Powered By Kitlog Pro v2.0
Demoted Priority
RV-8
Fuselage
Work Logs Found:
32
Category Work Time:
206 Hours
Date
Hours
Work Log Summary
Details
07-18-2009
0.00
First time out of the garage
Details
07-17-2009
15.00
Landing Gear
Details
06-14-2009
3.00
Aileron Trim Assembly
Details
06-13-2009
2.00
Aileron trim assembly
Details
06-12-2009
4.00
Flap motor and mechanism
Details
06-08-2009
10.00
Canopy slide rails & frame
Details
05-30-2009
6.00
Brakes and brake lines
Details
05-24-2009
12.00
Fuel System
Details
05-06-2009
4.00
Fuel Filter and fuel lines
Details
04-27-2009
8.00
Andair Fuel Valve
Details
04-22-2009
6.00
Aux Fuel Pump
Details
04-17-2009
2.00
tail wheel
Details
04-14-2009
8.00
Push rods and Elevators
Details
04-08-2009
5.00
Fabricated Elevator Push Rods
Details
04-01-2009
2.00
Empennage attach 3
Details
04-01-2009
5.00
Empennage attach 2
Details
03-29-2009
4.00
Empennage attach
Details
03-24-2009
5.00
Right console and begin empenage attach
Details
03-19-2009
10.00
Mixed Bag
Details
03-18-2009
10.00
Bulkhead cap
Details
03-01-2009
8.00
Front Seat Back
Details
02-25-2009
2.00
Throttle console
Details
02-24-2009
10.00
Details
02-15-2009
12.00
Floor/interior
Details
02-07-2009
8.00
Floors
Details
02-06-2009
8.00
Control column and sticks
Details
02-02-2009
2.00
Stick control assembly
Details
01-28-2009
5.00
Rear Rudder Panels and floor skins
Details
01-22-2009
7.50
Rudder Pedal Assembly
Details
01-17-2009
8.00
Interior paint.
Details
01-10-2009
6.00
Fitting Landing Gear part Deux
Details
01-04-2009
8.00
Fitting landing gear legs
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
75
588
Empennage
31
161
Engine
1
Firewall Forward
3
8
Fuselage
32
206
Goodies
2
Instrument Panel
2
202
Interior
1
3
Quick Build Kit
2
Wings
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.