The Redheads RV-7A Build SIte
Work Logs Found: 128
Category Work Time: 254 Hours
 Date
Hours
Work Log Summary

Details

 06-26-2009
1.50
Assembling the Empenage
Details
       

 06-26-2009
2.50
Assembling the Elevators
Details
       

 06-26-2009
1.50
Assembling the Elevators
Details
       

 06-21-2009
2.50
Assembling the Elevators
Details
       

 06-21-2009
2.50
Assembling the Elevators
Details
       

 06-13-2009
1.00
Assembling the Empenage
Details
       

 06-13-2009
0.50
Assembling the Elevators
Details
     

 06-12-2009
2.00
Assembling the Elevator
Details
     

 06-07-2009
2.00
Assembling the Elvators
Details
       

 06-07-2009
2.00
Assembling the Elevators
Details
       

 06-07-2009
2.00
Assembling the Elevators
Details
       

 05-31-2009
1.00
Assembling the Elevators
Details
       

 05-31-2009
1.00
Assembling the Elevators
Details
       

 05-24-2009
1.00
Assembling the Elevators
Details
       

 05-24-2009
1.00
Assembling the Elevators
Details
       

 05-23-2009
0.50
Assembling the Elevators
Details
       

 05-23-2009
0.50
Assembling the Elevators
Details
       

 05-17-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
2.00
Assembling the Elevators
Details
       

 05-16-2009
1.00
Assembling the Elevators
Details
       

 04-26-2009
2.50
Assembling the Elevators
Details
       

 04-19-2009
3.00
Assembling the Elevators
Details
       

 04-19-2009
3.00
Assembling the Elevators
Details
       

 04-18-2009
4.00
Preparing the Elvators
Details
       

 04-10-2009
2.50
Preparing the Elevators
Details
       

 04-10-2009
2.50
Preparing the Elevators
Details
       

 04-05-2009
4.00
Preparing the Elevators
Details
       

 04-04-2009
4.00
Preparing the Elevators
Details

 04-03-2009
1.00
Preparing the Right Elevator
Details
       

 04-01-2009
1.00
Preparing the Left Elevator
Details
       

 03-21-2009
2.00
Preparing the Left Elevator
Details
       

 03-21-2009
2.00
Preparing the Left Elevator
Details
       

 03-20-2009
3.00
Preparing the Left Elevator
Details
       

 03-15-2009
2.00
Preparing the Left Elevator
Details
       

 03-01-2009
2.00
Preparing the Left Elevator
Details
     

 02-28-2009
2.50
Preparing the Left Elevator
Details
       

 02-28-2009
2.00
Preparing the Left Elevator
Details
       

 02-08-2009
2.00
Preparing the Left Elevator
Details
     

 01-24-2009
1.00
Preparing the Left Elevator
Details
       

 01-24-2009
1.00
Preparing the Left Elevator
Details
     

 01-18-2009
1.00
Preparing the Left Elevator
Details
       

 01-11-2009
3.00
Preparing the Left Elevator
Details
       

 01-10-2009
2.00
Preparing the Left Elevator
Details
       

 01-10-2009
2.00
Preparing the Left Elevator
Details
       

 11-14-2008
1.50
Preparing the Left Elevator
Details
       

 11-14-2008
1.50
Preparing the Left Elevator
Details
       

 11-01-2008
1.00
Preparing the Right Elevator
Details
       

 10-31-2008
3.00
Preparing the Right Elevator
Details
       

 10-31-2008
2.00
Preparing the Right Elevator
Details
       

 10-25-2008
2.00
Preparing the Elevators
Details
       

 10-19-2008
1.00
Preparing the Elevators
Details
       

 10-17-2008
1.00
Preparing the Elevators
Details
       

 10-12-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 10-12-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 10-05-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 10-05-2008
1.00
Riveting the Vertical Stabilizer
Details
       

