KitLog pro

Powered By Kitlog Pro v2.0

Sonex N367SX
Work Logs Found: 126
Category Work Time: 268 Hours
 Date
Hours
Work Log Summary

Details

 04-20-2013
6.00
Wingtip position lights installed
Details
       

 03-30-2013
3.00
Wing installed
Details
       

 12-10-2011
7.00
Wing rigging day!
Details
       

 12-10-2011
0.10
Wing rigging day!
       

 12-10-2011
0.05
Wing rigging day!
       

 05-12-2011
0.50
Deburred wing step doublers
Details

 05-06-2011
1.00
Finished riveting aileron and flap
Details
     

 05-05-2011
2.00
Balanced aileron
Details
       

 05-02-2011
1.50
Installation of aileron and flap

 05-01-2011
4.00
Installation of left wing skins
Details
       

 04-30-2011
5.00
Installation of left wing skins
Details
       

 04-27-2011
1.50
Installation of left wing skins
Details
     

 04-26-2011
1.50
Finished installing the aileron push rods
Details
       

 04-25-2011
3.00
Installing aileron push rods
Details
       

 04-23-2011
2.50
Replacement of a few spar rivets
Details
       

 04-21-2011
2.50
Removal of spar rivets and installed conduit
Details
       

 04-20-2011
2.50
Left wing forward skin deburring and dimpling
Details
     

 04-19-2011
0.50
Advice from former Sonex builder
Details

 04-17-2011
1.00
Left wing forward skin deburring
Details

 04-16-2011
1.00
Main spar rivet inspection
Details
     

 04-15-2011
0.75
Left wing top aft skin deburring
Details

 04-13-2011
1.00
Left wing top aft skin deburring
Details

 04-12-2011
1.75
Left wing bottom aft skin deburring
Details

 04-10-2011
4.00
Left wing deburring and dimpling of forward ribs
Details
       

 04-09-2011
2.00
Left wing skin removal and deburring
Details
       

 04-05-2011
1.00
Installation of left skin step doubler
Details
       

 04-04-2011
1.50
Installation of left aileron
Details
     

 04-03-2011
5.00
Installation of left forward skin, flap, aileron
Details
       

 04-02-2011
0.25
Took a break to go flying
Details
     

 03-31-2011
1.00
Installation of left wing forward skin
Details
     

 03-30-2011
1.00
Installation of left wing forward skin
Details
     

 03-29-2011
1.00
Corrected Duckworks landing light mount length
Details

 03-28-2011
2.00
Installed the Duckworks landing light mount
Details
     

 03-27-2011
4.00
Pilot drilled the left wing lower aft skin
Details
     

 03-26-2011
4.00
Pilot drilled the left wing upper aft skin
Details
       

 03-24-2011
1.00
Installation of left wing upper aft skin
Details

 03-23-2011
1.00
Completed left wing rib installation
Details
     

 03-22-2011
2.50
Installation of the root rib
Details
       

 03-21-2011
1.50
Installation of the root rib
Details
     

 03-20-2011
1.00
Installation of the root rib
Details

 03-17-2011
1.00
Installation of the root rib
Details
     

 03-16-2011
1.00
Forward root rib reinforcement angles installation
Details
       

 03-15-2011
1.50
Root rib fabrication
Details
     

 03-14-2011
1.75
Rivet the ribs to the left wing spars
Details
       

 03-13-2011
2.50
Deburred left wing ribs and spars.
Details

 03-12-2011
3.50
Left wing rib installation
Details
     

 03-08-2011
2.00
Web and center spacers for left wing
Details
       

 03-07-2011
0.50
Web and center spacers for left wing
Details

 03-07-2011
1.00
Web and center spacers for left wing
Details

 03-02-2011
1.00
Cleaned and organized garage
Details
       

 02-28-2011
3.00
Sonex wing stand construction
Details
       

 02-27-2011
4.50
Installed aileron and flap
Details
       

 02-23-2011
2.00
Riveting of the right wing forward skin.
Details
       

 02-22-2011
2.00
Riveting of the right wing forward skin.
Details
       

 02-21-2011
2.00
Riveting of the right wing lower aft skin.
Details
       

 02-15-2011
3.00
Deburring and riveting of the right wing aft upper
Details
       

 02-14-2011
2.50
Deburring of the right wing skins.
Details

 02-13-2011
4.00
Pitot tube installation
Details
       

 02-10-2011
3.00
Pitot tubing bracket fabrication
Details
     

 02-09-2011
3.00
Push rod assembly
Details
       

 02-06-2011
