KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 8
Category Work Time: 29 Hours
 Date
Hours
Work Log Summary

Details

 10-10-2010
8.00
Painting the inside with White Jet Flex water redu
Details
       

 10-02-2010
4.00
D-1015 Nose Gear Link Collar Assembly onto the sha
Details
       

 09-30-2010
4.00
painted WD-1031 Axle Flange onto the Nose Gear Leg
Details
       

 09-28-2010
3.00
Mounting Main Tires and Brake Mount Assembly to A
Details
       

 09-27-2010
4.00
SECTION 46-04 Landing Gear Mounting
Details
       

 09-26-2010
2.50
U-1001 L/R Main Landing Gears Legs Mounting to the
Details
       

 09-25-2010
2.00
Main and Nose Wheels and Tire Assembly
Details
       

 09-24-2010
1.50
Bolting Dyna-1 Engine Mount to Firewall Assembly
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.