Powered By Kitlog Pro v2.0
JOHN'S WEB SITE
STOL CH750
Fuselage (Front)
Work Logs Found:
27
Category Work Time:
87 Hours
Date
Hours
Work Log Summary
Details
08-24-2011
3.00
Seats
Details
06-15-2011
4.00
Cabin Side Braces
Details
06-08-2011
4.00
Passenger seat bottom, Cabin frame
Details
06-01-2011
4.00
Big Day. Sitting in the plane the first time
Details
05-29-2011
4.00
Installed main gear for the first time
Details
05-28-2011
3.00
Nose gear
Details
05-21-2011
5.00
Firewall, nose wheel
Details
05-19-2011
1.50
Started to rivet firewall
Details
05-18-2011
3.00
Nose gear
Details
05-15-2011
5.00
Rudder pedals and brakes
05-11-2011
3.00
Brake mount brackets
Details
05-08-2011
4.00
Rudder pedals
Details
05-07-2011
5.00
Main gear axel
Details
05-04-2011
3.00
Debur firewall
Details
05-01-2011
3.00
Brake pedals
Details
04-26-2011
4.00
Firewall
Details
04-24-2011
3.00
Completed the firewall build
Details
04-23-2011
4.00
Placed the bottom brackets
Details
04-20-2011
2.00
Cut the bottom two tubes of the "cage."
04-16-2011
3.00
Cut the top pieces of the "cage"
Details
04-12-2011
1.00
Starting the build again
Details
10-19-2010
1.00
Controls
Details
10-13-2010
4.00
Front Fuselage
Details
10-09-2010
3.00
Controls
Details
10-06-2010
4.00
Front Fuselage
Details
08-16-2010
1.50
Back to the firewall
Details
08-12-2010
2.00
Firewall
Details
SITE NAVIGATION
Contact Builder
STOL CH750 Home
Category
# Logs
# Hours
All
67
234
Empennage (Elevator)
5
22
Empennage (Horz Tail
6
26
Empennage (Rudder)
5
13
Fuselage (Front)
27
87
Fuselage (Rear)
13
50
Miscellaneous
5
14
Wings
6
22
Copyright © 2001-2024 Matronics. All Rights Reserved.