Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
RV-7A
Empennage
Work Logs Found:
128
Category Work Time:
254 Hours
Date
Hours
Work Log Summary
Details
06-26-2009
1.50
Assembling the Empenage
Details
06-26-2009
2.50
Assembling the Elevators
Details
06-26-2009
1.50
Assembling the Elevators
Details
06-21-2009
2.50
Assembling the Elevators
Details
06-21-2009
2.50
Assembling the Elevators
Details
06-13-2009
1.00
Assembling the Empenage
Details
06-13-2009
0.50
Assembling the Elevators
Details
06-12-2009
2.00
Assembling the Elevator
Details
06-07-2009
2.00
Assembling the Elvators
Details
06-07-2009
2.00
Assembling the Elevators
Details
06-07-2009
2.00
Assembling the Elevators
Details
05-31-2009
1.00
Assembling the Elevators
Details
05-31-2009
1.00
Assembling the Elevators
Details
05-24-2009
1.00
Assembling the Elevators
Details
05-24-2009
1.00
Assembling the Elevators
Details
05-23-2009
0.50
Assembling the Elevators
Details
05-23-2009
0.50
Assembling the Elevators
Details
05-17-2009
2.00
Assembling the Elevators
Details
05-16-2009
2.00
Assembling the Elevators
Details
05-16-2009
2.00
Assembling the Elevators
Details
05-16-2009
2.00
Assembling the Elevators
Details
05-16-2009
1.00
Assembling the Elevators
Details
04-26-2009
2.50
Assembling the Elevators
Details
04-19-2009
3.00
Assembling the Elevators
Details
04-19-2009
3.00
Assembling the Elevators
Details
04-18-2009
4.00
Preparing the Elvators
Details
04-10-2009
2.50
Preparing the Elevators
Details
04-10-2009
2.50
Preparing the Elevators
Details
04-05-2009
4.00
Preparing the Elevators
Details
04-04-2009
4.00
Preparing the Elevators
Details
04-03-2009
1.00
Preparing the Right Elevator
Details
04-01-2009
1.00
Preparing the Left Elevator
Details
03-21-2009
2.00
Preparing the Left Elevator
Details
03-21-2009
2.00
Preparing the Left Elevator
Details
03-20-2009
3.00
Preparing the Left Elevator
Details
03-15-2009
2.00
Preparing the Left Elevator
Details
03-01-2009
2.00
Preparing the Left Elevator
Details
02-28-2009
2.50
Preparing the Left Elevator
Details
02-28-2009
2.00
Preparing the Left Elevator
Details
02-08-2009
2.00
Preparing the Left Elevator
Details
01-24-2009
1.00
Preparing the Left Elevator
Details
01-24-2009
1.00
Preparing the Left Elevator
Details
01-18-2009
1.00
Preparing the Left Elevator
Details
01-11-2009
3.00
Preparing the Left Elevator
Details
01-10-2009
2.00
Preparing the Left Elevator
Details
01-10-2009
2.00
Preparing the Left Elevator
Details
11-14-2008
1.50
Preparing the Left Elevator
Details
11-14-2008
1.50
Preparing the Left Elevator
Details
11-01-2008
1.00
Preparing the Right Elevator
Details
10-31-2008
3.00
Preparing the Right Elevator
Details
10-31-2008
2.00
Preparing the Right Elevator
Details
10-25-2008
2.00
Preparing the Elevators
Details
10-19-2008
1.00
Preparing the Elevators
Details
10-17-2008
1.00
Preparing the Elevators
Details
10-12-2008
1.50
Riveting the Vertical Stabilizer
Details
10-12-2008
1.50
Riveting the Vertical Stabilizer
Details
10-05-2008
1.50
Riveting the Vertical Stabilizer
Details
10-05-2008
1.00
Riveting the Vertical Stabilizer
Details
10-04-2008
1.50
Riveting the Vertical Stabilizer
Details
09-14-2008
0.50
Riveting the Rudder
Details
09-14-2008
2.00
Riveting the Rudder
Details
09-14-2008
1.00
Riveting the Rudder
Details
09-13-2008
3.00
