KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
Work Logs Found: 40
Category Work Time: 188 Hours
 Date
Hours
Work Log Summary

Details

 08-01-2013
4.00
Programing the Dynon D180 & D100.
Details
       

 07-30-2013
4.00
Parking brake lever & wing root fairing.
Details
       

 01-27-2012
4.00
Updated Dynon avionics & installed nuplates on tip
Details
       

 06-25-2011
8.00
Updated Dynon equipment firmware.
Details
       

 05-29-2011
1.50
Com radio testing.
Details

 05-27-2011
2.00
Troubleshot Com radio and intercom.
Details

 05-24-2011
2.00
Installed the rest of my avionics.
Details
       

 05-23-2011
2.00
Installed some avionics into panel.
Details

 03-14-2011
6.00
Installed ELT remote controls.
Details
       

 03-12-2011
4.00
Installed CP side power port.
Details
       

 03-09-2011
6.00
Continued with ELT antenna.
Details
       

 03-07-2011
6.00
Continued the install of the ELT.
Details
       

 03-02-2011
4.00
Started install of ELT
Details

 02-25-2011
7.00
Installed coax to VOR antenna.
Details
       

 02-24-2011
4.00
Finished wiring AP74 harness & riveted doubler.
Details
       

 02-22-2011
6.50
Fabricated VOR antenna doubler.
Details
       

 02-21-2011
4.00
Wired fuse links & sketched doubler.
Details
       

 02-18-2011
6.00
Installed antenna coax cables.
Details
       

 02-15-2011
4.00
Started wiring the D180 EMS harness.
Details

 02-13-2011
4.50
Drilled holes and installed zip-tie mounts.
Details

 02-12-2011
6.00
Installed com & xponder antennas.
Details
       

 02-10-2011
4.00
Positioned aileron trim D-sub connectors.
Details
       

 02-08-2011
4.00
Wired GP circuits for trim & flaps.
Details
       

 02-05-2011
4.00
Prep for wiring EMS GP circuits.
Details
       

 02-03-2011
4.00
Wire grouping and hole drilling.
Details
       

 01-31-2011
3.00
Wired D180 power wire to E-Bus.
Details

 01-27-2011
3.00
Tested GPS pwr/data cable.
Details

 01-24-2011
6.00
Wired the GPS pwr/data cable.
Details

 01-20-2011
2.00
Ops checked the intercom!
Details
       

 01-19-2011
5.00
Wired GPS audio to music jack.
Details
       

 01-17-2011
4.00
Wire headset jacks.
Details
       

 01-14-2011
6.00
Wired intercom audio input wires.
Details
       

 01-11-2011
5.00
Wired the 10K pot for HS34 audio.
Details
       

 01-05-2011
4.00
Changed wiring schematicl
Details
       

 12-23-2010
4.00
Wrapping and tying off wires and bundles.
Details
       

 12-22-2010
4.00
HS34 harness wiring.
Details
       

 12-21-2010
8.00
Wired Dynon Smart Avionic Bus (DSAB).
Details
       

 12-20-2010
4.00
Installed PTT intercom switches.
Details
       

 12-19-2010
12.00
Intercom wiring diagram and research.
Details
     

 07-19-2010
6.50
Made Aux battery cables to contactor and ground.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.