 10-04-2008
1.50
Riveting the Vertical Stabilizer
Details
       

 09-14-2008
0.50
Riveting the Rudder
Details
       

 09-14-2008
2.00
Riveting the Rudder
Details
       

 09-14-2008
1.00
Riveting the Rudder
Details
     

 09-13-2008
3.00
Riveting the Rudder
Details
       

 09-13-2008
2.00
Riveting the Rudder
Details
       

 09-13-2008
1.00
Riveting the Rudder
Details
       

 09-07-2008
3.00
Riveting the Rudder
Details
       

 09-07-2008
2.00
Riveting the Rudder
Details
       

 09-07-2008
2.00
Riveting the Rudder
Details
       

 09-06-2008
3.00
Riveting the Rudder
Details
       

 09-01-2008
3.00
Riveting the Horizontal Stabilizer
Details
       

 09-01-2008
2.00
Riveting the Horizontal Stabilizer
Details
       

 08-31-2008
1.00
Riveting the Horizontal Stabilizer
Details
       

 08-31-2008
4.00
Riveting the Horizontal Stabilizer
Details
       

 08-30-2008
1.00
Riveting the Horizontal Stabilizer 4
Details
       

 08-30-2008
5.00
Riveting the Horizontal Stabilizer 3
Details
       

 08-30-2008
1.00
Riveting the Horizontal Stabilizer 2
Details
       

 08-30-2008
1.00
Riveting the Horizontal Stabilizer 1
Details
       

 08-24-2008
3.00
Riveting the Empenage
Details
       

 08-23-2008
1.00
Riveting the Empenage
Details
       

 08-17-2008
1.50
Riveting the Empenage
Details
       

 08-10-2008
1.00
Riveting the Empenage
Details
     

 08-09-2008
2.00
Priming the Empenage
Details
       

 08-03-2008
2.50
Priming the Empenage, continued
Details
       

 08-03-2008
0.50
Priming the Empenage
Details
       

 08-02-2008
2.00
Painting the Empenage
Details
       

 07-28-2008
2.00
Priming the Empenage
Details
       

 07-27-2008
2.00
Priming the Empenage
Details
       

 07-17-2008
2.00
Building the Empenage
Details
       

 06-14-2008
2.00
Building the Rudder
Details
       

 06-14-2008
2.00
Building the Rudder
Details
       

 06-08-2008
2.00
Building the Rudder
Details
       

 06-07-2008
2.00
Building the Rudder
Details
       

 05-30-2008
2.00
Building the Rudder
Details
     

 04-12-2008
1.00
Building the Empenage
Details
       

 04-12-2008
1.00
Building the Empenage
Details
       

 03-30-2008
1.00
Building the Empenage
Details
     

 03-22-2008
2.00
Building the Empenage
Details
       

 03-09-2008
3.00
Building the Rudder
Details
       

 02-24-2008
3.00
Building the Horizontal Stabilizer
Details
     

 02-18-2008
1.00
Building the Rudder
Details
       

 02-17-2008
1.00
Building the Rudder
Details
       

 02-11-2008
1.00
Building the Rudder
Details
       

 02-10-2008
3.00
Building the Rudder
Details
       

 02-10-2008
2.00
Building the Rudder
Details
       

 02-09-2008
2.00
Building the Rudder
Details
       

 02-08-2008
2.00
Building the Rudder
Details
       

 02-08-2008
2.00
Building the Rudder
Details
       

 02-03-2008
4.00
Building the Rudder
Details
       

 01-27-2008
2.00
Drilling the Vertical Stabilizer
Details
       

 01-25-2008
1.00
Drilling the Vertical Stabilizer
Details
       

 01-20-2008
2.00
Drilling the Vertical Stabilizer
Details
       

 01-01-2008
2.00
Drilling the Vertical Stabilizer
Details
       

 12-16-2007
3.00
Drilling the Horizontal Stabilizer
Details
       

 12-15-2007
3.00
Drilling the Horizontal Stabilizer
Details
       

 12-08-2007
5.00
Drilling the Horizontal Stabilizer
Details
       

 12-02-2007
4.00
Drilling the Horizontal Stabilizer
Details
       

 12-01-2007
3.00
Preparing the Ribs
Details
     

 12-01-2007
3.50
Drilling the Horizontal Stabilizer
Details
       

 11-25-2007
1.00
Front Spar Assembly
Details
     

 11-10-2007
3.00
Replacement Parts Arrive
Details
     

 11-03-2007
2.00
Front Spar Assembly
Details
       

 11-03-2007
3.00
Front Spar Assembly
Details
       

 11-02-2007
2.00
Deburring parts and Front Spar Assembly
Details
       

 10-27-2007
3.00
Rear Spar Assembly
Details
       

 10-20-2007
2.00
Rear Spar Assembly
Details
       

 10-20-2007
3.00
Rear Spar Assembly
Details
       

 02-18-2007
1.00
Picked up 2nd Empenage Box and Inventoried parts
Details
       

 02-12-2007
1.00
Picked up 1st Box from FedEx
Details
       