2.00
Push rod assembly and wing tie down
Details
       

 02-03-2011
1.50
Deburring and dimpling of the forward wing skin
Details
       

 02-02-2011
0.50
Deburring of the right wing spar
Details

 02-01-2011
1.50
Deburring of the right wing.
Details

 01-30-2011
4.00
Deburring and dimpling of the right wing.
Details
       

 01-27-2011
1.50
Deburring of the forward skin and forward ribs.
Details

 01-25-2011
1.50
Drilled lower bell crank and tie down holes
Details

 01-23-2011
3.00
Finished up drilling right wing and attached flap
Details
       

 01-22-2011
3.00
Up drilling and attached aileron
Details
       

 01-19-2011
1.00
Up drilling of upper wing skins
Details

 01-17-2011
1.00
Fitting root doubler
Details
       

 01-16-2011
2.50
Upper forward skin
Details
       

 01-14-2011
0.50
Upper forward skin
Details

 01-13-2011
1.00
Lower forward skin
Details
     

 01-09-2011
4.00
Lower aft skin install and forward skin
Details
       

 01-05-2011
2.00
Lower aft skin install
Details
       

 01-04-2011
1.00
Lower aft skin install
Details
     

 01-02-2011
3.00
Upper aft skin install
Details
       

 01-01-2011
3.00
Upper aft skin install
Details
       

 12-31-2010
3.00
Upper aft skin install
Details
       

 12-30-2010
5.00
Right root rib installation
Details
       

 12-29-2010
1.00
Right root rib installation
Details
       

 12-27-2010
1.00
Right root rib installation
Details
       

 12-20-2010
1.00
Right root rib assembly
Details
       

 12-19-2010
1.00
Right root rib assembly
Details
     

 12-18-2010
1.00
Right root rib assembly
Details
     

 12-16-2010
1.00
Right root rib assembly
Details
       

 12-14-2010
1.00
Right root rib assembly
Details
     

 12-12-2010
3.50
Wing rib and rear spar installation
Details
       

 12-11-2010
2.00
Wing rib and rear spar installation
Details
       

 12-11-2010
2.00
Mated right and left spar
Details
       

 12-08-2010
3.00
Wing rib and rear spar installation
Details
       

 12-06-2010
1.00
Wing rib installation
Details
       

 12-05-2010
1.50
SNX-W14 print review
Details
       

 12-04-2010
2.00
Web and Center spacer fabrication.
Details
     

 12-04-2010
2.00
Left Hand Bellcrank Assembly
Details
       

 12-03-2010
2.50
Right Hand Bellcrank assembly
Details
       

 11-30-2010
1.00
Vertical channels and angle clips
Details
     

 11-29-2010
1.00
Bellcrank bearing epoxy
Details
       

 11-24-2010
8.00
Aileron Bellcrank
Details
       

 11-15-2010
1.50
Aileron Bellcrank print review
Details

 11-14-2010
2.00
Aft wing rib gussett installation
Details
     

 11-12-2010
2.00
Aft wing rib gussett installation
Details
       

 11-09-2010
2.50
Forward wing rib gusset installation and aft wing
Details
       

 11-08-2010
1.50
Forward wing rib gusset installation
Details
       

 11-07-2010
2.00
Forward wing rib gusset installation
Details
       

 11-05-2010
1.50
Forming gusset for wing ribs
Details
       

 11-03-2010
2.00
Rear Spar and SNX-W15 review
Details
       

 11-02-2010
1.00
Rear Spar
Details
       

 11-01-2010
1.50
Rear Spar
Details
       

 10-31-2010
2.00
Rear Spar
Details
       

 10-30-2010
5.00
Finishing left flap
Details
       

 10-27-2010
2.00
Left flap fabrication
Details
       

 10-26-2010
1.50
Left flap fabrication
Details
       

 10-24-2010
1.00
Aileron completion
Details
       

 10-23-2010
2.50
Installing aileron rib tips
Details
       

 10-20-2010
1.50
Aileron tip rib instalation
Details
       

 10-19-2010
1.50
Aileron tip rib installation
Details
     

 10-17-2010
0.50
Repair of left flap
Details
       

 10-17-2010
2.00
Left aileron completion
Details
       

 10-16-2010
5.00
Left aileron drilling and deburring
Details
       

 10-15-2010
4.00
Left aileron fabrication
Details
       

 10-12-2010
3.00
Completed right aileron
Details
       

 10-10-2010
5.00
Right aileron
Details
       

 10-09-2010
2.00
Aileron drive rib assembly
Details
     

 10-07-2010
2.00
Plan review of SNX-W03 and SNX-04
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.