KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 7
Category Work Time: 42 Hours
 Date
Hours
Work Log Summary

Details

 09-23-2012
8.00
Cowl Top and Bottoms Rivited to Completion
Details
       

 09-22-2012
16.00
X-10 Cowl Upper and Lower Installation
Details
       

 10-24-2010
1.00
U-1057 A and B Wheel Fairing halves and drilled #
Details
       

 10-24-2010
4.00
U-1010-L/R Main Wheel Fairing Bracket
Details
       

 10-22-2010
6.00
Hidden Door Spring Hinge and Cam Locks
Details
       

 10-20-2010
4.00
Cutt 1.75" Slot in to Cowl and Let/Right 10 Inlet
Details
       

 10-16-2010
3.00
Air Cowl 10 Inlet
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.