Powered By Kitlog Pro v2.0
Alans Web Site
Zenith CH601 XLB
wing updates
Work Logs Found:
11
Category Work Time:
34 Hours
Date
Hours
Work Log Summary
Details
10-01-2010
2.00
finished riveting top skin flip over
09-19-2010
2.50
Riveted rear spar angles and doublers
Details
09-17-2010
2.00
deburred wing top, ribs and spars.
09-15-2010
3.50
Finished drilling top of wing skin.
Details
09-14-2010
4.00
drilled L angle braces on top wing skin
Details
09-13-2010
4.50
Cut and installed L angles between aileron control
Details
09-12-2010
2.00
drill holes to final size for A5 rivets
Details
09-11-2010
4.00
Install doublers on rear spar
Details
09-10-2010
3.00
front ribs and brackets
Details
09-08-2010
3.00
reinstalled front spar on rear ribs
Details
09-02-2010
3.00
removed old spar angle and installed new update an
Details
SITE NAVIGATION
Contact Builder
Zenith CH601 XLB Home
Category
# Logs
# Hours
All
145
404
Empennage
17
62
Engine
16
41
engine management
6
13
firewall
4
6
fuel tanks
4
8
Fuselage
9
28
ignition system
2
3
instrument panel
13
41
kit inventory
4
17
left wing
27
68
Miscellaneous
1
2
None
4
17
nose gear strut asse
3
2
right wing
23
60
Tools
1
2
wing updates
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.