2013
1.00
Moving Fuselage into Hangar
06-15-2013
1.00
Moved Fuselage out of Shop
Details
06-15-2013
3.00
Helped with Moving Fuselage to Hangar
Details
06-15-2013
2.00
Drove Trailer with Fuselage to the Airport
Details
01-13-2009
0.10
Finished laying ceiling insulation
Details
01-12-2009
0.10
Laid more ceiling insulation
Details
01-07-2009
0.10
Installed Ceiling Insulation
Details
01-07-2009
0.10
Assisted with laying ceiling insulation
Details
06-23-2008
0.10
Photos-Exterior View of Shop
05-28-2008
0.10
Hung Spitire Artwork
Details
05-23-2008
0.10
Hung Patches on Wall
02-19-2008
0.10
Completed Storing Tools and Parts
Details
02-16-2008
0.10
Hung Another Shop Light over Work Bench
Details
02-15-2008
0.10
Hung Shop Light
Details
02-14-2008
0.10
Photos-Wall Decorations
02-14-2008
0.10
Decorated Walls/Disassembled Longeron Crate
Details
02-13-2008
0.10
Photo-Shelves in Place
Details
02-13-2008
0.10
Hung Shorter Shelf/Cleaned up Shop/Set up Plans
Details
02-12-2008
0.10
Finished Small Work Table/Hung 2nd Cupboard on Wal
Details
02-11-2008
0.10
Built Smaller Work Table and Set up Workbench Acce
Details
02-08-2008
0.10
Finished 2nd Workbench and Set Up Tables against W
Details
02-07-2008
0.10
First Workbench Built
Details
02-06-2008
0.10
Cupboard Hung and Took Compressor to Shop
Details
02-05-2008
0.10
Put up Shelving Units and Pegboards
Details
01-30-2008
0.10
Photos-Shelving and Wall Decorations
01-30-2008
0.10
Hung Wall Shelves for Tail/Control Surfaces
Details
01-29-2008
0.10
Photos-After Move-in
01-29-2008
0.10
Moved Aircraft from Old to New Shop
Details
01-28-2008
0.10
Took Tools/Supplies from Home/Tool Chest
Details
01-27-2008
0.10
Prepared Shop for Moving
Details
01-22-2008
0.10
Painted Walls and Ceilings
Details
01-21-2008
0.10
Finished Walls and Electrical Plugs/Hung Flouresce
Details
01-17-2008
0.10
Put up Ceiling and Started on Walls
Details
01-16-2008
0.10
Insulation, Hung Ceiling and Heater
Details
01-15-2008
0.10
Insulation and Electrical
Details
01-14-2008
0.10
Installed Wall Framing
Details
01-11-2008
0.10
Poured Concrete Floor
Details
01-09-2008
0.10
Spread Gravel Prior to Laying Concrete
Details
01-08-2008
0.10
Clean up Shop
Details
01-07-2008
0.10
Met w/Jeff Paden re New Shop
Details
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.