Powered By Kitlog Pro v2.0
Baker's RV-6
RV-6
Instrument Panel
Work Logs Found:
142
Category Work Time:
227 Hours
Date
Hours
Work Log Summary
Details
05-22-2014
2.00
Pitot-Static Check
Details
05-05-2014
0.30
??Talked with Jason-Aerotronics re Fuel Guardian
Details
05-04-2014
0.30
Pulled Fuel Level Sensor Wires from Under Panel
Details
05-03-2014
0.30
Changed out Dynon D-100 EFIS Battery
Details
12-13-2013
2.00
Attached P-1-0 Connector/Light Power Wires
Details
12-12-2013
1.00
Added BB's and Epoxy-Flox Slurry to Left Elevator
Details
12-11-2013
1.00
Completed P-1-0 Connector
Details
12-09-2013
3.00
AeroLed Wiring/Master-Slave Wires Connected
Details
12-06-2013
2.00
Spiral-wrapped and Labeled Wires
Details
12-05-2013
3.00
Wire Labels/Light Wires
Details
12-04-2013
2.00
WigWag Power Wiring
Details
12-04-2013
1.00
Replaced Light Switches in Panel
Details
12-04-2013
1.00
Removed Light Switches
Details
12-03-2013
3.00
Swapped CB's/Pitot Heat Wire/Panel Put Together
Details
12-02-2013
4.00
Removed CB's from Panel/Removed Wig-Wag
Details
12-01-2013
1.80
Connected Left Fuel Sending Unit Wire
Details
11-30-2013
1.00
Completed Fuel Guardian Wiring
Details
11-30-2013
1.00
AOA Tubing/Fuel Tank Sending Wire
Details
11-29-2013
3.00
Fuel Guardian Wiring
Details
11-27-2013
3.50
Moved RV to MX Hangar/Fuel Guardian Wires
Details
11-26-2013
2.00
Removed Dynon D-100/Routed AOA Tubing
Details
11-22-2013
0.20
Talked to Aerotronics re WigWag Light Change
Details
10-20-2013
2.00
Attached Comm and Transponder Antennas
Details
09-07-2012
2.00
Visited Shop/Evaluated Installations
Details
04-16-2012
1.00
Replaced Dynons/Reclamped Amp Wires
Details
02-18-2012
0.50
Pulled Cover off Lightspeed Wires
Details
02-02-2012
2.50
Installed Carb Heat Cable Bracket/Terminal Ends
Details
09-27-2011
1.00
Unused EMS-120 Wires Wrapped in Spiral Wrap
Details
09-16-2011
1.50
Checked Starter Switch Wiring/Made P-Lead
Details
09-01-2011
0.20
Flightline Interiors' Glareshield/Visitors
Details
07-18-2011
1.20
Cut Out Template for Glareshield
Details
07-18-2011
1.00
Assisted with Making the Glareshield Template
Details
05-05-2011
0.50
Drilled Pilot Hole in Firewall for Wiring
Details
05-04-2011
4.00
EGT & CHT Wires/Relabeled Dynon Wires/Visitors
Details
05-03-2011
1.50
Marked Dynon Wires
Details
02-10-2011
2.00
Drilled Attach Holes in Bracket/Cabin Heat Install
Details
10-08-2010
0.10
Dropped off Compass Bracket for Painting
Details
08-09-2010
0.10
Ship Zaon MRX back for Repair
Details
04-01-2010
1.00
Installed LEMO Headset Jacks
Details
04-01-2010
0.50
Disconnected Keep Alive Wire in Dynon EMS D-120
Details
03-18-2010
2.00
Smoke System Switches
Details
03-03-2010
2.50
Positioned Smoke System Remote Switch on Panel
Details
03-03-2010
0.10
Photos-Smoke System Switch/Top Skin
01-26-2010
2.50
Made Bolt Stand for Adel Clamp/Cabin Heat Control
Details
01-09-2010
3.50
Powered up Panel/OAT Wiring
Details
01-08-2010
0.10
Photo-Control Cable Bracket
01-08-2010
2.50
Add Static Line Bushings/Riveted Cable Bracket
Details
01-07-2010
2.50
Primed Control Cable Bracket/Added Nutplates
Details
01-06-2010
5.50