Riveting the Rudder
Details
09-13-2008
2.00
Riveting the Rudder
Details
09-13-2008
1.00
Riveting the Rudder
Details
09-07-2008
3.00
Riveting the Rudder
Details
09-07-2008
2.00
Riveting the Rudder
Details
09-07-2008
2.00
Riveting the Rudder
Details
09-06-2008
3.00
Riveting the Rudder
Details
09-01-2008
3.00
Riveting the Horizontal Stabilizer
Details
09-01-2008
2.00
Riveting the Horizontal Stabilizer
Details
08-31-2008
1.00
Riveting the Horizontal Stabilizer
Details
08-31-2008
4.00
Riveting the Horizontal Stabilizer
Details
08-30-2008
1.00
Riveting the Horizontal Stabilizer 4
Details
08-30-2008
5.00
Riveting the Horizontal Stabilizer 3
Details
08-30-2008
1.00
Riveting the Horizontal Stabilizer 2
Details
08-30-2008
1.00
Riveting the Horizontal Stabilizer 1
Details
08-24-2008
3.00
Riveting the Empenage
Details
08-23-2008
1.00
Riveting the Empenage
Details
08-17-2008
1.50
Riveting the Empenage
Details
08-10-2008
1.00
Riveting the Empenage
Details
08-09-2008
2.00
Priming the Empenage
Details
08-03-2008
2.50
Priming the Empenage, continued
Details
08-03-2008
0.50
Priming the Empenage
Details
08-02-2008
2.00
Painting the Empenage
Details
07-28-2008
2.00
Priming the Empenage
Details
07-27-2008
2.00
Priming the Empenage
Details
07-17-2008
2.00
Building the Empenage
Details
06-14-2008
2.00
Building the Rudder
Details
06-14-2008
2.00
Building the Rudder
Details
06-08-2008
2.00
Building the Rudder
Details
06-07-2008
2.00
Building the Rudder
Details
05-30-2008
2.00
Building the Rudder
Details
04-12-2008
1.00
Building the Empenage
Details
04-12-2008
1.00
Building the Empenage
Details
03-30-2008
1.00
Building the Empenage
Details
03-22-2008
2.00
Building the Empenage
Details
03-09-2008
3.00
Building the Rudder
Details
02-24-2008
3.00
Building the Horizontal Stabilizer
Details
02-18-2008
1.00
Building the Rudder
Details
02-17-2008
1.00
Building the Rudder
Details
02-11-2008
1.00
Building the Rudder
Details
02-10-2008
3.00
Building the Rudder
Details
02-10-2008
2.00
Building the Rudder
Details
02-09-2008
2.00
Building the Rudder
Details
02-08-2008
2.00
Building the Rudder
Details
02-08-2008
2.00
Building the Rudder
Details
02-03-2008
4.00
Building the Rudder
Details
01-27-2008
2.00
Drilling the Vertical Stabilizer
Details
01-25-2008
1.00
Drilling the Vertical Stabilizer
Details
01-20-2008
2.00
Drilling the Vertical Stabilizer
Details
01-01-2008
2.00
Drilling the Vertical Stabilizer
Details
12-16-2007
3.00
Drilling the Horizontal Stabilizer
Details
12-15-2007
3.00
Drilling the Horizontal Stabilizer
Details
12-08-2007
5.00
Drilling the Horizontal Stabilizer
Details
12-02-2007
4.00
Drilling the Horizontal Stabilizer
Details
12-01-2007
3.00
Preparing the Ribs
Details
12-01-2007
3.50
Drilling the Horizontal Stabilizer
Details
11-25-2007
1.00
Front Spar Assembly
Details
11-10-2007
3.00
Replacement Parts Arrive
Details
11-03-2007
2.00
Front Spar Assembly
Details
11-03-2007
3.00
Front Spar Assembly
Details
11-02-2007
2.00
Deburring parts and Front Spar Assembly
Details
10-27-2007
3.00
Rear Spar Assembly
Details
10-20-2007
2.00
Rear Spar Assembly
Details
10-20-2007
3.00
Rear Spar Assembly
Details
02-18-2007
1.00
Picked up 2nd Empenage Box and Inventoried parts
Details
02-12-2007
1.00
Picked up 1st Box from FedEx
Details
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.