Tech Counselor Visit/Control Cable Bracket
Details
12-18-2009
0.10
Photos-Control Cable Bracket
12-18-2009
0.10
Photos-Air Vents/Snap Bushings for Carb Heat Cable
12-18-2009
2.00
Lt. Dimmer Connectors/Air Vents/MB Antenna
Details
12-17-2009
0.10
Photo-Springs around GPS and Fuel Guard Wires
12-16-2009
4.00
Control Cable Bracket/Air Vents/Firewall
Details
12-15-2009
2.00
Cap Screws in Instrument Panel
Details
12-07-2009
0.10
Photos-Wiring/ELT Wiring/Center Cabin Cover
12-07-2009
2.00
Looked over Instrument Panel/ELT
Details
12-07-2009
7.00
Inserted Tailwheel/Center Cabin Cover/ELT Antenna
Details
12-06-2009
0.10
Photos-Painted Canopy Parts/Static Tee
12-06-2009
0.10
Photos 2-Cooling Fan Wires Clamped
12-04-2009
1.50
WigWag Wiring/Clamps
Details
11-24-2009
0.10
Photos-Clamp/Flap Switch/Cooling Tubes
11-24-2009
5.50
Adel Clamps/OAT Wire/Clock
Details
11-21-2009
0.10
Photos-Instrument Shelf in Place under the Ribs
11-21-2009
0.10
Photos 3-Wire Clamping/Missing Screw on Clock
11-21-2009
0.10
Photos 2-Instrument Shelf Installed
11-21-2009
4.50
Added Components to the Shelf
Details
11-20-2009
4.50
Instrument Shelf w/Nutplates
Details
11-18-2009
0.10
Photo-Instrument Panel and bays
11-18-2009
4.50
More Adel Clamps/Inst Shelf
Details
11-17-2009
0.10
Photos-Instrument Shelf
11-17-2009
0.10
Photos 2-Instrument Shelf
11-17-2009
5.00
More Work on the Instrument Shelf
Details
11-16-2009
3.00
Started work on Instrument Shelf
Details
11-16-2009
0.10
Photos-Instrument Shelf Work
11-12-2009
1.00
Positioned Bezel Lighting Inverter/Edging
Details
11-06-2009
4.50
Switched Fuel Guardian position/Rib Brackets
Details
11-06-2009
0.10
Photos-Inst Panel Brackets/Adel Clamps
11-06-2009
0.10
Photos 3-Instrument Subpanel Mods
11-06-2009
0.10
Photos 2-Dimmer Connector/Avionics Relay
11-04-2009
3.00
Work on Fuel Guardian/Nutplates
Details
11-04-2009
0.10
Photos-Rib Bracket/Nutplate
11-03-2009
4.50
Doubler for WigWag Controller/Cooling Fan Wires
Details
11-02-2009
2.50
Brackets-LightSpeed Box/Rib Brackets
Details
10-31-2009
6.00
Rivet Gascolator Bracket/Made Instrument Shelf
Details
10-31-2009
0.50
Looked over Instrument Panel Component Layout
Details
10-31-2009
2.00
Evaluated Instrument Components Positioning
Details
10-21-2009
0.10
Photos-Preliminary Inst Panel Component Layout
09-28-2009
4.00
Vis-Trimmed Glareshield Edge of Top Skin
Details
09-26-2009
2.00
Filed Instrument Panel Edge/Trimmed Skin Edge
Details
09-25-2009
1.00
New Side Brackets/Filed Inst Panel Edge
Details
09-24-2009
4.00
Installed instrument Panel and Side Brackets
Details
08-13-2009
3.80
Drilled Center Rib Bracket/Riveted Canopy Rail
Details
07-30-2009
0.10
Van's Signature on Map Box Door
Details
07-08-2009
0.10
Received Icom A-210 after Factory Upgrade
Details
05-05-2009
3.00
Photos-Map Box Support Brackets Riveted in place
05-04-2009
4.50
Change Angle of Panel-Modifying Cutouts
Details
05-03-2009
1.00
Photos-Inst Panel Brackets/Headset Jacks
04-08-2009
1.00
Bent brackets for Inst Panel/Drill out skin rivet
Details
03-31-2009
0.10
Photos-Instrument Panel Inserted into Fuselage
Details
03-31-2009
0.10
Photos 3-Instrument Panel and Subpanel that needs
03-31-2009
0.10
Photos 2-Instrument Panel in Fuselage
03-31-2009
0.50
Helped insert panel into fuselage
Details
03-23-2009
0.10
Photos-Nutplates Riveted to Brackets
03-23-2009
0.10
Photos 3-Brackets and Center Rib Cutout
03-23-2009
0.10
Photos 2-Brackets Screwed to the Panel
03-23-2009
4.00
Attaching Screw Holes Drilled in Panel
Details
03-22-2009
0.50
Riveted Nutplates
Details
03-22-2009
2.00
Drilled Instrument Panel Brackets for Nutplates
Details
03-18-2009
0.10
Photos-Instrument Panel Angle Brackets
03-18-2009
0.10
Photos 3-Bracket Around CB's
03-18-2009
0.10
Photos 2-Instrument Panel Angle Brackets
03-18-2009
3.50
Cut More Indents out of the Angle Brackets
Details
03-17-2009
0.80
Worked on More Angle Brackets
Details
03-16-2009
1.50
Worked on Instrument Panel Brackets
Details
03-16-2009
2.50
Worked on Angle Brackets for Instrument Panel
Details
03-14-2009
1.50
Cut out Subpanel for Radio Stack
Details
03-13-2009
4.00
Started to Lay Out Bracket for Attaching Panel
Details
03-13-2009
5.50
Rudder Pedal Cotter Pins/Inst Subpanel Cutout
Details
10-06-2008
2.00
Electrical Practice
Details
09-16-2008
3.00
Determined Location of Sub-Panel Cutouts
Details
09-07-2008
2.50
Made Instrument Panel Cardboard Mockup
Details
12-04-2007
0.10
Photos-Radio Stack Construction-Aerotronics
Details
12-04-2007
0.10
Photo-Dynon EFIS Mounting Bracket
11-28-2007
0.80
Talked with Isaac-Aerotronics re Panel Changes
Details
11-26-2007
0.10
Photos-Poster Board in Position
Details
11-26-2007
0.10
Photos-Poster Board in Position
Details
11-26-2007
0.10
Photos-Poster Board in Position
Details
11-26-2007
1.50
Final Trimming of Plastic Panel/Shipped Plastic Pa
Details
11-23-2007
2.00
Riveted Template to Right Side of Plastic Panel
Details
11-16-2007
0.10
Photo-Lower Portion of Template on Left Side
11-16-2007
1.50
Make Template for Left Side of Instrument Panel
Details
11-15-2007
0.30
Jason-Aerotronics-WigWag, Avionics Switch, ELT swa
Details
11-10-2007
3.00
Placed 2nd Plastic Panel in Place to Check for Fit
Details
11-10-2007
0.10
Photos-Plastic Panel Clamped in Place/Cardboard Pa
11-08-2007
0.10
Received Second Plastic Panel
Details
10-26-2007
0.10
Checked Fit of Instrument Panel in Fuselage-Photos
Details
10-26-2007
0.10
Checked Fit of Instrument Panel in Fuselage-Photos
Details
10-26-2007
1.00
Checked Fit of Instrument Panel in Fuselage
Details
10-25-2007
2.00
Decided Upon Position of TruTrak Pilot II in Panel
Details
10-22-2007
0.50
Fit Plastic Panel in Fuselage
Details
10-20-2007
0.10
Received First Plastic Cutout of Instrument Panel
Details
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
3121
5540
Avionics
4
6
Canopy
334
544
Control Systems
8
12
Cowling
164
199
Empennage
326
666
Engine
84
124
Finish Kit
9
17
Firewall Forward
353
570
Flight Training
1
7
Fuselage
643
1225
Inspection
1
0
Instrument Panel
142
227
Interior
4
8
Landing Gear
28
46
Miscellaneous
22
13
Painting
113
256
Prop
3
4
Shop Construction
50
24
Systems
11
35
Tools
1
0
Weighing
8
7
Wings
686
1334
Wiring
126
216
Copyright © 2001-2024 Matronics. All Rights Reserved.